Loading...
20060457.pdfDATSISCE1110 jr-AMAI PERMIT EXPIRES CITY OF EDMONDS PERM T NUMBiER gob b - 05 CONSTRUCTION PERMIT APPLICATION 'A`OGRESS -L&4,01,6 SUITOAPT, &,e OWNER NAMONAME OF BUSIN FLAT NAME'S ... IVBI.N No, LOT 110, LID 10, MAI i GA OGRESS I LID E 5 PUBLIC RIGHT OF WAY PER CITICIAL STREET A' CITY Z11 EXISTING __ -, - _ � PROPOSED ___ -_ - - 14 2 REQUIRED DEDICAT ION _ FT — NAME METERT�� NQ OF FIXTURES PRV REQUIRED YES E3 NO 13 I I ADDRESS U REMARKS OMERICONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE ZIP ITELIPIO E NAME ENGINEERING REVIEWED 81 DATE ;700RESS F�E_CYCLE REVIEWED BY DATE CITY ZIP TELEPHONE USLIC WORKS REVIEWED By DATE z C C, I )Av1nwxxt4 0 STAIIE LICENSE NUMBER ON DATE FH—ECKED BY FIB E REVIEWED By DATE 0 ITT a -JC.V'_1'PA.EI1P1 ITY A C 0 PARCEL NO. I PROPERTY A VARIANCE OR CU SH.RELINEORAE)B# NS�PEEOCPON D YES a No WIA1 70— ZON N HEI.HI poss. SEI M N:W 0 RESIDENT IAL 0 WAIVER 1— 13 WAIVER, 2 'A w I r— N IA C M CIAL IMPLIANCE Oh 0 A DITION n CHANGE OF USE 13 STUDY LOTCOIERAGE REQUIRED SETS a D`T1 PROPOSED SETBACK$ (FT) BEAR 0 0 0 C: A� cpc�� ALLOWED PROPOSED G SIDEACK FRONT EAR FF1 AT URSIDE R C�PEMODEL E] MULTIFAMILY SIGN (,rfkNC!o5 2 FENCE 04�EIEPAIR 0 GRADING CYDS x FT.) '4 PLANNING REVIEWED 81 DATE MZ — [3 DEMOLISH 0 TANK Ei OTHER REOD I �O IIIID I GARAGE RETAININ WALL ,ZNKI�11 G 0 F:R SPRINKLES M F ALARM REMARKS REM' C ARPORT ROOKERY RE (TYPE OF USE. BUSINE S NO CA-WNbib- TV VLTCT-Auf� -n NU BER IF OF TYPE OF CONSTRUCTION J_IPECIA CODE OCCUPANT nin rn cc STORIES ROUP 7 a U5 00 DESCRISF MFIR TO BE DONE 4 P T -M L INXY.ION CONSULTANT j C o) E. IS F FE.U" K CD M0 zf­ BY: STH TURALOESIGN ev— B z VA 0 0 Description FEE Description I FEE Plan Check State Sur harg. HEAT SOURCE LOT SLOPE9. J VESTED DATE Building Permit 0 PLAN CHECK NO: M 0 Plumbing Base Fee 174,, 1 THIS PERMIT AUTHORIZES ONLY THEWORK NOTED. THISPERMITCOVE SWORK To ON T BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTI ON FIRE PUBLIC mechanical DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL SQUIRE 7r.dlg SEPARATE PERMISSION. PERMIT APPLICATION: SEE EC.0 19.00,005(A)(5) Engr. REVIEW Recording Fee co PERMIT LIMIT. SEE ECDC 19,00,005(A)(6) BE BACK OF PINK PERMIT FOR MORE INF RMATION S SZE a Engr. inspection Plan Chk. Deposit 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS. ASSIGNS AND SUCCESSO S CITY OF F Fire Review Receipt Race re IN NTEREST, AGREES TO,INDEMNIFY, DEFEND AND HOLD HARMLESS THE 2 EDMONDS, WASHINGTON, TS OFFICIALS, EMPLOYEES. AND AGENTS FROM ANY AND ALL LAIMS FOR DAMAGES OF WHATEVER NATURE� ARISING DIRECTLY OR INDIRECTLY Fire Total Amt. Due q1) III THE ISSUANCE 01 THIS PER.11 ISMANCe 01 THIS PERMIT SHALL NOT as IROC .EEMEOT MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 0 rInsPection Receipt N Race NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.' L Be p So. Landscapeinsp. APPLICATION APPROVAL I HERE K OWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION Byte N AGENT OF C LL CALL Tr,s `P X,t­­w, p—A uftl,�gn,d by th, III GIVEN IS CORAECT�, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- Suild,19 O,j,­,., ­­ DAIX,I, nV F­ F.d. FOR INSPECTION TION; AND IN DOING THE WORK AUTHORIZED THERE IY� NO PERSON WILL BE EMPLOYED 14 VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO COMPENSATIO URANCE A ACW 18�27. (425) �pl,,,Ckno�ledgldln$PICOP(011ded Ll TUBE DATE . 1 LWORKMEN'S DATE SIGNED St N A tNT�) 771 -0220 EXT. 1333 RELE Elk__ TENTION F BE R OCCUPY A BUILDING OR STRUCTURE UNTIL IT 1. UL T. U A IN PECTION AS BEEN MADE No APPROVAL OR A CERTI� U�A W ORIGINAL - FILE YELLOW INSPECTOR FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 / IBC110 I IRC110. PINK -OWNER GOLD - ASSESSOR PRESS HARD - YOU ARE MAKING 4 COPIES 6105 Permit Inspection Details Permit: BLD20060457 RERMITTPA�' 0412612007 Snook 30 APPROVED y Total Time: 30 Total Inspections: 1 Total Time: 30 kY, z 'M M M M z 10 4 M M 0 0 C M 0 3: z 0. 61512009 3:24:35 PM Page I of I 777777 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... wall................. Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final HEATING: Gas Test .................... Gas Piping .......... Equipment ................. Commercial Final EXTERIOR SHEATHING NAILING ................. FRAMING ................. FIRST FLOOR FRAMING... INSULATION ................... Floor Insulation Wall Insulation ........... Ceiling Insulation SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR vv-\ OCCUPANCY .................. C z M, C M 0 -10 00 C IT z 0-4 C j. 0 -n n Zo -4 IT! IT 0 0 0 IT C 0) K (1) 1 1 IT 0 ;13 z z 0 =4 0 ITI Materials Testing & Consulting, Inc. Geotechnical Engineering - Special Inspection Materials Testing Report #F 16925 FIELDREPORT Materials Testing & Consulting, Inc. FILE NO.: 06BI52-EDE 777 Chrysler Drive DATE: July 27, 2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Edmonds Elementary School Fax: (360) 755-1980 ADDRESS: 1215 Olympic Ave CITY: Edmonds, WA CLIENT: Edmonds School District # IS ENGINEER: Coughlin Porter, ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 204020 58" Ave. West CONTRACTOR* Artus Lynnwood, WA 98036-7400 PERMIT NO.: 2006-0460 (Edmonds) Time: Temp: MTC was on site as requested to inspect the lateral framing and epo�y- -The roof framing I sheathing and siesmic hardware for building D - 91- (Da to De, D1 to D11.3), Ill- D1.7 to D9, Da to Del, and the.roofing above the elevator was visually inspected per details 3 and 8 on sheet S3.1. The framing / seismic hardware was visually inspected per details 8, 12, and 16 on sheet S3.4 for the buildings B gL (134 to B5, Bb to Be.8) and building C qL (C4 to C5, Ca.3 to Ce). This work was on the 2 rat floor plan. The framing / seismic hardware was visually inspected per detail..4 on S3.2 at gL (Be to Bf, B4 to B5)._ on building B and qL (Ca to Cb, C4 to C5) on building C. This work is at roof level. To the best of my knowledge, this work is in compliance with the approved plans and specifications. REPORTED BY: R. Bichel, WASO..Inspector rc REVIEWEDBY: Steve Barrie, Technical Director DISTRIBUTION: original: choun(a)edmonds.wednet4edu cc: matt(&gnarclatects.corn cc: calvinPggarchitectsxonn cc: gorda(allornalls-corn..- cc: bryanz@cpllnc.mm 17 10 Midway Court - Centralia, WA 98531 - Phone (360) 330-7926 - Fax (360) 330-7946 1208 Bay Street, Ste. 100 - Bellingham, WA 98225 - Phone (360) 647-6061 - Fax (360) 647-8111 Website Address: www.tiitc-ine.net z 9 0 m M.T.C. Materials Testing & Consulting, Inc. Report #E 1495 INSPECTION, REPORT Materials Testing & Consulting, Inc. FILE NO.: 06B1 52-EDE 777 Chrysler Drive DATE: July27,2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Edmonds Elementary School Fax: (360) 755-1980 ADDRESS: 1215 Olympic Ave CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter Lundeen ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 020 68th Ave. West CONTRACTOR: Artus Lynnwood, WA 98036-7400 PERMIT NO.: 2006-0460 (Edmonds) Reason for Epoxy Inspection: Shown on plans or specifications El Intentionally omitted during original placement Other: El Needs Engineer's review and acceptance El Reinspection Product Name: Simpson Set 22 Approved by Engineer Batch#: 08127611 Manufacture Date: Expiration Date or Shelf Life: 1108 Batch #; Manufacture Date: Expiration Date or Shelf Life: qL (D2,8, Da to D 6" Hole Diameter: 7/8 Location: Bldg D - Hole Depth: - Bldg B - (Be to Bf, B4 to B5) + bIgd C (Ga to Go, C4 to Hole Depth: 41/4 Hole Diameter: 718 Location: C5) Threaded Rod El Reber Z Holes properly cleaned prior to epoxy installation Z Anchors installed in accordance with manufacturers instructions and corresponding evaluation report (ER-§2791 Comments: Bldg D was inspected per detail 4 on S3.1. Bldg B and C were inseected per detail 4 on S3.2. REPORTED BY: R. Bichel, WABO Inspector rc. REVIEWEDBY: Steve Barrie, Technical Director DISTRIBUTION: original: choun@edmwds.wednet.edu .. mmatt@ggarchitects,com cc: ca1v1n(@ggarchfteds.corn Cc:g0n1a(c)VCrnai1s.WM,— cc:bryanz(cDcp1jnc.com— M. 171OMidwayCourt - Centralia, WA 98531 - Phone(360)330-7926 -Fax(360)330-7946 Website Address: www.rntc-inc.net R- 11103 z M M C ma 0 0 C M M z z 0 .n —4 X him 0 o Fn C 0) M 0 z z 0 rn lei Materials Testing & Consulting, Inc. Geotechnical Engineering Special Inspection Materials Testing ZS Report #F 116930 FIELDREPORT Materials Testing & Consulting, Inc. FILE NO.: 06BI52-EDE 777 Chrysler Drive I DATE: July 26,2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Edmonds Elementary School Fax: (360) 755-1980 ADDRESS: 1215 Olympic Ave CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 204020 68 Ave. West CONTRACTOR: Artus Lynnwood, WA 98036-7400 PERMIT NO.: 2006-0460 (Edmonds) Time: Temp: MTC was on site as requested to inspect the epoxing of anchors. and perform