Loading...
20060332.pdfSTATE L E SE NUMBER EXPIRATION DATE RIC I "ED IT EXPIRES CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION PERMIT NUMBER on _7 14� ADDRESS 1 -7 0 3 a4cLcl,on CorAgiqj 1TV,— PLAT NAMr1SUBOJVIS­ NO LOT AC,5 L�D N DrErs MAiLINGADDRESS 3 1 .11 PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING PROPOSED REQUIRED DEDICATION FT 00 13 00 CITY ZIP —J-1-11PHO" &:ve(di C� 9.)f N METER SIZE LINE SIZE No 01 FIX URES FEV REQUIRED YES C1 NO C! t ADDRESS X V w Ave- 1), 1- REMARKS OWAMCONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE 1t4,?Fr 7-1014 6TEZ,14 (�PTrc:, DRAI" CITY ZIP MoLf'Ascilf- qp�)Ic) 11IL11HONE NAME — 4,111cile,4NII JCILI EDGY DATE W, L"",_ f,11b, lee �R ,�I. , 31 ;Lj I DATd CITY Z'1P, DATE VARIANCE OR CU SHORELINE OR ADS# INSPECTION SEPA I N _t 14TLL000_ q76 hL _," 1,.-,V I �rNEW [g RESIDENTIAL �<PLUIVIMN. I ECIA rl ADDITION COMMERCIAL L0r0jMUL,T,EUAM, I COMPLIANCE OR 1:1 M9<5OUEE CHANGE OF USE F1 REMODEL 0 SIGN REPAIR CY-S FENCE 1:1 ( X DEMOLISH 0 TANK o OTHER RETAINING WALL " FIRE SPRI KLER T ��=R[] ROOKERY L_J FIREALARM (TYPg OR ACTIVITYJ EXEI.AIN: �SE�USINESS NUMBER NUMBER OF OF DWELLING STORIES UNITS DESCRIBE WORK TO BE DONE L,, C �- ,z *YREQ EG Y) DIC01I XT C1 N CA# 01 —05 ZONE SIGN(AREA I HEIGHT WAIVER 13 flv_D� AUL!�O 0 STUDY 8 LOT COVERAGE REQUIRED SETBACKS ITT) j WPROPOSED SETS CK FRONT ED PROPOSED G.T 34 VSRONT JIDS RsA "i # " 59,6 _ . N I PARKING LOTAREA PLANNING REVIEeED BY CAT RED PROVIDED 1 , coq to 't 907XI'M vc� 10 111, 'OL gI t� M X4 A fl'AiDW Of- ire' nw+u In, vt f t a I r-ep Dirt - en,-, xm i r_,+� � GO NT TYPE OF 17RFN 10 R"PPA SPECIAL INXYTION CO REQUIRED S 6 REMARKS GE0,Tf_RtLR�P �T w101`JD k�w I I P y wt Des cription FEE Description FEE Plan Check State urcharge 4/60 LbEL10PE% VESTED DATE gEE:OURCE Building Permit Building Permit City Surcharge PLAN CHECK NO: Plumbing Base Fee THISPERM AUTHORIZES ONLY THE WORK NOTE!D. THIS ERMIT COVERS WORK TO Mechainical Grading ;1,2 BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBIC DONIMAIN (CURBS, SIDEWALKS. DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: SEE ECDC ISBILODS(A)(S) Ergr. ReView Eng, Inspection PERMIT LIMIT. SEE ECDC 19.00.005(A)(6) SEE BACK OF PINK PERMIT FOR MORE INFORMATION o ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS Fire R.View 11 Plan Chk. Deposi 6?- ;APPLICANT, N INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF — 2 ED , WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AN. MON05MS F R DAMAGES OF WHATEVER NATURE. ARISING DIRECTLY OR INDIRECTLY ALLCLAJ Fire Inspection Receipt 4 17 -Z�t FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL No IT DEEMED To MODIFY WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITY*S ABILITY TO ENFORCE ANY ORDINANCE PROVISION,' Landscapoinsp. TO! I Amt. Due Recording Fee Receipt # INERERYACK OWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFO NATION APPLICATION APPROVAL GIVEN IS CORRECT; AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF TUN, T E OWNER. I AGREE TO COMPLY WITH CI Y AND STATE LAWS REGULATING CONSTRUC� CALL BPI, PdF­­P.Id.­ TION: AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION .—pi �� al--g—P �P­ 11-d.d I WORVMEN'S CO�PENSATION I SURANCE AND FIN 18:27. ALS SIGNATU,�. SIG NONED (425) �l � 771-0220C 0 �1 I, t��JDATE 'DATE B By I 'ATTENTION EXT. 1333 q-E. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI. ORIGINAL FILE - YELLOW - INSPECTOR FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 I IBC110 I IRC110. PINK -OWNER . GOLD -ASSESSOR 10104 PRESS HARD - YOU ARE MAKING 4 COPIES z 9 0 C 171 rn 0 -10 00 C -49 x ITI IT! z ,0-4 C 0 -n n IT, 0 0 0 M 0 F­ X z -4 z 9 0 ITI ow�r.,*�ill,���.i.�u,�)ii"i�,��p�;�,,,.6". FOR copy EROSION 11 CONTROL AND DRAINAGE MAR -7 VJr B �SI�TE PLAN, LOT # Owner; Hilicrest Construction Co., Inc. — MAR - 7 20 6 4 0, 003 Nassau Place r 24 HR. NOTICE REG. tt , ING �PAFI v N. , r . q FOR INSPECTION NILDING DEPARIE14T Evere WA 98201 f'7# cl ry or EOMWO) DS T�. It .ja. P.rce _ �PagFel Number.: um Er u"-�..Ytw F S Sit ddress: ite AKddr Lot Cove Impervious area House SF: P S.R FouseSF 1467 S.F. Overhangs 212 Lot SF 35% Allowed: 2437.4 S.F. DrivefWalk "5 Under/Over -970.4 S.F. Total A2754 Bench Mark- Top of Sewer manhole @ sw corner of project 191.26 167 Height Caics A _Z5 r - B Pump size ca Units Quan Tots s Z5, C Bathtubs 4 1 4 Comb. TubIS1 4 1 4 TER & SEWER D C I I lothes West I NSPECTIONS REQ'D Total 711.25 Dishwasher 1.5 1 1.6 132 Average 177.81 Lavatory 1 4 4 Kitchen sink 1.5 1 1.6 25' Allowed 25.0 Laundry sink 1.5 1 1.5 202.81 2 1 2. water clos 2.5 3 Max.Ht.Allowed Shower L Main Floor Elev. -Zk I� 27 Bldg. Heigh �A 5 L�Demand-qRM trom Chart 40 -7-0 Actual Height 202.7 1�1 P -- < CC'= 1 �R' 1 2 e 41e C.�41 e TRZADING CALCS. Footing Elev. Cut Area 2 1 25 =012mils."T S LU WrIk ((A+B)/2)-Footing Elev. 2.125 C= L) ((B+D)/2)-Footing Elev. 2,375 E ((D+C)/2)-Footing Elev. 4 CL ((C+A)/2)-Footing Elev. 3.75 0 5 1 3 06225 LU W 0- , W Average Cut 5 17- Volume :42'387.5,< N90*E V79 1-7& CL Cubic Yds. .67 6) 1 FTJ Downspouts will be connected to storm stub. Footing drains will also be con- 0 z t4 W g4 0 )k APPROVED BY PLANNING N w") nected to storm stub if grade allows, m-1/m\ 0 / I to I o (P and connection will be no less than .75' SCALE 1 INCH = 20 FT Vf_L-1DMVVV-�YLAC4-t�0-'1'2 below invert of footing drain line, If grade precludes such connection, F;ri-= AND AiD ADDAESS&GN iit:�URZD D� then a sump will be provided. After Recording Return To: HILLCREST CONSTRUCTION 4003 NASSAU PL EVERETT WA 98201 DECLARATION OF PRIVATE DRAINAGE EASEMENT AGREEMENT For and in consideration of the mutual benefits derived herein and other good and valuable consideration, receipt whereof is hereby acknowledged, the following party Hillerest Construction Company, INC., being the owner of lots 5, 6 and Tract 997, 's fil Charlotte Gardens, according to the plat recorded under Snohomish County Auditor e number 200510145249, hereby conveys and quit claims to the current and future owners, successors and or assigns ofsaid lot 5, ofthe above described property, a non-exclusive easement for private drainage facilities, including the right of reasonable ingress and egress to maintain and repair said drainage facilities over under and across the following described land of said parties herein: The northeasterly 25 feet of lot 6 and Tract 997, running parallel with the southwest boundary ofTract 999, and lying southeasterly of the catch basin as currently located and depicted within Tract 997, Charlotte Gardens, according to the plat thereof recorded under Snohomish County Auditor's file number 200510145249, records of Snohomish County Washington. Tax Parcel: 010372-000-005-00; 010372-000-006-00; 010372-000-996-00 This easement is appurtenant to