Loading...
20060370.pdfAPPROVED BY PLANNING Zon,��6—L* cornerNDFla-290 Setback _Required AgLug Front C-3 C Sides W 3 Rear W Odw E Hiht 0 15� ALLEY (NOT IMPROVED) vd. u 59.95' 1 �---N S9d 6828 1 - EL59 95, EXIST RETAIN 3.GV HIGH I 6LL fm a c Vl?': I EXISTING ASPHALT' 92,00' m 0 4 0 S2 ........... 6.5. 0 C NEW 100'X 1460VOI�� DECK LINE AS j m l4owmv z c DECK EXTENSION ONLY TION TO EXISTING FOOTPFIINT­-j— JW N G E W XISTING DECK CK 0, I EXISTING HO USE n NO CHANGE TO FOOT PRINT XIST GAS METER m m 0 0 c 96LM r ca 0 EXISTING COVERED PATIO NO CHANGE XIST PAVERS 101I J(m li RICK FENCE z EXISTING GARAGE NO CHANGE 1IN 0) ..... ...... 1;02 W m WATER METER\ 106 .'--EXISTASPHALLCRI'_­_ 1 10" 21 N 58 13' E �59.95' P9d -SIDEW�LK - POWER CABLI LIGHTPOLE 9 —PHONE VALLI RECEIVED A. MAR 2 9 W6 ALDEFt "T BUILDING DEPT, --7eOT CITY COPY 0 , CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 121 5th Avenue North, Edmonds, WA 98020 (425) 771-0220 ORDER TO CORRECT VIOLATION. Location of Violation (Address and Tax Account Parcel No): 721 Alder Street, Edmonds, WA 98020 Tax Account Parcel.No. 00434209002700 z -04 0 Issued To: Gordon Gregg, Property Owner C" 1h Address Of Person This Order Is Issued To: 23005 7 Avenue West, Edmonds, WA 98026 rn to 0 0 Code Section Violated: International Residential Building Code Sections R105, 11109 & RIIO. M Description of Violation: Failure to call for all required inspections associated with Building. Permit C: -4 #2006-0370..and failure to complete work prior..to..the expiration date of the permit April 28, 2008 and vi failure to renew the permit by the expiration date. on -4 M op ard Corrective Action Required: Call for the required final inspections or submit a c y of the ob c M a Vi 0 0 showing all rNuired inspections have been performed and apigoved. Failure to respond by the not C deadline below shall result in the necessity to obtain a new permit with all new fees. C ca Q 0 z Correction is Required no later than: 5:009m Atime May 14,2008 (date) X If correction is not made by the date and time specified in the Order, a Notice of Civil Violation shall be issued. The Notice of Civil Violation shall assess fines of z 0 $100.00 Per day, or portion of a day, during which the violation continues. 0 M Date Posted: Date Mailed: April 29,2008 Date Served Issuing Party Jeannine L. Graf Title Building Official Signature ,�WAIV) r 0, Detailed Written Scope of Work Worksheet Owner: - Address: t�2— Plan Check h: Rl Provide a complete detailed written scope of work for the proposed project. Additions (additional square footage): Specify room use, floor level and square footage and direction ifapplicable (i.e. 545 square foot master bedroom/bathroom addition o 11 tile second floor with 140 square foot deck and 245 square foot kitchen addition on the main 0 0 floor, South side of house). Remodels (interior renovations): Specify room uses and floor levels (i.e. combine C C M bedrooms I and 2 on the main floor to create new master bedroom/bathroom; replace z dinning room sliding glass door with new French doors, reconfigure kitchen with new island prep counter and install new gas fireplace in the living room). 