Loading...
20060428.pdfCITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 121 5th Avenue North, Edmonds, WA 98020 (425) 771-0220 ORDER TO CORRECT VIOLATION Location of Violation (Address and/or description of location), 9802 238th Street SW, Edmonds, z WA 98026 Tax Account Parcel No. 004463000040000 Issued To: Elizabeth Ford, Provert Owner =9 65 --j 0 x C M M 0 Address Of Person This Order Is Issued To� 9802 23e Street SW Edmonds WA 98026 0 80 C M ra Code Section Violated:. International Mechanical Code Section It 2. 1. z ace (reference mechanical pennit #2006-04281 co Description of Violation: 1) Installed pas fired on 11/16/06 . . ...... 0 -n without obtaining City inspection Approval and, 2) The permit expi -n T Corrective Action Required: Call for the required mechanical.. installation inspection by calling the 0 (n 0 Inspection Hotline at 425-771-0220 extension.. 1331. Insnection hours are Monday to Friday &om 0 C: ne below shall result in the 9 7:30am to 11:30 arn and 1:15prn to 3:45pm Failure to call by tbe,deadli M 0 necessi!y of obtaining a new mechanical pgnnit with new fees. Correction is Required no later than: 5:00pm -(time)__ December 21 �2006 (date) If correction is not made by the date and time specified in the Order, a Notice of Civil Violation shall be issued. The Notice of Civil Violation shall assess fines of $100.00 per day, or portion of a day, during which the violation continues. Date Posted: Date Mailed: December 7, 2006 .- Date Served Issuing Party Jean -nine L. Graf Title Building official Signature GARY HAAKENSON CITY OF EDMONDS MAYOR 121 STHAVENUENORTH - EDMONDS. WA9BQ20 - (425)771�0220-FAX(425)77i-0221 Websile: ­j.ed.-dS­..S DEVELOPMENT SERVICES DEPARTMENT q 'Zi Planning - Building - Engineering December 22, 2006 Elizabeth Ford 9802 238rh Street Southwest Edmonds, Washington 98026 RE: Order to Correct Violation Notice dated December 7, 2006 Dear Ms. Ford: As a follow-up to the referenced Order to Correct Violation Notice, the adopted building, plumbing, and mechanical codes for the State of Washington require that you (as the property owner) obtain all necessary permits and inspections associated with insta lation ent. The City has repeatedly attempted to contact you for of your gas furnace replacern on have also been advised that the next step in the purpose of scheduling an inspection. Y the City's enforcement process is to issue a Notice of Civil Violation and assess fines. The City is hesitant to use the Notice and assess fines but if the home owner ignores City requests or simply chooses not to communicate, the City has no other option but to continue the standard enforcement process (which is to issue a formal Notice of Civi Violation and impose fines of $100.00 per day), Please be advised once the Notice of until the violation is Violation is issued fines are immediately assessed and are in effect corrected. Please contact the City inspection hotline (425-771-0220 extension 1333) by January 11, 2007 for the purpose of scheduling a mutually agreeable day and time to perform the inspection. You may choose to have your installer on site when this inspection is performed in case corrections are noted that must be corrected. Failure to contact us by this deadline shall result in the issuance of the Notice of Civil Violation and fines will immediately begin to accrue. If you have any questions please feel free to contact me at 425-771-0220 extension 1226 during City business hours. Sincerely, Jeannine L. Graf Building Official Incorporated August 11, 1890 Sister City - Hekinan, Japan Permit Inspection Details IL Permit: BLD20060428 ..... ....... . ... c an c a, 11,, rnn 01/03/2007 Snook 20 APPROVED y Total Time: 20 Total Inspections: I Total Time: 20 z 0 M 0 C) ITI z Co 0 -n -n ;a M M 0 In Co IT, 0 z z z 0 ITI 7/9/2009 9�28:00 AM Page I of I RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing .................... - Wall ................ Pier/Porch ............. Retaining Wall ........... R1 Stab Insulation .......... PLUMBING: ITI C: Underground M 0 __10 0 Rough -In __ ............. C Commercial Final ITI M z HEATING: C Gas Test .................... Gas Piping ................. 0 -n _n Equipment ............. Commercial Final ITI ITI C7 65 0 EXTERIOR SHEATHING 0 M NAILING ........................ C in ITI 0 FRAMING ............... Z r- FIRST FLOOR FRAMING ;D --I INSULATION ................... Floor insulation z Wall insulation z Ceiling Insulation 0 -4 SHEETROCK NAILING 0 ITI SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY ........... UMPLETED