the pull tests on four sacrificial anchors. The four sacrificial anchors were on bldg C at the roof area 2 feet below the diaphrarn sheathing. Two anchors were perpendicular to the joist line and two anchors were parallel. These anchors were tested at 850 pounds for 5 min. All four anchors were able to hold 850 pounds for 5 min. Please refer to report # E 1500 dated 7/26/06 for epoxy inspection daia. REPORTED BY: R. Bichel, WABO Inspector REVIEWEDBY: Steve Barrie, Technical Director DISTRIBUTION: original: chounpedmonds.wednetedu cc: matt@ggarchitects.com cc: calvin(a)ggarchitects,oarn CC:gonIa@VCmal1s.com_ cc:bryanz@cpiinc.com cc: 171OMidwayCourt - Centralia, WA 98531 - Phone (360) 330-7926 - Fax(360)330-7946 1208 Bay Street, Ste. 100 - Bellingham, WA 98225 - Phone (360) 647-6061 - Fax (360) 647-8111 Wcbsite Address; www.mtc-inc.net e-.— M.T.C. Materials Testing & Consulting, Inc. Report #E 1500 EPDXY INSPECTION REPORT Materials Testing & consulting, Inc. FILE NO.: 06BI52-EDE 777 Chrysler Drive DATE: Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Edmonds Elementary School Fax: (360) 755-1980 ADDRESS: 1215 Olympic Ave_ CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter Lundeen ATTN: Nick Chou ARCHITECT: GGA CONTRACTOR: Artus ADDRESS: 204020 68th Ave. West Lynnwood, WA 98036-7 . 400 PERMIT NO.: 2006-0460 (Edmonds) Reason for Epoxy inspection: Shown on plans or specifications El Intentionally omitted during original placement n Other: Reinspection Needs Engineer's review and acceptance Product Name: Simpson Set 22 Approved by Engineer Batch #: 20449211 Manufacture Date:_ Expiration Date or Shelf Life: 2/08 Batch #: 153162JJ Manufacture Date: Expiration Date or Shelf Life: 5/08 Location: Bid B B4 & B5 a to Bb Beg B4 to B5 Hole Depth: 5"-6" Hole Diameter: 7/8 Bldg C (Ca.3 t� C3, C4 to C n, a chors. Bldg D Location: (D I, D8, D9 - Da to De). Hole Depth: 5"- 6" Hole Diameter: 7/8 Threaded Rod El Reber Holes properly cleaned prior to epoxy installation Anchors installed in accordance with manufacturers instructions and corresponding evaluation report (ER-§2791 Comments: The embedments were 5 inches for 6 inches walls and 61'for 8 inch walls. The details per inspection were 8, 12, & 16 on S3.4 for bidgs B & C. ..Inspected the roof of bldq D per detail 3 & 8 on S3.1. REPORTED BY: R. Bichel, WABO Inspector rc REVIEWED BY: -Steve Barrie, Technical Director DISTRIBUTION: original: chournmedmonds.wednet.edu.— cc: mattOggarchitects.corn cc: calvin@ggarChitects.com cc: gonlaPvcmalls.corn cc: bryanz0cpIInc.conn cc: 171OMidwayCourt . Centralia, WA98531 . Phone (360) 330-7926 Pax(360)330-7946 Website Address: wwNv.nntc-inc.nc[ R�, 11.3 M orn C rn 0 0 C 3: M rn C 2 0 -n m M 0 0 0 Fn A C (1) r 0) M 0 z ca z 0 re M.T.C. Materials Testing & Consulting, Inc. Report.#E 1499 EPDXY INSPECTION REPORT Materials Testing & Consulting, Inc. FILE NO.: 06B1 52-EDE 777 Chrysler Drive DATE: July 25,2006 . .......... Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Edmonds Elementary School Fax: (360) 755-1980 ADDRESS: 1215 Olympic Ave CITYi Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter Lundeen ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 204020 68th Ave. West CONTRACTOR: Artus Lynnwood, WA 98036-7400 PERMIT NO.: 2006-0460 (Edmonds) 2 Reason for Epoxy Inspection: Z Shown on plans or specifications El Intentionally omitted during original placement Other: M Reinspection El Needs Engineer's review and acceptance Product Name: Simpson Set 22 Approved by Engineer Batch #: 309520JJ Manufacture Date: Expiration Date or Shelf Life: 6/08 Batch #: 20949211 Manufacture Date: Expiration Date or Shelf Life: 2/08 Location: Bldg B - (94, B5, B4.3, B4.7 - Be to Be 8) Hole Depth: 5-6" Hole Diameter: 7/&' Location: Bldg C - (C4 and C5, CB to CE) Hole Depth: 6" Hole Diameter: 718" Threaded Rod n Reber Holes property cleaned prior to epoxy installation Anchors installed in accordance with manufacturers instructions and corresponding evaluation report (ER-1772/5279 Comments: Plans call for 6 3/4 embedment. The block is only 7 5/8 inch. A verbal confermation with a confirming RFI to follow allowing the embedment to.be 6 inches was given by engineer. Depth varied due to different thickness of walls on gL B4.3 and 84.7. All work was on 2d floor plan. REPORTED BY: R. Bichel, WABO Inspector rc REVIEWED BY: Steve Barrie, Technical Director