Loading...
20060461.pdfLCL ILI q PERMIT EXPMEL4-a�, PERM T CITY OF EDMONDS NUMBIER CONSTRUCTION PERMIT APPLICATION j.D IOITEIAIT ADDRESS q_5,;1/ - ,� E - ' 11. NO FLAT IIA.E SUBDIVISION Do I LET LID MAILINGADDRESS LIOFCES All k) PUBLIC RJGf1T OF WAY PER OFFICIAL STREET MAP P 0 ZIP TILE11111E E03 E ISTING PROPOSED 0 REQUIRED DEOICA71ON FT 0 N015 METER SIZE LINE SIZE PAV REQUIRED YES 0 NO 0 I ADDRESS REMARKS OWNERGONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE CITY NAME ENGINEERING REVIEWED By DATE RECYCLE REVIEWED By DATE IT CITY ZVP� TELEPHONE _RLBUC WORKS REVIEWED BY DATE EXPIRATIO FIRE REVIEWED By DATE T _SE�A z VARIANCE OR C1 5101 T 0 PROPERTY TAX ACCOUNT P;� CIEPPI D()() I IC01FIETED I ZONE SIGN AREA HEIGHT NEW RESIDENTIAL PL..B'.GI.ECH 13 WAIVET-' ALL.- I PROPMED ALLOWS. L C MPLIANCEOR ADDITION k�2 Q, CHANGE .1 USE __2 STUDY I LEFT COVERAGE REQUI D SETBACKS IFT) BED SETBA KS FT) 0 ITI C ALLOWED FRONT SIDE FEAR M 0 REMODEL MULTIFAMILY SIGN 1PROPOSED I 0 -4 0 0 1ENQE REPAIR GRADING CYDS X FT,) PARKING LOTARIA PLANNIN REWEVVEDBY DATE C DECO PROVIDED I DEMOLISH F-1 TANK OTHER i GARA E METAININ WALL TE S,7,,KLES G CARPORT ROCKER)o El FIREA1_ARM REMARKS z > (TYPE OF USE, BUS -0 lZ NUMBER or OF G TYPE OF CONSTRUCTION 3 STORIES FCCUPANT Up ��E DOC WORK TO BE DONE 3: DESCRIBE SPECIAL INSPECTION CONSULTANT OCCUPANT M n REQUInED 0 YES LOAD vnwAn" �Jo REMARKS 0 C: 15kA)S'E_ 9 GEOIECI REPORT M 0 Z L BY S VALP,Af!O $ Desc4tion' FEE Description FEE z _HSAT i Plan Check 149 Stale Surcharge X SOURCE LOT SLOPE1. VESTED DATE I I CO Building Permit City Surcharge '�$ 1 z PLAN CHECK !:y, Plumbing Ba.e Fee 0 0 THt PERMITAUTHORIZES ONLYTHE WORK NOTE THIS PERMIT COVERS WORK To ITI BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC Mechanical 2 DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: SEE ECDC 19.00.005(A)(S) Grading Fee PERMIT L MIT.'SEE ECDC 19.00.00G(A)(6) Engr. Review Recording SEE SACK OF PINK PERMIT FOR MORE INFORMATION Eng� Inspection Plan Chk. DepowV- I [CANT, ON BEHALF Or 81S OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS __ Fire Review Receipt 9 IN NTEREST. AGREES TO INDEMNIFY, SPEND AND HOLD HARMLESS THE CITY OF 2 EDMONDS, WASHINGTON. ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND A A L TLY 08 INDIRECTLY L CLAIMS F09 DAMAGES OF WHATEVER NATURE, ARISING GREG Fire InSpection Total Amt. Due FROM THE ISSUANCE F THIS PERMIT, ISSUANCE OF THIS PERMIT $HALL NOT I DEEMED TO MODIFY, WAIVE 09 REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION La,dsc8p, IRS,. Receipt 9 I .-EBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE IN 0 MATION fIRLICATION APPROVAL GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED'AGENT OF THE OWNE . I AGREE TO COMPLY WITH CIT AND STATE LAWS REGULATING CONSTNUC- CALL AN, ", K" -1-1- IpIty-F.01.11plo Ild FOR INSPECTION F"­"""`90%' TION: AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYE. VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO �P.C. P'...,t WORKMEN'S COMPENSATIO RANCE AND ACW 18:27. (425) 'q0,FFAK1_fAvSf4 ATLRE DATE SJ!7qWNER OR 0-1 SIGNED C_ 414 1,9& qj741f"1' 771-0220 1 OAfr RE.L E B EXT. 1333 TT N ION A T IT'S UELA.FUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- ORIGINAL � FILE - YELLOW - INSPECTOR FICATE OF OCCUPANCY HAS BEEN GRANTED. USC109 I IBC110 / IRC110. PINK -OWNER - GOLD - ASSESSOR 6105 PRESS HARD - YOU ARE MAKING 4 COPIES Materials Testing & Consulting, Inc. Geotechnical