Loading...
20060395A.pdfCITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 121 5th Avenue North, Edmonds, WA 98020 (425) 771-0220 ORDER TO CORRECT VIOLATION Location of Violation (Address and/or description of location): 7804 175'h Street SW Edmonds, WA 98026 Tax Account Parcel No. 00810100000300 z Issued To: Jaime & Dianna Macandog, Property Owners Address Of Person This Order Is Issued To: 7804 1751h Street SW, WA 98026 0 M M 6 0 Code Section Violated:. Uniform Plumbing Code Sections 1,03 & 103.5 Description of Violation: 1) Installed gas fired hot water tank (reference plumbing pertnit #2006- 0395A) without obtaining City inspection approval and, 2) The plumbing permit expired on 11/6/06. Corrective Action Required: Call for the required plumbing inspection by calling the Inspection Hotline at 425-771-0220 extension 1333. Inspection hours are Monday..to Fridgy from 7:30am to 11:30 arn and 1:15vmto 3:45pm. Failure to call by the deadline below shall.result in the necessity of obtaining a new plumbing permit with new fees. Correction is Required no later than: 5:00pm #ime) November 27, 2006 (date) If correction is not made by the date and time specified in the Order, a Notice of Civil Violation shall be issued. The Notice of Civil Violation shall assess fines of $100.00 per day, or portion of a day, during which the violation continues. Date Posted: Date Mailed: November 8, 2006 Date Served Issuing Part Jeannine L. Graf -Title Building Official Signature x ,,n jo C E: 0 _n x m m 055 f 0 0 a C Cn in 0 z z 0 in Permit Inspection Details Permit: BLD20060395A PrRMIT*TRAX 11/20/2006 Snook 20 APPROVED y Total Time: 20 Total Inspections: I Total Time: 20 z 0 0 M -40 0 I IM i V jo C 0 M M 0 p Fn C Co M 0 z z i, 0 0 M 7/2/20091:11:04P M Page I of I 7777f" RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing...................... wall ........... Pier/Porch Retaining Wall ........... Slab Insulation .......... PLUMBING: Undergyound ............. Commercial na �EATIG N Gas Test .................. Gas Piping .............. Equipment Commercial Final EXTERIOR SHEATHING NAILING .......... ............... FRAMING ........................ FIRST FLOOR FRAMING INSULATION ................... Floor Insulation Wall Insulation ........... Calling Insulation SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. Yn) z F) 44 M C In A IR z 0-4 CF) M M a 0 M cl) ca M Z z z M