DISTRIBUTION: original: choun(Medmonds.wednetedu cc: mattRwarchitectS.Com cc: m1vinOggarchitects.c. cc: goniat@.vcmails.com cc: bryanz(ftplinc.com cc: �a 171OMidwayCourt . Centrulia,WA98531 . Phone(360)330-7926 . Pax(360)330-7946 Website Address: �"vw,mtc-inc-net 111.3 z M �n M M a 0 0 M M Z jD C 0 -n -4 X MM 061) 0 0 C co C v) Q 0 z ;o -4 z ca z 0 rn AUG 2 5 29U6 M ",E Materials Testing & Consulting, Inc. Renort #E 081606B EPDXY INSPECTION REPORT Materials Testing & Consulting, Inc. FILE NO.: 065152-EDE 777 Chrysler Drive DATE: August 16, 2006 Burlington, WA 98233 Phone; (360) 755-1990 PROJECT: Edmonds Elementary School Fax: (360) 755-1980 ADDRESS: 1215 Olympic,Ave CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter Lundeen ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 204020 68th Ave. West CONTRACTOR: Artus PERMIT NO.: 20 06-0460 jEdmon S) Cy-njjwood, WA 98036-7400 . Reason for Epoxy inspection: Shown on plans or specifications n Intentionally omitted during original placement Other: Per detail I I/S3A (S 1) El Reinspection El Needs Engineer's review and acceptance Product Name: Simpson Set 22 Approved by Engineer Ex iration Date or Shelf Life: 7/2008 Batch* 085032KK Manufacture Date:_ P Batch #: _ Manufacture Date: _ Expiration Date or Shelf Life: Location: Bid C, roof, grid Ca.2/C4.2 to C4.8 Hole Depth: 3.5" Hole Diameter: 34' Location: Bid B, roof, grid Be.8/B4.2 to B4.8 Hole Depth: 35' Hole Diameter: 3/4" Threaded Rod C3 Reber Holes properly cleaned prior to epoxy installation Anchors installed in accordance with manufacturers instructions and corresponding evaluation report (ER-5279) Comments: MTC on site for epoxy inspection. At this time 51W diameter anchor bolts for the beam -to -wall connection plates were epoxied into the existing. masonry wall. REPORTED BY: R. Jorgensen, WABO Inspector. REVIEWED BY: Steve Barrie, Technical Director DISTRIBUTION: original: choun&edmonds.wednet.edu _ cc: mattgagarchitects,com cc: calvin2ggarchitects.mm cc: gonla(aMmalls-mm cc: bryana0cp1imcorn - cv. 171OMidwayCourt Centralia, WA98531 - Phone (360) 330-7926 Fax(360)330-7946 Website Address: www.mtc-inc.net R- 103 M.T'*C. Materials Testing & Consulting, Inc. AU6 2 5 2006 1170V'c,, -,E1,1T1Th(EVT R ... rt #E 08 606A EPDXY INSPECTION REPORT Materials Testing & Consulting, Inc. FILE NO.: 06BI52-EDE 777 Chrysler Drive DATE: August 16,2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Edmonds Elementary School Fax: (360) 755-1980 ADDRESS: 1215 Olympic Ave CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter Lundeen ATTN: Nick Ch u ARCHITECT: GGA 2040 -it ADDRESS: 20 68th Ave. We CONTRACTOR: Artus PERMIT NO.: 2006-0460 jEdmonds) Lynnwood, WA 98036-7400 Reason for Epoxy Inspection: Shown on plans or specifications E] Intentionally omitted during original placement r-1 Other: Reinspection E] Needs Engineer's review and acceptance Product Name: Simpson Set 22 Approved by Engineer Batch #: 085032KK Manufacture Date: Expiration Date or Shelf Life: 7/2008 Batch #: Manufacture Date: Expiration Date or Shelf Life: Bid B, 2nd floor, gridline (BF/B7 to 132) see below for Hole Depth: 3.5" Hole Diameter: 1/2" Location: additional locations Location: Bid C, 2'� floor, 2ridline (CA/C& to C2). Hole Depth: 15" Hole Diameter: 1/2" Threaded Rod M Reber Holes properly cleaned prior to epoxy installation Anchors installed in accordance with manufacturers instructions and corresponding evaluation report (ER-5299) Comments: MTC on site for epoxy inspection. 3/8" diameter anchor bolts were epoxied into the existing slab at this tim per detail 6/S5.3.. Also placed in.bld C, grid C2/Ca to Cc, and grid C7/Cc to Cc.5 (per detail 4/S3.3). Also placed in bid B, grid B2/Bd to,Bf, and grid B7/Bc to Bc.5 (per detail 4/S3.3). REPORTED BY: R. Jorgensen, WABO Inspector rc REVIEWED BY: Steve Barrie, Technical Director DISTRIBUTION: original: chounQedmondsmednetedu cc: matt@ggarchitects.com cc: calvin@ggarchitects.com cc: gonia@vcmalls.com - cc: bryanz@cpllnc.com_ cc: . .. ... ... 