Loading...
20060406.pdfFINAL..PROJECT APPROVAL FORM TO: DATE: MEMOTO: 7PEto, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE ENGINEERING DIVISION DATE PLANNING DIVISION DATE PROJECT SITE ADDRESS 10 It, PERMIT #__Dk_ — 0 40 ADB# DATE INSPECTED 5- /2 DESCRIPTION OF WORK TO BE INSPECTED (,).5'T— A field inspection was conducted to determine compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PE.RFORNIANCE BONDS and the granting of: RANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector. FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector I 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature IAenip:bldg:fbrms:ocaprvI 3125/04 z 0 i 0 F C m m a 0 80 C --j K = M M Z 0 -q C 0 -n n m M m U) V) M z 0 X __4 x z --I C') z 0 0 m Permit Inspection Details Permit: BLD20060406 PERMITT;-AY, 05/26/2006 westfall 25 APPROVED y Total Time: 25 Total Inspections: 1 Total Time: 25 0 M C IM 0 0 C IM M z lo -q 0 -n M M 0" 0C M, M 0, Z z 0 M 71112009 12M:00 PM Page I of I PLUMBING: Unde!.g�oddd�z ........... M C gh-In ............ IT, 0 C6.m`erclat r-friali C -4 HEATING: 3: M ITI z GasTest .................... —Z Gas Piping .. ............... Equipment ........... Commercial Final -4 EXTERIOR SHEATHING NAILING ............ 0 0 FRAMING ................ 0) FIRST FLOOR FRAMING... INSULATION ................... Floor Insulation z Wall Insulation ........... Ceiling Insulation 0) z SHEETROCK NAILING SPECIAL INSPECTION 0 IT! MISCELLANEOUS FINAL APPROVAL FOR OCCUPANCY ............ ...