0 n V-c'cS 4. MC 4� mm 0(a 1:11 F-I all 0 0 C 0) m 0 Z fzAf-f2('-n'IYJ I tA It (AJ 04 0 D ST L/temp/building/forins/scopc ofwork CUSTOM DESIGN & ENGINEERING, INC. Structural Analysis 11006 60TH Ave West Structural Design Design Services Mukilteo WA 98275 (425) 343-7517 - fax (425) 493-8388 April 21, 2006 RE: Gregg Residence 721 Alder ST Edmonds WA 98020 00 Plan check 06-119 Basement & foundation assessment. The basement and foundation was assessed during the early stages of the design process. We found it to be in good condition. The overall design does not overload the existing foundation. The existing foundation will carry the reconfigured roof& floor system. New footings will be added where new point loads are added to the existing slab. AfICR01%44 36M WMES. Gt=�M R E 1SU B APR 2 12006 '31JILDING Drr-f�nINIFNT (AW OF EDMONDS z 0 rn -4 3: m C 0 1 m 0 1 80 C M M z '0-4 C A -1 0 m M .0 0 F, C cl) K co M 0 z ;0 z z 10 0 m Height Calculation Worksheet Date r7 Perr,�7,tNuniberDOCI'L�— (:5-3-7(3 Address 2,�j lnspcctor---10�%� Average Grade 97,77- z 0 m Max Height (2�;+Avc.)j22-.--7.-)- Actual Height (A+B+C) 13 X am C m 0 -4 0 m z j� r- -4 0 " -n =(C) m M 0 C z A z z z m Elevation of transit above Datum (B) Datum Elevation (A) t 1/teinp/buildiiig/foniis/heiglit worksheet N 7777M7 Permit Inspection Details Permit: BLD20060370 PERMIT 1106 - B-Setbacks Complete? y 0510512006 MS 20 SETBACKS APPROVED PER STRUNG PROPERTY LINES y Total Time; 20 1114. B4solated F00tings/Plign; Complete? y 05105/2006 MS 20 PIER PADS APPROVED y Total Time: 20 1126 - B-Plumb Rough In Complete? Y� z 07/03/2006 MS 25 CORRECTION NOTICE WRITTEN N 07/0712006 MS 15 ROUGH IN PLUMBING APPROVED y 0 Total Time: 40 1128 - B-Gas Test/Pipe Complete? y 07/0312006 MS 20 GAS TEST AND GAS PIPING APPROVED y rj) -4 Total Time: 20 3: 0 rn 1132 - B-Extenor Sheathing Complete? y M 0 0710712006 MS 20 EXTERIOR SHEATHING APPROVED y 0 OC Total Time: 20 -4 C 1136 - B-Shear Nailing Complete? y 3: Ing In z 0710712006 MS 20 SHEAR NAILING APPROVED y jo C z Total Time: 20 1140 - B-Height Verification Complete? y 07/07/2006 MS 20 HEIGHT APPROVED y 0 Total Time: 20 -n t 1142. B-Framing Complete? y 07tO7/2006 MS 25 FRAMING APPROVED y M m (—ft Total Time: 25 0 1144 - B-Wall Insulation/Caulk Complete? y 0 C 07117/2006 MS 20 WALL INSULATION APPROVED y C fit m 0 Total Time: 20 Z 1146 - B-Floor Insulation/Caulk Complete? y 07/1712006 MS 20 FLOOR INSUALTION APPROVED y Total Time: 20 1148 - B-Colling Insulation/Caulk Complete? y z 07/17/2006 MS 20 CEILING INSULATION APPROVED y -4 Total Time: 20 1150 - B-Sheetrock Nail Complete? y z 01 07131r2006 MS 20 SHEETROCK APPROVED y Total Time: 20 0 In 1168 - B-Building Final Complete? y 05119/2008 stelnike 20 y Total Time: 20 Total Inspections: 14 Total Time: 285 512012008 9:39:24 AM Page I of 1 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED vy) SETBACKS ..................... FOUNDATION: Footing ...................... Wall .......................... Pier/Potch .............. Retaining Wall ........... z Slab Insulation .......... 0 PLUMBING: Underground ............. 4v� �4 Rough -in .............. M Commercial Final C: 0 IT! 0 0 HEATING: -3 Gas Test .............. X M M z Le Gas Piping ................. jo Equipment ............ Commercial Final EXTERIOR SHEATHING -4 NAILING .............. 3: M M FRAMING........................ 0 FIRST FLOOR FRAMING... C rj) C co INSULATION ............. 1710 z Floor Insulation ;a Wall Insulation ........... x Ceiling Insulation z SHEETROCK NAILING z SPECIAL INSPECTION ITI MISCELLANEOUS FINAL APPROVAL FOR OCCUPANCY .................. ZOO 031