20060362.pdfFINAt, PROJECT APPROVAL �iRM
TO:
DATE:_Za-4,,,,7
MEMOTO: PERMIT COORD[NATOR,,BUILDING DIVISION
FROM: FIRE DEPARTMENT DATE
-ENGINEERING DIVISION DATE-
-PLANNING DIVISION DATE
95
PROJECT- /Qdz
C M
0
SITE ADDRESS.,24`// 6JA�&e&Z
M 0
80
A6a-J4�a_ADB#_DATE INSPECTED
PERMIT #,V
M
M Z
0
DESCRIPTION OF WORK TO BE INSPECTED
C
>
A field inspection was conducted to determine compliance with approved plans. Final approval
cl)
-n
denotes that there are no objections from the above signed Department to the release of
0
PERFORMANCE BONDS and the granting of:
'n T
0 cn
GRANT FINAL PROJECT APPROVAL
C: M
co
9 Cn
A 0
z
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
z
—4
0 Copy of CONDITIONS given to owner/contractor by inspector
Co
z
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0
M
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
L
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
I:tenip:bIdg:fom1s:ocaprv1 3/25/04
Permit Inspection Details
Permit: BLD20060362
PERMITTRAY,
09/28/2006 SMITHM 0 ADDITION APPROVED
y
Total Time: 0
Total Inspectiom:
Total Time: 0
0
:4 :fi
M
C
M 00
0
0-4
Z
X
0 -n
"n
V
M M
0
0
MZ 0
f
z
W
z
0
M
6/23/2009 8:51:16 AM
Page I of I
77t7
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
SETBACKS .....................
FOUNDATION:
Footing ...........
Wall ...............
z
Pier/Porch . ................
0
Retaining Wall M
Slab Insulation ..........
PLUMBING:
Underground
Rough -in ...................
Commercial Final
HEATING:
Gas Test ....................
Gas Piping .................
Equipment .................
Commercial Final
EXTERIOR SHEATHING
NAILING ..........................
FRAMING .....................
FIRST FLOOR FRAMING
INSULATION ...........
Floor Insulation
Wall Insulation . ..........
Ceiling Insulation
SHEETROCK NAILING
SPECIAL INSPECTION
MISCELLANEOUS
FINAL APPROVAL FOR
OCCUPANCY ..................
:4 ii
3:
C: M
M 0
-40
0 0
C
ITI
z
z
0 _n
n
M A
a
0
0 M
C co
C 0)
M 0
Z
>
z
co
z
M