Loading...
20060316A.pdf1 011, "C"'B" CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER PIAME,NAME OF BUSINESS CITY ZIP TELEPHONE MIN zip I TELEPHONE 10 0 [PERMIT ­­ExP1REs PERMIT 03/ NUMBER �Z'Tao - IOB 71- SUITEAPTI, ADDRESS PLAT NAMEiSUSDIVISION NO, LOT RE, LID NO LID FEE S PUBLIC RIGHT 05 WAY PER OFFICIAL STREET MAI EX' STING, PROPOSED REQUIRED DEDICATION __ IT METER SIZE-1-LINE SIZE No O""U... PRY REQUIRED I YES E3 NOO REMARKS OWNER�CONTPACTOR RESPONSIBLE FOR EROSION CONTROI-10FAINAGE 1.1*119*01zM �i,te Labor& I.d.stries RT JAX ACCOUNT PARCEL PROBE No q 4ED NO 111111111EI I NEW RESIDENTIAL DISH A C. 13 WAIVER ZONE SIGN AREA ALLOWED AL 11111T B I FI COMMERCIAL] ' M COMPLIANCE OR E3 STUDY AD ITION D I j['_]MIXED CHANGE OF USE UOTCOVERAGS REOUIRZO SETBACKS TFIT OPOSED SETBACKS RT; JRE.ODEI USE MULTIFAMILY S SIGN ALLOWED PROPOSED FRONT SIDE REAR I REPAIR .14AWN. YGE E] BENCE K ITT I ' PARKING LOTAREA PLA NNING REVIEWED By DATE - ._ DEMOLISH Fj TANK o OTHER RED D 'RGIIDED I CA ETAINING WALL F�RE SPRINKLER ROCKERY RE ALARM ARPO El ' "BE LADY REMARKS (TYPE OF USE. BUSINESS OR ACTWITY; EXPIIN. A UMB F NUMBER N 0 OF IES In STOR OWELL'RNG UNITS '0, E..BTRyC).N _ , F7,-E _ I XA2 0 U _2 rC.UPANT'4;?_- P S SPE PECIALIN 3CTION _j CONSULTANT REQUIRED YES REMARKS 117 W/?//� Amm BY VALUATION $ aafijj� V Description FEE Description —Sulcl.rg. FEE Plan Check H RCE LOT SLOPV� 1EITIODATE Building Permit City Surcharge PLAN CHECK NO: Plumbing Base Fee THIS PERMITAUTHORIZES ONLY THEWORK NOTED. THIS PERMIT COVERS WOR" TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC Mechanical Grading DOMAIN (CURB$, SIDEWALKS, DRIVEWAYS, MARQUEES. ETC.) WILL REQUIRE SEPARATE PERMISSIONI PERMIT APPLICATION: SEE ECDC 19.00.005(A)(5) PERMIT LIMIT: SEE ECDC 19,Q0.005(AUS) Eng, Review Recording Fee Engr. Inspection Plan Chk. Deposit SEE SACK OF PINK PERMIT FOR MORE INFORMATION A ;APPLICANT. ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS 5 N INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF 2 E MONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND I DL ED AL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIR TLY FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF THIS PERMIT SHALL NOT BE D DEEMED TO MODIFY. WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE o N OR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION,' 7,7 R.vBSw Receipt # — Fire Inspection Total Aml, Due LandscapelDsp, I Receipt IT I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION GIVEN is CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STAT LAWS REGULATING CONSTRUC- TION; AND IN DOING THE WORK AUTHORIZE. THEREBY. NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMENS COMPENSAT19)��URANCE AND Hew 18:2 CALL FOR INSPECTION (425) APPLICATION APPROVAL OF.—, OII.UA D-P�rl -v F­­ ,1W OFF71C �ALSIGNAIURE ATE t_7 'M" R< I DATE �71 7C 771 -0220 RELEASED., DKT EXT. 1333 ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 / IBC11O / IRC110. ORIGINAL FILE - YELLOW INSPECTOR PINK -OWNER GOLD - ASSESSOR 6105 PRESS HARD - YOU ARE MAKING 4 COPIES z 0 q 0 C FT 80 M IT Z z r--4 0 -n -n A MC 0 0 0 M C cl) C (j) M C.) Z z GO z 0 -i 0 B1 Permit Inspection Details Permit: BLD20060316A Pr-RMITTRA.', . ... .... knal 05/04/2006 READWIN 35 APPROVED y Total Time: 35 Total Inspections: I Total Time; 36 z 3: ITI C, 0 0 0 3: M ITI z C > E: P 0 "In n M M 0 r 091 C ITI 0 z 0 ITI 71912009 10:0t33 AM Page 1 of I 7777� RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall .......................... Pier/Porch .......... Retaining Wall ........... Stab Insulation PLUMBING: Underground ............. Rough -in ... ................ Commercial Final HEATING: Gas Test _ ................. Gas Piping ............... Equipment ................. Commercial Final EXTERIOR SHEATHING NAILING ................... FRAMING ............. .......... FIRST FLOOR FRAMING INSULATION ................... Floor Insulation Wall Insulation ........... Ceiling Insulation SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL-ROFr- .............. lip- z 0 4 0 R1 ITI M a 0 80 C -4 K = ITI M ,0 C > 0 _Ti n LU ITI ITI 0 0 C: IT C/) C V) Q 0 Z z z 9 0 M