the following described land owned by said parties z herein and the easement and covenants contained herein shall run with and burden the M property described herein. Said parties herein their successors and or assigns shall have the right to maintain and repair said drainage pipe line, provided however that the parties 55 -4 and their successors shall use reasonable care to restore the surface of the land and to 0 M replace the landscaping, plantings, lawn, personal property, and any other improvements, a 0 m to original or better condition. 0 -10 Ki m M z The doctrine of merger shall not apply with regard to the extinguishing of said easement herein. I Witness Whereof, this easement is executed thisl7day f&e4__�r2006. 0 COD 0 1 'n m M 055 0 Hillerest Construction Company, Inc. OM C (j) C' M 0 10 z z 0 0 m r z m m 0 i", 0 0 C M 71 STATE OF WASHINGTON COUNTY OF -5dA —'5 m z Onthis-U-1 day ofS�,� 2006, before me the undersigned, a notary public -n In and for the State of Washington, duly commissioned and sworn, o -n Personally appearedIA1 the . ............. . . m M Of Hillcrest Construction Company, Inc., to me proved with satisfactory evidence to be ra 0 0 Fn The of Hillcrest Construction Company, Inc., who executed the within C Ca C (0 -Vt M instrument Z 0 Acknowledged that ke signed and sealed the same as their free and voluntary act and -4 Deed, for the uses and purpo;ess�n mentionc d It Z A Z" Printed name of not z My appointment expires: m Residingat: S,IVASHINGTON cqy"61�1) 04��O. -ND. 1/2" REBAR & CAP -9704407-001-OVI-00 S# RM 17672 2&32-E X -040,--aar-014100 0 MrN OF NW PROP. COR. ---------- INUNK FENCE - M 'R ( Nj 4 4' HOG%MRE FENCE- z 0 0 a m a 0 i m 0 c m m z jo-I CE U5 0-11 n m M 0 M C cj) M 0 z 7'1 X z 0 m Eagle Eye'Consulting Engineers, PS PO Box 523 01alla, WA 98359 hoAeter@centurytel.net 2538574151 Fax 253 857-5759 To: Marie Harrison 1/31/2006 z City of Edmonds Edmonds, WA 98020 0 Re: Hillcrest Construction, # 17003 "n 17003 77th Place W MICROFILM m Edmonds, WA 98020 M Plan Review#: 05-576 -40 EECE #: ED 05-79 X M This project is approved for the Structural Architectural V&IAQC and Energy Only in z C permit. The drawing review has been completed and accepted for pernitit with the approved stamped drawings returned to the City of Edmonds. SO On n The following items have been redlined on the drawings: in m Sheet 4 footings under posts to be 13X3OX30 065 0 0 Fn Sheet 9 Shearwall & Holddown Notes: co m 0 Item #3 requires 3x foundation sill plate only. z Item #7 requires minimum 3x abutting panel edges. J. Item SW-3 footnote 3 applies. Your plans are being reviewed concurrently with the Building Department, Planning z -4 Department, and Public Works Engineering. Changes, clarifications or additional 2; Cn corrections may be required subsequent to the Building Department review, when z comments are received ftom the other concerned departments. 