20060275.pdfFINAL PROJECT APPROVAL FORM
TO:
DATE:
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTMENT DATE
PLE-S(GN
-----______.ENGINEERING DIVISION DATE
z
0
PLANNING DIVISION DATE
0
71
PROJECT
9
M
C
SITE ADDRESS
MO
PERMIT #100 (0 Q2 I A B# DATE INSPECTED Cl—,S
0
80
C
--19
= M
M z
DESCRIPTION OF WORK TO BE INSPECTEDL4( &X_,)6C ,- ClIf
A field inspection was conducted to determine compliance with -approved plans. Final approval
Fh
denotes that there are no objections from the above signed Department to the release of
0
_n -n
�
PERFORMANCE BONDS and the granting of:
-1
M M
GRANT FINAL PROJECT APPROVAL
0 Fn
0�
OM
C (n
K (0
M 0
z r
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
0 Copy of CONDITIONS given to owner/contractor by inspector
I
0
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0
M
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
1:tenip:b1dg:fonm:ocaprv1 3/25/04
Permit Inspection Details
Permit: BL020060275
PERMITTRAX
V
'E
04/05/2006 SMITH "i5 APPROVED
y
Total Time: 36
Total Inspections: I Total Time: 35
z
0
4
0
rQ
M
IT! 0
0
M
M
X
'IN3,
9
r
,
0 'n
in
M M
0
0 Fn
C Co
171
Z ro-
z
z
0',
0
M
7/2/2009 11:53:10 AM
Page I of I
7777'
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
SETBACKS ...................
FOUNDATION:
Footing ...............
Wall ................
Pier/Porch
ReYMnlng Wall ...........
Slab Insulation ..........
PLUMBING:
Underground .............
Rough -in ...................
Commercial Final
HEATING:
Gas Test ....................
Gas Piping .................
Equipment .................
Commercial Final
EXTERIOR SHEATHING
NAILING ...................
FRAMING ........................
FIRST FLOOR FRAMING
INSULATION ...................
Floor Insulation
Wall Insulation ...........
Ceiling Insulation
SHEETROCK NAILING
SPECIAL INSPECTION
MISCELLANEOUS ..........
FINAL APPROVAL FOR
OCCUPANCY ..................
z
ITI
C ITI
Ma
0
80
z: ITI
ITI z
C
,m T
3 (D
0
0
C ITI
cf)
Q 0
z
7`1
z
z
IT