Loading...
20060319.pdfDATE RECEIVED L "jot 0 PERMIT EXPIRES. CITY OF EDMONDS PERMIT NUMBER CONSTRUCTION PERMIT APPLICATION joG ADDRESS SUITSIART, 11�i5llkIFIIE Ol 111I1BSS,<" tj PLAT NAMEJSUBDVISK)N NO LOT NO, LID N MAILING ADDRESS o -)Ei v LJ LID FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET AP TL­, HIY 1.1=1. 1, P_, P__ 13 CITY TILIPHI E EXISTING _� I � � � PH.1.11C HI.DIREI)DEDICA11.14 FT__ n 0 [3 Ili; METER SIZE I LINE SIZE I NO. OF,FIXTURES FEW REQUIRED YES 0 No 0 ADDRESS REMARKS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROUDGAINAGE I —1 2� CITY CHECKED BY relief valve, an aPPruvt )ajjbill)n tank shall be on all hot water tanks - PROPERTY TAX ACCOUNT I RCELNO, 'AIIIA"01 OR CID SHORILINSOIA111 I INIPEO T"O' jC.­1cIE E.-T 13 YES RED I CM ZON SIGN AREA HEIGHT 0 NEW RESIDENTIAL LB..' '-EcH Do�� 0 WAIVER A—. le—ED ­0WED P—ED 0 AD DIT ION COMMERCIAL 11LIANCE OR 0 0 STUDY - PROPOSED SETBACKS (FT.) 0 MIXED USE CHANGE OF U E LOTCOVERAGE ALLOWED PROPOSED OQUIRED SETBACKS RT) P FRONT SIDE BEAR FRONT UR SIDE REAR 0 REMODEL 0 MULTIFAMILY 0 SIGN I 0 REPAIR 0 GRADING C,GS 0 (FENCE X FT.) "KING LOTAREA PLANNING REVIEWED BY DATE 0 DEMOLISH 0 TANK 017 -_ 0 HER REOID I PROVIDED t R INING WALL 0 FIRE SPRINKLER 0 REMARKS CARPORT ROOKERY SIN 08 ACTIVITY) EXPLAIN; FIREALARM JY�JOF NUMBER NUMBER OF OF IES — 0 STOS DWELL N UNITS' G I _K). f(JI0Z 0 CUP NT GCROUPA REQUIRED 13 YES -OLI-th-5 'T­c), Description FEE Description FEE Slate Surcharge HEAT SOURCE VESTED DATE Plan Check City Surcharge 117, Building Permit PLAN CHECK NO: Bes. Fee 941-) I A I Plumbing THI PERMITAUTHORIZES ONLY THE WORK NOTE . THIS PERMITCOVERS WORK To BE DO E ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC Mechanical DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION, Grading PERMIT APPLICATIOW SEE ECDC 19.00.005(A)(5) PERMIT LIMIT, SEE ECDC 19,00.005A�((B Engr. Review Recording Fee Plan Chk. Deposit SEEDACK OF PINK PERMIT FOR MORE INFORMATION Engr. Inspection 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE. HEIR% ASSIGNS AND SUCCESSOR$ IN INTEREST, AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF I E MONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND D ECTLY L CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIA A L FROM THE I SUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE D C IMED TO MODIFY, WAIVE On REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE .j NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDI NANCE PROVISION. Fire Review Fire Inspection Landscape Insp, Receipt N L I I Total Arm, Due Receipt It I HEREBY ACK OWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY A THORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S C�^ISATIOKI INSURANCE AND Row 18Z7. CALL FOR INSPECTION (425) APPLICATION APPMOVAL TNA - A PA-1 -II �19­ ol - 8,,Id,rg 09.m­ III—, DAPA, nd F­ — P.,,I VIA ­ePI 11 aCKID-91d 11 5PIm P10140d 111-At S SIGNATURE DATE G DAT�11� q �2Z6 77 1-0-101 P4 DWIL EXT. 1333 AT—TENtION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI. FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 I ISC110 I IRC110. ORIGINAL , FILE YELLOW INSPECTOR PINK . OWNER GOLD - ASSESSOR 6105 PRESS HARD - YOU ARE MAKING 4 COPIES z 0 ITI 0 3: C: In MID --10 00 C: M In Z to C 0 n ITI IT! 0 0 0 9 Cn M 0 Z r­ co z M Permit Inspection Details E Permit: BLD20060319 PERMITTP.Ax g jI­,6jl'—.#..,r­",� 10/04/2006 Sn..k 20 APPROVED y Total Time: 20 Total Inspections: I Total Time: 20 z 0 M C M 0 -40 C M IM C o-. n M M 0 0 C r Ca M 0 r > z z ITI 711120091:49:39PM Page I of I 77771,� RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ............... Wall ....................... Pie*r/pprch ............. z �,,Rsltalnlng Wall Slab Insulation .......... PLUMBING: Underground ............. 0 3: ITI Rough -In ................... 0 0 Commercial Final ITI HEATING: M Z JD Gas Test .................... C: > Z Gas Piping Equipment ................. 0 _n ,n Commercial Final Tl 1 171 EXTERIOR SHEATHING 0 ca 0 r- NAILING .......................... . IT! C 0) FRAMING ........................ co Q 0 FIRST FLOOR FRAMING Z INSULATION ................... ;a Floor Insulation z Wall Insulation ........... Ceiling Insulation z SHEETROCK NAILING SPECIAL INSPECTION ITI MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. -00, 420 wO 3(9?