0 m Should you have any inquiries regarding this letter, please call Hoyt Jeter at (253) 857- 4151 between 8:00 am and 5:00 pm. By: Hoyt Jeter, PE President Bee 15 05 07.153p ROBERT M PRIDE INC 425 814 5672 P.1 Consulting Robert M. Peide, Inc. Engineer December 15, 2005 Mr. Jon Kvcmmo Hillerrat Construction RESUB P. 0. Box 3121 z 0 Everett, WA 08-413-1121 FEB 15 2006 Re� Geotechnical Inve-sl*aticin BUILDING DEPARTMEN Proposed Residences - Lots 2 end 4-7 CITY OF EDMONDS 17007 77th Place West 65 -4 x � I Edmonds, Washington 0 M C RMP ProjeeL No. 05-352-01 In -40 0 Dear Mr. Kvermno, -4 C x M This report presents the results of our site exploration and gentechnical evaluation for arden development in Edmonds. The in G, In Z 0-4 C 2 five single family residences the Charlotte. is situated adjacent to 77th Place and just north of 171s, Street 8W. It is 2; propef understood that single family residences will be constructed on these lots. � co f t e. till. urface soil The purpo,,(,, of this investigation was to establish the nature, o h 4; 11 rures, and to provide recommendations 0 -n 'n -4 x In conditions that will provide, suppoitto the SIT110-1 . , plans for these houses for the design and Construction oftbe foundations. Prelinlilla"Y m C) Fn 0 show that minorsite grading will be requi red to establish building pad grades. USGS Edmonds was used asa reference for this invesLigaLion. 0 an C co mapping for this area of In 0 site CoLidition Previous clearing and grading have been performed on this site, i n comim-Lion with the h is been paved and utilities have been overall six lot development, The access street installed to serve the residential lots, ObServatiOl Is of the ground conditions indicate , z that fill has been placed er Tno.q of the lots to create tile e.xisting gra des that slope ov generl Ily toward the northeast- z ly%ideuribisdeveop eit idtier i a A sLe( �p slope descends down toward the caster in I ai I e S nie on the easterly side ofthe plat is heavily m designated wetiand west of Lat #6. slope vines and native sill ohs, and there are some mature trees lomited on this covered with Ii/211:jv slope. Obser vations ofthis slope showed no evidence of gross failures native affect the proposed construction. or instability that would According to Minard (USGS - 1983) this area of Edmonds is underlain by glacial till advanced outw, ish deposits (QvII). Seven exploratory Lrenches were dug in (QvL) and the area ofthe proposed reside nces to confirm Lbia presence of fill soils and to classify �13203 1,101mgs F.-int U6- NE Kifkland, WA 9a034 Fa f�814-5872 Phone: 425-814-3970 Dec 15 05 07:53p ROBERT M.PRIDE ING 425 814 5672 P.2 December 15, 200-S Mr. Jon KverninO Puge 2 the underlying native, soils - The Lest P its encounLered. soft fill soils anti oi%anics to 11 tsthat depths oftwo feet and there was obvious construction debris and Lree rei nan ty sands that were buried in the fill. Be -low the fill were topsoil and medium dense sil were categorized as weathered till. d oil Lots 6and 7 that are oil the A majority Of the fill material on this plat is locate soft and loose fill tvith organics; and westerlyside of tile property. Up to soven feet Of, h 6 had fill and disturbed soils that debris were encountered on TXA #7. Lots 2 throng 4 feet as disclosed by the test pits. Groundwatersc.upage ranged from 1 to is rmicb as ese test Pits was not encountered in any of tile exploratory test Pits- Summary logs ofth swing No. I. are. shown on Appendix A and their locations are shown an Dr, Gettechtnical —Recommendations -face exploration, the proposed residence On the basis of our site inspection and subsu, )ugh 6 Must extend through the fi It a nd bear oil the medium foundations for Lots;� thr( dense to dense native silty san& Footing depths are, exiv.ded to lange from 2to as much as 5 feet to bear on the undisturbed native