Loading...
20060351.pdfCITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 121 5th Avenue North, Edmonds, WA 98020 (425) 771-0220 ORDER TO CORRECT VIOLATION Location of Violation (Address Cascade Villa 8 100 to 8104 23 8"' Street Southwest Drive, z Edmonds, WA 98026 0 Issued To: Sarah Walker, Property Manager 0)-4 In C '6 0 1h Address Of Person This Order Is Issued To: 8100 238 Street SW, Unit E Edmonds, WA 98026 0 3: M Code Section Violated:. International Building Code Section 109 and Edmonds Communit M Z Development Code Chapter 19.00.005#6b(ix) expiration ofdeck permits. C z -4 (4 Description of Violation: Deck permits expired. Work not complete. Reference pennits #2005-0737 0 -n -4 to #2005-0450. x 9 � I in M U C/) 0 0 Corrective Action Required: Submit new permit applications and required deck pennit fees. C (a C CA M 0 Z Correction is Required no later than: 5:00pm Atime) March 22,2006 Jdate) X -4 3: If correction is not made by the date and time specified in the Order, a Notice of Civil Violation shall be issued. The Notice of Civil Violation shall assess fines of z $100.00 per day, or portion of a day, during which the violation continues. rn Date Posted: Date Mailed: March 8, 2006 Date Served Issuing Part jeIgnine L. Gra Title Building Official Signature RT 0 80 c m 'T jo m m 0 ro 0, 091 9 cn M 0 z 0 0 APPROVED BY PLANNING M�� OMaoloo . I u cm a/vi bi, -to Its REC-FIXIED COUNTER Permit Inspection Details Permit: BLD20060351 E�11letrior,G ppurn, sfie itfil y 09128/2006 Snook 20 APPROVED y Total Time: 20 1142,- s-fratilling , ��: � :�': _ : 1%1% �1­ 1, , -1 07117/2006 MS 20 FRAMING APPROVED y Total Time: 20 r 'M I 0 'y 09128/2006 Snook 20 APPROVED z Total Timet 20 0 Total Inspections; 3 Total Time: 60 :rnC C M 0 C: TI ID C 0 -n N", "n im M 0 o Fn C 0) M 0 P Z r- z z 0 Im 719/2009 9:25:38 AM Page 1 of I RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ................... FOUNDATION: Footing ... ................... Wall ..................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... F5 PLUMBING: Underground Rough -In ................... a IT! C Commercial Final M 0 0 HEATING: C Gas Test ................ M 171 Gas Piping � ................ > Z Equipment ................. In Commercial Final 0 n -4 EXTERIOR SHEATHING x CM NAILING ................... 171 0 V5 FRAMING .................. 0 r- 0M FIRST FLOOR FRAMING_ C (1) r co Q 0 INSULATION ................... Z r- Floor Insulation W Wall Insulation > z Ceiling Insulation SHEETROCK NAILING z SPECIAL INSPECTION 9 0 M MISCELLANEOUS .......... FINAL APPROVAL FOR —0 _0%. OCCUPANCY &000