20060321A.pdfFINAL PROJECT APPROVAL FORM
TO:
DATE:
MEMOTO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTMENT DATE_�t�—'C_
--ENGINEERING DIVISION DATE—
PLEAS-N
PLANNING DIVISION DATE—
z
0
0
PROJECT
R1
SITE ADDRESS
U5
PERMIT #'LQ _0�2'1 ADB# DATEINSPECTED
C M
M 0
0
80
a
DESCRIPTION OF WORK TO BE INSPECTED
M
n1z
A field inspection was conducted to determine compliance with -approved plans. Final approval
C: 2
> -4
denotes that there are no objections from the above signed Department to the release of
C: M
:� Vi
PERFORMANCE BONDS nd the granting of:
0 _n
n
GRANT FINAL PROJECT APPROVAL
M M
0 V;
0 r-
0 M
C Co
9 co
M 0
Z r-
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
0 Copy of CONDITIONS given to owner/contractor by inspector
x
I
z
H
3:
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
z
9
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
0
rn
I
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
1:tcnip:b1dg:fonns:ocaprv1 3/25/04
Permit Inspection Details
Permit: BLD20060321A
PERMITTr4Ax
01
0412512006 SMITH 35 APPROVED
y
Total Timw. 35
Total Inspections:
Total Time: 36
0,
M
M 0
CA
0 In
n
M M
Fn
rj)
M
0
0
0
-5!
Page 1 of I
t 712/2009 10:51:46 AM
.............
ITI
Rough -In
MO
0
Commercial Final
0
C
HEATING:
-4 r.
x ITI
IT! z
Gas Test ....................
jo-4
Gas Piping ...........
Equipment .................
w
O'n
Commercial Final
-4
EXTERIOR SHEATHING
NAILING ..........................
ITI
0-0)
0
FRAMING — .....................
0 i; - I
C C0
FIRST FLOOR FRAMING
ITI 0
INSULATION ...................
Z
Floor Insulation
-4
Wall Insulation
z
-4
Ceiling Insulation
SHEETROCK NAILING
z
9
SPECIAL INSPECTION
0
171
MISCELLANEOUS
FINAL APPROVAL FOR
OCCUPANCY ...............
r