soils. An allowable soil bearing value avea minimum of 20clo psf may be used in the design ofthese footings that should h, depth of iti inches below flital exterior grade. This value may he increased by 1/3 to -00 pd account for temporary seismic or wind loading-, A passive earth pressure of — may be used to resist. lateral forces. Where fill soils exceed a depth ofahot five feet on 14t #7, it is recommended that the, bearing wall footingK be supported on driven Pi, pe piles either 3 or 1. inches in diameter. refusal into the These pilesshould be Schedule 80 galvanized pipe that are driven to'. uv,�, t defirted its less than one inch ofpenetratic . i Period of native till soils. Refusal is or 850# plicumatit! balunler- Lach pile 3o and 15 seconds, respectively using a 4,50 20 tolls, respectively for working capacity. may be loaded lip to 8 and Where pipe piles are used for foundation supporL they should be connected with concrete grade beams that also pr(pi(lesupport for tfte concrete slabs. If the upper fil soils are compacted with a vibratory roller to a depth of two feet, Ow noor slabs can be poured on the utimpacted fill. Sonic interior slab settlemetlL call be expected where the depth offill exceeds- three feet. Soule excavation "I be required to establish the building pad for the residence foundations. Excavated soils should not be used for structural fill kinder the residence, but may be placed in landscape' areas or hauled offbite. Normal erosion control procedures should be in place for cont;Lructiollt of this residence in the coming winter months, Site drainage improveluents will i ncl tide the installation of footing subdrains,area -W— KJ'-1.nS:W 911-- Fax: 425-014-5672 Phone: 42"14-3970 Z 0 M I I m M 0 C In m Z C 0 "n -4 m M a 0 0 C: m Co Co M 0 M Z -4 Cl) Z 0 Dec 15 05 07.53p ROBERT M PRIDE INC 425 814 5672 P.3 December 15,2005 Mr—lon Kvernmo Pagea drains and roof down drains. Discharge of these drains should bit i nL0 the existing storm water System installed as parl. of the street im Provements. Construction monitori ng a lid consi.11tation sonice.- should also be provided to verify that Subsurface condiuon,� are similar to those described in Lhig report. Should conditions be reve.aleil during constructi on that vary frorn the anticipated subsurface profile, we will evaluate those conditions and prnvide alternative recommendations where appropriate. chisions and recommendations prescritcd in this reporL are based on 1) our 'rho con fi 0 h ctual interpretation and. evaluation of soil conditions on this site, �—) con rmation f t e a -ulisurface conditions encountered during construction, and 3) thCassumption thaL observirtionand testing will be performed during the appropriate phases of sufficient the work, niendations i it this report were prepared inaccordance with our findings and recom a V. in Lbe Puget generally acceptod principle-, of getitechnical engineering, s pra ticod Sound -,irr.1 at the time our work was performed. W(.,. maRe no warranly, efflier express or implied. Please call me ifthere are, any que.gLions or you wish to discuss this report in grealer detail. RMpec Ally OV WAS71"N*F" Robert, M. Pride, P. E- principalGeotechnicalrin i �er dist: (2) Addressee 1�7j '14", rinp: . ......... �4372' o� Howes Point Drive NI: K11119M, Fax: 425-814.5872 phone: 425-814-3970 z 9 0 m =; *fl r a M In 0 0 in mz 'R > z O"n n