1710 Midway Court Centralia, WA 98531 - Phone (360) 330-7926 Fax(360)330-7946 Wcbsitc Address: www.nite�inc.net k, 11103 Consultin Inc. Materials Testing & 9, Geotechnical Engineering - Special Inspection - Materials Testing Report #F 16937 FIELD REPORT Materials Testing & consulting, Inc. FILE NO.: 06BI52-WEE 777 Chrysler Drive DATE: Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Woodway Elementary School Fax: (360) 755-1980 ADDRESS: f5-2-1 —24—Ow St —SW CITY: Edmonds, WA CLIENT: Edmonds School District # IS ENGINEER: Coughlin Porter ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 204020 68 Ave. West CONTRACTOR: Artus Lynnwood, WA 98036-7400 PERMIT NO.: 2006-0461 (Edmonds) Time: Temp: Structural Steel Welding MTC was on site to visually inspect the welding of Structural steel to existing columns on building F. qL (Fa to Fd, Fl). MTC inspected this work per detail 15 on sheet 531. To the best of my knowledge, this work is in compliance with the approved plans and specifications. REPORTED BY: Ross Bichel REVIEWEDBY: -Niall Hackett, Technical Director DISTRIBUTION: orl mal: choun edmonds. wednet.edu cc: malt(ftgarchitects.com, cc: calvin(a)ggarchitects.com cc: gonlaQvenrails.corn cc: bryanz@cp1lnc,corn cc: umbaugh(a)cl,edm nds.wa.us 1710 Midway Court Centralia, WA98531 . Phone (360) 330-7926 - Pax(360)330-7946 1208 Buy Street, Ste. 100 Bellingham, WA 98225 - Phone (360) 647-6061 - Fax(360)647-8111 Website Address: www,iiitc-inc.net Materials Testing & Consulting, Inc. Report #E 081606 EPDXY INSPECTION REPORT Materials Testing & Consulting, Inc. FILE NO.: 06BI52-WEE 777 Chrysler Drive DATE: August 16, 2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Woodway Elementary School Fax: (360) 765-1980 ADDRESS: 9521 240th St SW CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter z ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 204020 68th Ave. West CONTRACTOR: Artus 0 71 Lynnwood, WA 98036-7400 PERMIT NO.: 2006-0461 (Edmonds) C rn Reason for Epoxy Inspection: Shown on plans or specifications 171 intentionally omitted during original placement 0 0 F-1 Other: C El Reinspection Needs Engineer's review and acceptance M rn z Product Name: Sinpson Set 22 Approved by Engineer Batch #: 085032KK Manufacture Date: Expiration Date or Shelf Life: 712008 Batch #: Manufacture Date: Expiration Date or Shelf Life:_ M rn V—) 0 0 Fn Location: Bid G gridline G, 1 /G.h to Gg, roof elevation Hole Depth: 5" Hole Diameter 3/4" a 0) C (n Location: HoleDepth:_ HoleDiameter:_ Q 0 F4 r Threaded Rod E] Rebar .4 Holes properly cleaned prior to epoxy installation z Anchors installed in accordance with manufacturers instructions and corresponding evaluation report (ER-----.� z Comments: MTC on site for e2o�y insPection. At this time 5/8" diameter all threads were epoxied into the existing masonry wal� for ledger achoring per detail 6/S3.1. MTC also verifies that screens were placed per manufacture's 0 M instructions. REPORTED BY: R. Jorgensen, WABO Inspector REVIEWED BY: Steve Barrie, Technical Director DISTRIBUTION: original: choun@edmonds.wednet4edu cc: matt(ftgarchitects.corn cc: calvinoggarchitects.corn cc: gonlaCycmalls.corn— cc: bryanz0cpHne.com cc: urnbaugh(aW,edmondsma.us 1710 Midway Court Centralia, WA 98531 . Phone (360) 3304926 Fax (360) 330-7946 Website Address: www.mtc-inc-net R- 11/0 M.T.C. RECEI,V D SEP 2 U 06 Materials Testing & Consulting, Inc. BUILDING D'P1 CITY OF ,11,1%ENT Report #E 091806 EPDXY INSPECTION REPORT Materials Testing & Consulting, Inc. FILE NO.: 06BI52-EDE -- 777 Chrysler Drive DATE: September 18, 2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: —Edmo.nds Elementary School Fax: (360) 755-1980 ADDRESS: 1215 Olympic Ave.._ CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter Lundeen ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 204020 68th Ave. West CONTRACTOR: Artus Lynnwood, WA 98036-7400 PERMIT NO.: 2006-0460 (Edmonds) Reason for Epoxy Inspection: Z Shown on plans or specifications El Intentionally omitted during original placement 0 Other: E] ReInspection Needs Engineer's review and acceptance Product Name: Simpson Set 22 Approved by Engineer Batch #: 091118KK Manufacture Date: Expiration Date or Shelf Life: 7/08 Batch Manufacture Date: Expiration Date or Shelf Life:_ 41/2,1 Location: Bldg C - (CD to CF, C3 to Glow 2 "d floor Hole Depth: 3/4, 3 1/2 Hole Diameter: 3/4, 5/8 Location: Bldg D - (DB to DD, D1) Hole Depth: 5 Hole Diameter: 3/4 Z Threaded Rod M Reber Z Holes properly cleaned prior to epoxy installation Z Anchors installed in accordance with manufacturers instructions and corresponding evaluation report (ER-5279) Comments: Bldg C was inspected per details 7, 8, 10, 11 & 12 on sheet S3.3. Bldg D was inspected per detail 15 on REPORTED BY: R. 131chel, WABO Inspector rc REVIEWED BY: Steve Barrie, Technical Director DISTRIBUTION: original: chounCedmondsmedrettedu cc: mattaggarchitects.conn cc: calvin@ggarchitects.com cc: gon1aQvcnnai1s.conn cc: bryanZQ2pIlnc.conn cc: 171OMidwayCourt - Centralia, WA98531 - Phone (360) 330-7926 Fax(360)330-7946 Websitc Address: www.mtc-inc.net R- IM z a In C 0 0 C M M z z 0 -n n --i X m In C-0 0 0 C: M 0 Z z -4 X 55 z 0 m <1 REcEIVED M.T.C. SEP 2 8 2006 Materials Testing & Consulting, Inc. BUILDING DEPARTMENT ClN OF EDMOND$ Report #E; 091606 EPDXY INSPECTION REPORT J Materials Testing & Consulting, Inc. FILE NO.: 06BI52-EDE 777 Chrysler Drive DATE: September 16, 2006 Burlington, INA 98233 Phone: (360) 756-1990 PROJECT: Edmonds Elementary School Fax: (360) 755-1980 ADDRESS: 1215 Olympic Ave CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter Lundeen ATTN: Nick Chou ARCHITECT: GGA z ADDRESS: 204020 68th Ave. West CONTRACTOR! Artus Lynnwood, WA 98036-7400 PERMIT NO.: 2006-0461 (Edmonds) Reason for Epoxy Inspection: Shown on plans or specifications F� intentionally omitted during original placement M C M 0 Other: 0 C Reinspection E3 Needs Engineer's review and acceptance C = M Im z 10 C Product Name: Set 22 Approved by Engineer Expiration Date or Shelf Life: 6/0 Batch #: 307518JJ Manufacture Date: 8 0 *n -n Batch #: Manufacture Date: Expiration Date or Shelf Life:_ Im m Bid B & C, anchoring steel beams to existing walls, 1 a V; Location: Hole Depth: 1W Hole Diameter: 7/8" floor 0 0 Bid B & , anchoring steel beams to existing walls, I C co (n Location: floor Hole Depth: 4" Hole Diameter: I/Zt 0 Threaded Rod El Rebar ;D Holes properly cleaned prior to epoxy installation Anchors installed in accordance with manufacturers instructions and corresponding evaluation report (ER-j!-72-1 z Comments: Observed 101 5/8" threaded rod placed in a 7/8"xl 0" hole that was blown out and brushed out twice, 137 z 3/8" threaded rod was placed in a 1/2"x4" hole that was blown and brushed out twice. To the best of my knowledge the 0 above work was per project plans and specs. TR REPORTED BY: T. Nelson, WABO Inspector to REVIEWED BY: Steve Barrie, Technical Director DISTRIBUTION: odginal:choun0edmonds,wednet.edu— cc: matt(q),ggarchitects.cont cv, �[AnQggarchttectsxorn cc: gonia@vcmalls.com cc: bryarez(ftplinc.corn cc: 171OMidwayCourt Centralia, WA98531 Phone (360) 330-7926 Fax(360)330-7946 Wcbsite Address: www.mtc-ine.net Materials Testing & Consulting, Inc. RECEIVED Geoteclinical Engineering - Special Inspection - Materials Testing OCT 0 t; 2o06 BUILDIN DEPA NT n_.CIP R DINME q Materials Testing & Consulting, Inc. FILE NO.: 06BI52-EDE 777 Chrysler Drive DATE: October 3, 2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Edmonds Elementary School Fax: (360) 755-1980 ADDRESS: 1215 Olympic Ave CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 204020 68-Ave. West CONTRACTOR: Artus Lynnwood, WA 98036-7400 PERMIT NO.: 2006-0460 (Edmonds) Time: Ternp: MTC was on -site as reguested to reinspect the 5 welded areas that were rejected on 9/29/06. IVITC visually reinspected the welds. To the best of my knowledge, the welding of structural steel is in -compliance with AWS W.I. The engineer's review is required for the following issues. 1) No fabrication shop inspection was completed. 2) The issue of a lap and fillet welds verses the plans calling for a butt weld (Item #27 on engineers site visit report from 9/26/06). 3) Approval of the changes to avoid pipe made to the 3x nailer and angle per detail 11 on S3.2 (Item 2.2 on 9/26/06 engineers report). REPORTED BY: R. Bichel, WABO Inspector se REVIEWED BY: Steve Barrie, Technical Director DISTRIBUTION: original: chounpedmonds,wednet.edu cc: matt(ftliarchitects.com cc: calviniiaggarchitects-corn cc: gonla(5)vcmaIls.Com cc: bryanzAcp1me.corn cc: Corporate Office - 777 Chrysler Drive - Burlington, WA 98233 . Phone (360) 755-1990 - Fax (360) 755-1980 171OMidwayCourt - Centralia, WA 98531 * Phone (360) 330-7926 * Fax(360)330-7946 2126 East Bakerview Road, Suite 11101 * Bellingham, WA 9821-6 - Phone (360) 647-6061 - Fax(360)647-8111 Website Address: w—v,mtc-inc.nct o7ft z 9 , i 0 M 3: M C 0 M 0 0 C M M z C > 0 -4 M in 0, 0 C C fj) M 0 M -4 z z 0 M QLgIN Materials Testing & Consulting, Inc" RECENED Geotechnical Engineering - Special Inspection - Materials Testing OCT 0 9'2006 BUILDING DEPARTMENT OTY ng _ihnx— Z2� R....fiV 17,,114 Materials Testing & Consulting, Inc. FILE NO.: 06BI52-EDE 777 Chrysler Drive DATE: 9-29-06 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Edmonds Elementary School Fax: (360) 755-1980 ADDRESS: 1215 Olympic Ave CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter ATTN: Nick Chou ARCHITECT: GGA — ADDRESS: 204020 68 Ave. West CONTRACTOR: Arius —Gyrinwo,cl, WA 980_36-7400 PERMIT NO.: 2006-0460 (Edmonds) Time: Temp: MTC was on -site as requested for final inspection. MTC did not receive notification of structural steel being welded at the fabrication shop. MTC was at the fabrication shop for Woodway Elementary and verified welder's certification, procedures, and filler metal being used. MTC visually inspected the welds on -site today. Some of the welds were completed on -site. MTC visually observed rejectable defects on some of the on -site welds per AWS D1. 1. These welds will need to be repaired and reinspected. The grid line locations of the [e jectable welds are Bldg B (BB, 85), (13F, B2) on S2.2a and (BF,B2) on S2.3a, Bldg C, (CE, C4) and (CE, C5). MTC also was able to verify the following issues on the engineers site visit #2. Repot dated 9/26/06. Item 2.1 was completed, Item 2.4 was completed per the recommendation on the report. Item 2.5 was completed. Item 2.6 was completed, ltem..#2.7 was inspected. Due to the plans calling out a butt weld connection, the lap and fillet weld connection will need to be rewiewed by the engineer. MTC verified everything that was possible on the list. The contractor needs to supply the sketches for item 2.2 REPORTED BY: R.Bichel, WABO inspector Mt REVIEWED BY: Steve Barrie, Technic I Director DISTRIBUTION: original: chounOedmonds.wednet.edu cc: mathiblIgarchitects.com cc: calvin@ggarchltects.com cc: gonlaQvcmalls.com cc: bryanzaeplinc.aom.— cc: 'Ah" CorporateOffice-777 Chrysler Drive - Burlingt.n,WA98233 - Phone (360) 755-1990 - Fax(360)755-1980 171OMidwayCourt . Ccntralia,WA98531 - Plionc(360)330-7926 - Fax(360)330-7946 2126 East Bakerview Road, Suite 001 - Bellingham, WA98226 - Phone (360) 647-6061 - Fax(360)647-8111 Website Address: ww-mac-inc.nel Materials Testing & Consulting, Inc. Gcotechnical Engineering - Special Inspection - Materials Testing ocr Report #F 1 "41, FIELD REPORT Materials Testing & Consulting, Inc. FILE NO.: 06BI 52-EDE 777 Chrysler Drive DATE: September 28, 2006 ............ . . . . . . . . . Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Edmonds Elementary School Fax: (360) 755-1980 ADDRESS: 1215 Olympic Ave. CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 204020 68 Ave. West CONTRACTOR: Artus Lynnwood, WA 98036-740D PERMIT NO.: 2006 Time: Temp: MTC was on site for final inspection. The contractor and approved plans were not on site. MTC will need to be rescheduled for a time that the plans can be on site. REPORTED BY: R.Bichel, WABO Inspector Mt REVIEWED BY: Steve Barrie, Technical Director DISTRIBUTION: original: choun@edmonds.wednet.edu cv. matt(ftoarchitects.conn cc: calvin2iiiiarchlitects.conin cc: gonfanvcmalls.com cc: bryanz@cplinc.com cc: Corporate Office— 777 Chrysler Drive * Burlington, WA 98233 - Plione(360)755-1990 - Fax(360)755.1980 171OMidwayCourt - Centralia, WA 98531 - Phone (360) 330-7926 - Fax(360)330-7946 2126 East Bakerview Road, Suite N101 e Bellinghain,WA98226 - Phone (360) 647-6061 - F.x(360)647-8111 Welisite Address: w—nate-inc.ne R- 07ft 1 1 : C Materials Testing & Consulting, Inc. Geotechnical Engineering - Special Inspection - Materials Testing OCT 1 ? 2006 it 8U 0 a 'PARrt CITY/fyop 01 , Report #F 1794t)MQ, FIELD REPORT Materials Testing & Consulting, Inc. FILE NO.: 06B1 52-EDE 777 Chrysler Drive DATE: October 3, 2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Edmonds Elementary School, Fax: (360) 755-1980 ADDRESS: 1215 Olympic Ave CITY: Edmonds, WA z CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter ATTN: Nic ARCHITECT: GGA kCh5u 0 ADDRESS: 2040-2-0 61"' Ave. CONTRACTOR: Artus Lynnwood, WA 98036-7400 PERMIT NO.: 2006-0460 (Edmonds) M C Time: Ternp: M 0 0 MTC was on -site as reguest d to reinspect the 5 welded areas that were rejected on 9/29/06. MTC C -4 C visually reinspected the welds. To the best of my knowledge, the welding of structural steel is 7: in in z in -compliance with AWS D1. 