Loading...
20060396.pdf� I khmcks, S;de. kew- xx� lqghl"i4— JI, 12 Corner_\/ Flag Required Actual —JPc --6/ — za Ig' PROVED A PROVED rBY PL NING BY PL NING E E 20' Nok ko W — -Az. &';e�L S SCALE: 1" 16' -16" .14v.6' \.—�td IS' J "A-s z 0s "IS9 03 NOW —1001 m 0 0 nM. ra M z z 0, �2 0 ONd/ 3:9 m M LEL 0 0 M C (1) M 0 Z L----------------- --------- > z 3: GRADING z 38.47 CU. YOS. OF CUT TO BE 9 Prl;IDFNCE HER1 CAL.QA S RED ON SITE AND USED AS TO 0 A 95.2' FILL. EXCESS TO BE REMOVED. m a 102.2' C 96:5' 0 95.5' BUILDING, ROOF OUTIL 3151.51 b�. AVE, GRADE - 97,4' EX�STNG RESIDENCE EX NNG DRIVEWAY 1 549.00 SF, 1528,8± SF, RECEIVED ACTUAL HT. - 121.8' EXISTING DETACHED GARAGE 616.00 SF. MAX. HT, = 122.4' PROPOSED RESIDENCE ADDITION 810,57 SF. BASEMENT SLAB ELEV. . 95.7' PROPOSED DECK 600.57 SF. MAR 10 2006 PROPOSED COVERED PORCH 85.46 SF. ROTTOM QF FQOjjN= ADDITION & PORCH = 100.7 LOT COVEBAQ BUILDING DEPT. GARAGE (ATTACHED) - 95.0 3796 SO, FT (16.28%) LOT AS 23314.24 SO. FT. F 95�8 G 94.7 LOT SLOP : 5.3% H 95.6 AVE, GRADE = 95.6 ACTUAL HT - 110.4 WATER SERVICE —V MAX, HT. ALLOWED: 110.6 SANITARY SEWER SLAB ELEV. 95.5 CITY COPY Height Calculation Worksheet Date Perrrut Nmnbvrj�� "1 66 1 'a 6� 'ir,� Address I lnspector--A��- z Average Grade 0 Max Height '-I-Ave.) 10, (,"0 �n t,;, am C: Actual Height (A+B+Q 0 m m > z a, :C m M 0 t 0 F, =(C f C (n m 0': z z z 0 m Elevation ortransit above Daturn (B) DatunKI Elevation (A) t W, 1/temp/builditig/foniis/liciglit worksliect 7 7 ,777777-,` Permit Inspection Details Permit: BLD20060396 PERMITT'r"IX eig It V ierm"64 co- 05/11312006 Snook 30 APPROVED y Total Time: 30 _0� ple Z", _,y -A4 05/1612606 Snook 30 APPROVED y Total Time: 30 5 �c 10j0g;iii06 Snook 20 APPROVED y 0 Total Time: 20 0 Total Inspections: 3 Total Time: 80 M M C3 0 0 C M Z 0 -n M M 0 0 C M 0 M 6/11/2009 2:26:02 PM Page 1 of 1 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall .......... ............... Pier/Porch Retaining Wall z Stab Insulation .......... 0 PLUMBING: Underground ............. . �n Rough -In ................... M C: Commercial Final M 0 0 HEATING: 1= Gas Test 1 .................... . M ITI z Gas Piping C z Equipment Commercial Final _n EXTERIOR SHEATHING NAILING ............... .......... (0 M M FRAMING ........................ 0 FIRST FLOOR FRAMING 0 C cl) INSULATION ................... IT C) Z r_ 4 S>n Floor Insulation ;a -1 Wall Insulation ........... 3: z Ceiling insulation SHEETROCK NAILING z SPECIAL INSPECTION IT MISCELLANEOUS .......... FINAL APPROVAL FO R OCCUPANCY .................. boo.-