m in 0 C in V) 0 M 0 z z 0 m Dee 15 05 07:53P ROBERT M PRIDE INC 425 814 5672 P.4 APPENDIX A Summary Logs of Test Pits Test Pit No. I —Lot 7 O.0 — 4.Oft FILL: Silty send; gray brown, soft, very moist; with Organics; 4.0 — 5.0 ft NATIVE $OIL: Silty sand and sandy silt; brown, moist, medium dense; Test Pit No. 2 —Lot 7 z 0 0,0 — 5,Oft FILL: Silty sand and sandy silt; gray brown, SOft. very moist; with organics and concrete debris; buried tree branch and roots; 6.0 — 7.oft NATIVE SOIL: Silty sand; brown, moist, medium dense to dense; A T, Test Pit No. 3 — Lot 7 a M C 0,0 — 71011 FILL: Silty sand and Sandy silt; gray brown, very moist, soft; with m 0 8 0 organics and roots; 7.0 — 7.5ft NATIVE SO IL: Silty sand; brown, moist, medium dense: no ;j z M M groundwater; C > Test Pit No, 4 — Lot 2 il; Silty sand and sandy silt; brown, very moist, soft; 0,0 — 1.0ft FILL: Topso moist, medium dense; no groundwater; Silty brown 061, _11 1.0 — 4.0ft NATIVE $OIL: sand; __1 x m Test Pit No 6 — Lot 3 in a 0 0.0 — 2.0ft FILL: Silty sand; brown, very mo ist, soft and loose; 9 CD 2.0 — 3.0ft NATIVE SOIL: Silty sand; brown, moist, medium dense: no M 0 z groundwater; W Test Pit No. 6 — Lot 4 0.0 — I 'Oft FILL: silty sand; brown, moist, loose: 1.0 — 2,5ft NATIVE SOIL: Silty sand; brown, moist, medium dense: z 65 T Pit No. 7 — Lot 6 est z 0 4 0.0 — 3.oft FILL: Silty send; gray brown, very moist, loose; NATIVE SOIL:. Silty sand; brown, moist, medium dense; M 3.0 — 4,Oft Test Pit No. 8 — Lot 6 0.0 — 4,0ft FILL: silty sand: brown, very moist, loose; NATIVE SOIL: Silty sand; brown, moist, medium dense: 4.0 — 5-0ft KiMand,WASBrig Fax: 426-814-5672 Phone: 425-814-3970 Deo 15 05 07!54p ROBERT M PRIDE INC 425 914 5672 P.5 z 0 -j m Ma 0 --40 31 0 C: kpw. M M Z > r- -4 4 ca 0 m 7 W, m 3-fP1.5 0 On, c co 90) M 0 r M 3: > z z 0 m Rep plat Map for Charlotte Gardens SITE PLAN "62-01 proposed CharkMe Garden 771hpla SWsnd1716t$"et Drawing No. ------------- t1- Fdmonds, Washington Consultin En 111ccr M. rnac. 11... - ---------- M PRIDE ING 425 814 9672 D" ps 09 05-.tep ROBERT Consulting Engineer Robert M. Pride, Inc. necember 1,00.1,; Mr. Jon 1(vewfunf) Hillc'est Construction z P. 0. Box 3=1 Everett, WA 98-3-1121 Propose. d Residences - Lots 3 - 6 -4 -n 771h Place WeA Edmonds, Washington m RMP Project No. Oa-3522-0 1 0 0 Dear Mr. Kvernmq, -4 -C 3: In Z request I have reviewed the plans forthe proposod.-Inglefamily residencesto he jo -I Atyour Constructed on I /.)ts 3 through 6 ill the Charlotte. Gardens plat oil -7711- Place West in Edmonds. These residences have been sited within the building setback limits as shown ? on onthedrawing4by Home Design. O"n W, sed on my site inspoo itions and geotechnical evaluation as discussed in my December o-,O and.islh reports, these sLiuctures can be constructed at their proposed locations m In without any impact on the a4jacent steepslope areas. Minimum sJop esetback distances 055 0 from the face of the slope to the exterior foundation walfs.is at least t5 feet on Lot.3,30 0;; feet On 1A)t 4, 35 feet on Lot s and 35 feet on Lot 6. in my opinion these setback C: on distances aresatisfacLoiy for the site andsubsurface conditions on these lImperties, and In 0 they willsatisfy tile requirements ofECDC *:�3.8o and --4.4o, Please call me ifthere are any questions regarding this submittal. z Respectfully, I z &A, 0 Robert M. Pride 11 E -4 0 Principal