1. The engineers review is required for the following issues. C z 1) No fabrication shop inspection was completed. > U) 2) The issue of a lap and fillet welds verses the_plans calling for a butt weld (item #2.7 on engineers 0 _n site visit report from 9/26/06). rt� 3) Approval of the changes to avoid pipe made to the 3x nailer and angle per detail 11 on S3.2 in (item 2.2 on 9/26/06 engineer's report). 0 0 C ca C ca To > z X z M REPORTED BY: R. Bichel, WABO Inspector rc/se REVIEWED BY: Steve Barrie, Technical Director DISTRIBUTION: original: choun(a)edmondsowednetedu cc: matt0agarchitects.com calvin(ftgarchitects-corn cc: onia vernalls.com cc: bryanzOcpllnc.com cc: Office- 777 Chrysler Drive - Burlington, WA 98233 - Phone (360) 755-1990 - Fox(360)755-1980 Corporate 171OMidwayC.urt - Centralia, WA98531 - Phone (360) 330-7926 - Fax(360)330-7946 2126 East Bakerview Road, Suite #101 o Bellingham, WA 98226 * Phone (360) 647-6061 Fax(360)647-8111 Websitc, Address: www.nuc-inexet R­ 07ft Materials Testing & Consulting, IncROCEV Geotechnical Engineering - Special Inspection - Materials Testing OCT 17 2006 BUILDING DEPARIMEW CITY OF FDIAONDS Report #F 17984 FIELD REPORT Materials Testing & Consulting, Inc. 777 Chrysler Drive Burlington, WA 98233 Phone: (360) 755-1990 Fax: (360) 755-1980 CLIENT: Edmonds School District # 15 ATTN: Nick Chou ADDRESS: 204020 68 Ave. West Lynnwood, WA 98036-7400 FILE NO.: 06BI52-EDE DATE: 9-29-06 PROJECT: Edmonds Elementary School ADDRESS: 1215 Olympic Ave CITY: Edmonds, WA ENGINEER: Coughlin Porter ARCHITECT: GGA CONTRACTOR: Artus PERMIT NO.: 2006-0460 (Edmonds) Ternp: MTC was on -site as requested for final inspection. MTC did not receive notification of structural steel being welded at the fabrication shop. MTC was at the fabrication shop for Woodway Elementary and verified welders certification, procedures, and filler metal being used. MTC visually inspected the welds on -site today. Some of the welds were completed on -site. MTC visually observed -site welds per AWS DI I. These welds will need to be repaired rejectablejefects on some of the on and reinspected, The grid line locations of the rejectable welds are Bldg B (BB, B5), kBF, B2) on S2.2a and (BF,B2) on S2.3a, Bldg C, (CE, C4) and (CE, C5). MTC also was able to verify the following issues on the engineers site visit #2. Report dated 9/26/06, Item 2.1 was completed. Item 2.4 was completed per the recommendation on the report. Item 2.5 was completed. Item 2.6 was completed, Item #2.7 was inspected. Due to the plans calling out a butt weld connection, the lap and fillet weld connection will need to be reviewed by the engineer. MTC verified everything that was possible on the list. The contractor needs to supply the sketches -For item 2.2 REPORTED BY: R.Bichel, WABO inspector Mt REVIEWEDBY: Steve Barrie, Technical Director DISTRIBUTION: original: choun2edmords.wednetedu cc: matto_ggarchitects.com cc: cai%(jn@g2architects.com cc: onto vcmalls.com cc: bryanzidaxplinc.corn cc: ��k .0 . . ..... Corporate Office - 777 Chrysler Drive * Burlington, WA 98233 Phone (360) 755-1990 * Fax(360)755-1980 171OMidwayCourt - Centralia, WA 98531 . Phone (360) 330-7926 - Fax(360)330-7946 2126 East Bakerview Road, Suite #101 - Bellingham, WA98226 - Phone (360) 647-6061 - Fax(360)647-8111 Website Address: mn-rac-inc.ne R­ Wi0s z 3: C m M 0 80 —4 C X M M fill z ,0-4 z 0 -n n M in a _U) I I 0 0 C in M 0 X z -4 X ra z in 9 9 COUGHLIN PORTER LUNDEEN April 23,2007 C]PL job S05-1509-01 To: Nick Chou RE: Edmonds Elententanj Voluntary Scis"fic Upgrade Structural Observation Completion z 0 Dear Nick: M The purpose of this letter is to acknowledge that Structural Observation in accordance with IBC Section 1709 has been completed for the Edmonds Elementary Voluntary Seismic Upgrade t ti tr in project. Any observed deficiencies were brought to the at en on of the con actor and noted 0 M site visit reports and/or project minutes of meeting. 0 C The noted deficiencies were either visually observed as being completed during a subsequent site knowledge, the M X M K visit, or verified by the contractor as being completed. To the best of our project rn z has been constructed in accordance with the Contract Documents. C z RFCr--IVJED > APR 2 6 2007 0 Sincerely, DEVELOPMENT'SERVICES CTR, CITY OF EDMONDS In M Brian MacRae COUGHLIN PORTER LUNDEEN, INC. 0 0 co - C (imp) M 0 Z z 21.2 NA W z ES 7/25/ M 413 PINE STREET SUITE100- SEAT-rLE.WA 98101 P.,2061343-0460 F:2061343-5691