Geote�;nicall ED V, -,r In ftt: (21) Addressee A x\' ZASS' MIF Hillereaplat2 RESUB :F JAN 19 2006 BUILDING DEPARTMENT CITY OP EDMOIjT, Phone: 425-914-3970 T05S'H—oImeP1I1t67,,NE 1,11111.1A �98034 ...... . Fax: 426-0 14�%JT� COPY Consulting Robert M. Pride, Inc. Engineer February 10, 2oo6 Mr. Jon Kvernmo Hillcrest Construction Company P. 0. Box 3121 Everett, WA 98213 RESUB Re: Geotechnical Review FEB 15 2006 Z Proposed Residences M 170011to 17009 77th Place West BUILDING DEPARTMENT CITy OF EDMONDS Edmonds, Washington Plan Check #05-566,67,73,76,77 Dear Mr. Kvernmo, a M 0 C As requested by the City of Edmonds I have reviewed my prior reports prepared for the five proposed residences on Lots 2, 4, 5, 6, and 7 in this subdivision located along 771h M Z 0-1 Place West in Edmonds. Our geotechniral investigation performed on Lots 2 through 7 C 2 was summarized in the December 15th report, which will be submitted along with the plans and specifications for obtaining residential permits on these lots. The plans for the residential structures on each of the five lots were previously reviewed 0 'n and they were found to comply with the recommendations made in our geotechnical M M -report. Although Nelson Geortechnical was involved in the original platting of this 0 0 subdivision, we will be acting as the geotechnical engineer of record during construction 0 C: of the residences. Any field inspections that are required during site excavation/grading C V) Q 0 and during foundation installations will be performed, and field memos will be r- submitted for City review. Individual Agreement Forms for each lot will be signed and submitted along with this final review letter. Z -4 Please call me if there are any questions. Z Respectfully, rrV 0 M Robert M. Pride, P. E. 16,7, Principal Geotechnical Engineer dist: (1) addressee rmp: HillcrestReS4 13203 Holmes Point Drive NE Kirkland, WA 98C40 Phone: 425-814-3970 "-% ax: 425-814-5672 npr 28 06 llt53a ROBERT M PRIDE INC 425 814 5672 P.1 7V-0'??jFlELD MEMo,;t:-A r Dntc-. To: Fm Re.Ct� 4t2,0T) Lots q Projgct No: los� z P 1�e VV 1"'. 2._q . ..... . . . Idu" A A sk IA c L.A.: M 0 c M, 0 -n . .......... 51 m M m c CA M 0 r- ONDS CTS. kwces DEV :0 cl > ri 4 z 7 z 7­ m ".0 Robert M- Frldc, W. ConSultb% Esiginctr Height Calculation Worksheet Date --0 D� 3 Permit Number 03G Address 1-7��03ett-J Inspector Average Grade 1'7-7 1 81 0, Max Height (25'+Ave.) ';t 0.) Actual Height (A+B+C) 0 'M C M 80 M 10 0 -n "n XM M 'i" =(C 0 0 C ca C coo M 0 z z 0 M Elevation of transit above Datum (B) 7,4& Datum M Elevation (A) c'. Utemp/building/fomis/height worksheet 7777� MICROFILM ofoccu ancy p DEPARTMENT OF BUILDINGS PER INTERNATIONAL RESIDENTIAL CODE SECTION R110 AT: 17003 771h Place W Building Permit#: 2006-0332 . . ........ Dwelling Units: occupancy established by this certificate: R3 No. Stories: _2 Basement:_ _NIA Type of Construction: Owner of building: Hillcrest Construction Co. ments of the The Sing a Fam! I w Re 9 ill, at 17003 77t' Place W —has been inspe d and approved complying with tl%�D require 200 dition of the International Residential Code as adopted by the City for the group and division of occupancy and the use for which The —proposed occupancy is classified. Issued this day of July. 2007 Chief Building Official By: Any change of occupancy or use requires a building permit and a now Certificate of occupancy Issued by the City of Edmonds Building Official. 04: Permit inspection Details Permit: BLD20060332 PERMITTf7l�w-'-', -tros to o on 1601�-'E loncont I/W 1611harti 0412 7/200 6 ES 1 5 T ES Cp a r City std's Total Time: 15 1013,- E-Storm tightfine corri plate,? -y 0 S/ 2612006 Hawkins 15 ok to backtill right line y Total Time: 15 1014 - E�Storm Conmet:tto Stub corn lete?, P , V", 0610912006 Hawkins io tight line connection to storm stub ok to backfill y Total Time; 10 10IT-E-Footing, Drain, Connection, Corn I tq?-, 06/0912006 11 Hawk ins 10 fociting connectin to storm stub ok to backfill Total Time. 10 1034'-'E-Wirtersormice Line., 06/1�12006 Hawkins 30 Water service line ok to backfill, not gmunded at the house and meter. y Total Time: 30 077 , �Ertglneering Final 09;2&ik06 Hawkins 45 Failed. Need to request driveway waiver. Driveway ecceeds the allow 14% slope. Also need N to satisfy tight line water test. 09/29/2006 Sibrol 0 Dwy waiver approved per Lyle Chrisman. y Total Time; 45 1106-B-Sotbacki com p'lete�?� 04M712666 MS 20 SETBACKS APPROVED PER STRUNG PROPERTY LINES Total Time: 20 rFo' I ';I'� 1108�- B; ot ngvi�� "Pl- T y 04/2712006 MS 20 FOOTINGS APPROVED y Total Time: 20 1410 -.B.Foundation'Wali Plate 04104/2006 Me 20 FOUNDATION APPROVED y Total Time: 20 I 1i 22 r', 1216IF16A Floor Framing j" OTO ollwood MS 20 FIRST FLOOR FRAMING APPROVED Total Time: 20 1126 - B-Plumb Rough I n 06t2O/2006 MS 20 PLUMBING ROUGH IN APPROVED Total Time: 112&- S-Gas Test/Filipe� complete? 05/27/2006 MS 20 G AS TEST AND GAS PI PI N G APPROVED Y Tot.] Time: 20 1132 - B-Exterlor Sheathing Conlrolata7l 06/20/2006 MS EXTERIOR SHEATHING APPROVED y Total Time: 20 1136 - B-Shear Nailing Complete? Y, 07/1212006 MS 20 SHIEARARPROV�D Y Total Tim.: 20 1146 - B-Height Vertficat o Pn complete�? 07/12/2006 MS 25 HEIGHT APPROVED y Total Time: 25 6/2312009 11:43:41 AM Page I of 2 z 9 0 C m MID 0 0 0 C: -4 C 3:2 m S -j > z 0 -n n M M a 0 0 M C ri) C 0) M 0 z z m B IF�, 1142 rarni n 07/12/2006 MS 25 FRAMING APPROVED Total Time: 25 e /2006 MS �5 WALL INSULATION APPROVED y Total Time: Is JI: 07/14/2006 MS 15 FLOOR INSULATION APPROVED y Total Time: is 6i irtsiil- 0 �d 0"6te 6)i812006 Snook 20 APPROVED" z Total Time: 20 0 c y 0 0712�/�gw MS 20 SHEETROCKAOPROVED Total Time: 20 09/28/2006 '-6nook 20 FINAL APPROVED y a Total Time: 20 M C: ITI N 0 0 signed off c 07/30/2007 clugston Total Time: 0 -4 C 3: IT ITI Z Alone: 23 Total Time: 425 10 4 c M C) 0 0 Cft 1710� X z z ITI 6123/200911*,43:41AM Page 2 of 2 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED yvv� A SETBACKS ............. FOUNDATION: Footing .......... Wall.......................... Pier/Porch ................. Retaining Wall ........... 0 M Slab Insulation .......... PLUMBING: Underground ............. 0 M U C 0 Rough -in ................... 17111 0 0 Commercial Final C —ji IT! j HEATING: M z vty\� C Gas Test ................. > U Gas Piping ........... Equipment 0 -n Commercial Final M ITI EXTERIOR SHEATHING a — CA NAILING ................... 0 0 vv-. ........... FRAMING ........................ Q 0 Z FIRST FLOOR FRAMIN 74 —7 1 f--c) Lo INSULATION ............. Floor Insulation 3: > z Wall Insulation Ceiling Insulation '0 (v 0) z SHEETROCK NAILING 2 0 SPECIAL INSPECTION M MISCELLANEOUS FINAL APPROVAL FOR OCCUPANCY .................. SwesiIII ZV/ �/� kil!15_14� 901* -03 DW wawmewslze ROW Datetssued-0? rxlllreS4