Engineering - Special Inspection Materials Testing LAM Q-- �v t 6934 FIELD REPORT Materials Testing & Consulting, Inc. FILE NO.: 0613152-WEE 777 Chrysler Drive DATE: July19,2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: )Yooqwa Elementary School Fax: (360) 755-1980 ADDRESS: 7521 2404 st SW CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 204020 68 Ave.West CONTRACTOR: Artus Lynnwood, WA 98036-7400 PERMIT NO.: 2006-0461 (Edmonds) Time: Temp: MTC was on site as requested at Corbell Welding in Alger, Wa to Visually inspect the fabrication shop welds and review welder information. The welder's WABO Certification we ding procedures, and filler metal were verified. The plans called for 3/16 inch fillet welds. To the best of my.. knowledge, this work is in compliance with the approved plans and specifications. The work inspected was 4 clips per detail 15 on S3.1, 1 column per detail 16 on S3.1. Jul- 4u U U�' REPORTED BY: R, Bichel, WABO Inspector rc REVIEWED BY: Steve Barrie, Technical Director DISTRIBUTION: original: choun2edrnondsmednet.edu cc: matt@ggarchitects.com cc: calvin(a)ggarchlteets.corn cc: croniaQvcmalls.corn cc: b!yanz@cPljnc.corn.— cc: urnbaughoci.edmonds,wa.us 171OMidwayCourt Centralia, WA 98531 - Phone(360)330-7926 - Fux(360)330-7946 1208 Bay Street, Ste. 100 Bellinghani,WA98225 - Plionc(360)647-6061 . Fax(360)647-8111 Website Address: ww-nnc-imnet Materials Testing & Consultin :n"i"...-, Geotechnical Engineering Special Inspection Materials TesfiQ LW OP 6425 FIELD REPORT Materials Testing & Consulting, Inc. FILE NO.: 06BI52-WEE 777 Chrysler Drive DATE: July 17, 2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: �Zqw tary School Fax: (360) 755-1980 ADDRESS: 7121 240q=' CITY: Edmon s. WA CLIENT: Edmonds School District# 15 ENGINEER: Coughlin Porter z ATTN: Nick Chou ARCHITECT: GGA 9 ADDRESS: 204020 68 Ave. West CONTRACTOR: Artus 0 Lynnwood, WA 98036-7400 PERMIT NO.: 2006-046 1 (Edmonds) am Time: Temp: mo 0 Needs Engineer's Review 0 a MTC was on -site as requested to perform pull tests on 4 sacrificial all thread anchors. These 3: M anchors are located in Bldg C. 2 bo Its are epoxied into the CMU walls that are parallell to the joists M z and 2 are perpendicular to the joists. The pressure applied was 850 pounds. This pressure was held C for 5 minutes Rer the engineer's request. These 4 pull tested anchors were able to withstand the 850 lbs at 5 minutes. 0 1 -n The epmyinq of dowels was ins pected today. Please refer to report #E-1008 dated 7/17/06 for epoxy data. The steel at IjL (Ga to Gb, G.1) and �Gg to Gh, GA) did not have the anchors epoxied, III m a This will be completed after the aesbestos abutment. 0 0 m C 9 co m 0 Z 71 M --i 3: z z m REPORTED BY: R. Bichel, WABO Ins actor se REVIEWED BY: Steve Barrie, Technical Director DISTRIBUTION: original: choun@edmonds,wednet.edu cc: matt@ggarchitects.com cc: calviraiDg9architects.corn cc: goniaRycrnalls.com.. cc: bryanz(akplinc.com cc: urnbaugh@Cl.ednnonds.wa.us 171OMidwayCourt Centralia, WA 98531 - Phone(360)330-7926 - Fax(360)33()-7946 1208 Buy Street, Ste. 100 Bellingham, WA 98225 * Plione (300) 647-6061 - Fax (360) 647-8111 Website, Address: www.nitc4c.nct M.T.C. Materials Testing & Consulting, Inc. Report #Ej 132 PDXY INSPECTION REPORT J Materials Testing & Consulting, Inc. FILE NO.: 06B152-WEE 2006 777 Chrysler Drive Burlington, WA 98233 Phone: (360) 755-1990 DATE: PROJECT: Z yFlern ry School V02 ' ant 7521 240th 5t 5VV Fax: (360) 755-1980 ADDRESS: CITY: Edmonds, WA CLIENT: Edmonds School District# 15 ENGINEER: Cough n Porter z ATTN: Nick Chou ARCHITECT: CONTRACTOR: GGA Artus ADDRESS: 204020 68th Ave. West PERMIT NO.: 2006-0461 (Edmonds Lvnnwood, WA 9BU36-7400 4 5i 65 -4 1­1 Intentionally omitted during original placement In C a Reason for Epoxy Inspection: 0 Shown on plans or speciticaUons C] Other: E] Reinspection Needs Engineer's review and acceptance Product Name: Sim2son..Set 22 Approved by Engineer Batch* 19347211 Manufacture Date: Expiration Date or Shelf Life: 2/08 Batch #: _Manufacture Date:_ Expiration Date or Shelf Life: Location: Gym bldg G Hole Depth: 6" Hole Diameter: 7/8 see t Location: Bldg A-G slesmic anchors HoleDepth: rem$rks�—.,4Hoe lameer: Threaded Rod [] Reber Holes properly cleaned prior to epoxy installation corresponding ev'ai6ation report (ER-fj �79 Anchors installed in accordance with manufacturers instructions and Comments: The bolts were eRoxied using screens due to the CMU walls being hollow. This work is in compliance with the approved plans and §J)ecifications. The custodian and store a rooms in the gym are excluded from todays inspection. REPORTED BY: R. Bichel, WASO Inspector rclse REVIEWEDBY: Steve Barrie, Technical Director DISTRIBUTION: original: choun(Weelmonds.wednetedu cc: rrattflg architeCts.wm cc: ealvin@ggarchitects-corn cc: gonia0vemalls-com— cc: bryw cPfinc-cOm cc, I.—W, — �� , — w., . o, .� ...'! � �, ",� ."W", I i , I - W.6.,I.,� � "—i ....... ........ z"j", "".. 2, .0 1710Midw.yCourt , Centrilia,WA98531 * Plionc(360)330-7926 a Fax(360)330-7946 Website Address: www,"Itc-ine-110 M --10 00 C X M M z C —z 0 -n -n -4 3: M M 0 C o) 90) M C-) z -4 X 1 U5 z 0 in Materials Testing & Consulting, Inc. Geotechnical Engineering - Special Inspection - Materials Testing Report#F 15111 FIELD REPORT Materials Testing & Consulting, Inc. FILE NO.: 06BI52-WEE 777 Chrysler Drive DATE: August 9, 2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Woodwg Elementary School Fax: (360) 755-1980 ADDRESS: 7521240 St Sw CITY: CLIENT: Edmonds School District # 15 ENGINEER: ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 020 68 Ave. West CONTRACTOR: Artus -ly—nnwood, WA 98036-7400 PERMIT NO.: 2006-0461 (Edmonds) Temp: Time: MTG was on site as requested to inspect the holes that were core drilled using a 7/8 inch diameter core bit. These holes are per the modified detail 4 on S3.1 RFl # 7. The all thread used is 7/8 inch. The plates on the exterior face need to be installed. IVITC will inspect the completed work upon its completion. All the holes were inspected on bldgs A through F. To the best of my knowledge, these holes are in compliance with the approved RFI # 7. REPORTED BY: R. Bichel, WABO Inspector REVIEWED BY: Steve Barrie, Technical Director DISTRIBUTION: original: choun2edmonds.wednet.edu cc: matt@ggarchitects.com cc: calvin@ggarchitects.com "cc: Pon1a(cbV=a1ls.wrn — cc: bryarzOeplinc.corn cc: undhaughPd.edmondsma.us 17 10 Midway Court Centralia, WA 98531 - Phone (360) 330-7926 - Fax (360) 330-7946 1208 Bay Street, Ste. 100 Bellinghann, WA 98225 - Phone (360) 647-6061 - Fax (360) 647-8111 Website, Address: www.nitc-inc.not z 0 0 In m C m -10 0 C: -4 X M C 0 -n n m M 0 0 C 9 o) M 0 Z .4 X -4 z —4 z 0 m Materials Testing & Consulting, Inc. Geotechnical Engineering - Special Inspection Materials Testing 1 ­­ � , -1 �FIELDIREPORT Report #F 16917 _71 Materials Testing & Consulting, Inc. FILE NO.: 06BI52-WEE 777 Chrysler Drive DATE: August4,2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Aoo I Elementary School Fax: (360) 755-1980 ADDRESS: 7121 V" St Sw CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter ATTN: Nick Chou - ARCHITECT: GGA ADDRESS: 204020 68'" Ave. West CONTRACTOR: Artus Lynnwood, WA 98036m7400 PERMIT NO.: 2006-0461 (Edmonds) Time: Temp: MTC was requested by the engineer of record to report in more detail the epoxying of the LTT1 9 Simpson Hardware for buildings A through F at Woodway Elementa!y. MTC visually inspected this epoxy on 7/13/06. MTC inspected this work per detail 8 on S3.1. To the best of my knowledge, this work was completed in compliance with the approved plans, specifications, and ICC report #5279. MTC observed the masonnt bit to the 7/8 inch diameter. The screens used were 3 1/2 inch optimesh by Simpson Hardware. The epoxy used was Simpson Set 22. Please refer to report dated 7/13/06 for the batch numbers and expiration dates of the epoxy. AU(, wc_'�_ �F T REPORTED BY: R. Bichel, WABO In pector se.. REVIEWED BY: Steve Barrie, Technclal Director DISTRIBUTION: original: choun0ealmords6wednetzedu cc: matt@ggarchitects.com cc: calvin(d.)ggarchitectsm cc: qonia(cDvcmaI1s,corn__ cc: bryanzQc21jnC-c0M_ cc: umbaugho-ci.edmords.wa.us 171OMidwayCourt Centralia, WA 98531 - Phone (360) 330-7926 - Fax(360)330-7946 1208 Bay Street, Ste. 100 Bellinghann, WA 98225 - Phone (360) 647-6061 - Fax (360) 647-8111 Website Address: w%m-nAc-ine-net z 9 0 In C m M 0 : . 0 80 C m M z 0 0 mm 0 V5 0 0 C: Kca M 0 Z 7-1 z z 0 0 m M.T.C. Materials Testing & Consulting, Inc. Report #E 080406 EPDXY INSPECTION REPORT Materials Testing & Consulting, Inc. FILE NO.: 06BI52-WEE 777 Chrysler Drive DATE: August 4, 2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Woodway Elementary School Fax: (360) 755-1980 ADDRESS: 9521 20th St SW CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 204020 68th Ave. West CONTRACTOR: Artus Lynnwood, WA 98036-7400 PERMIT NO.: 2006-0461 (Edmonds) Reason for Epoxy Inspection: Shown on plans or specifications Intentionally omitted during original placement Other: E] Reinspection El Needs Engineer's review and acceptance Product Name: Simpson Set 22 Approved by Engineer Batch #: Manufacture Date: Expiration Date or Shelf Life: Batch #: Manufacture Date: Expiration Date or Shelf Life: Bldg G, (G.h, G.2), (G.a-Gb.1), (Gh, G1.5) (Ga, G1 to 6" or 3 1/2 Location: G2) Hole Depth: screen Hole Diameter: 718 3112 Location: Bldg F, (FA to FD, FI) Hole Depth: screen Hole Diameter: 7/8 Threaded Rod El Rebar Holes properly cleaned prior to epoxy installation Anchors installed in accordance with manufacturers instructions and corresponding evaluation report (ER-§2791 Comments: Bldg G inspected.per details 6, 2, & 3 on sheet S3.1- Bldg F was inspected per detail 11 and 16 on S3.1. The steel anchors at gL GG, Gh, GI in.,bidg G have not been installed. REPORTED BY: R. Bichel, WABO Inspector r REVIEWED BY: Steve Barrie, Technical Director DISTRIBUTION: original: chounaedmonds.wednet4edu cc: matt(cilggarchhects.corn, cc: calVin(cilg9architects.conn cc: gonia(cilvcmails.corn cc: bryan&cplinc.conn cc: urnbaugh(oki.edmonds.wa.us All mdin 17 10 Midway Court - Centralia, WA 98531 - Phone (360) 330-7926 - Fax (360) 330-7946 Website Address: www-nue-inc-nct z 9 0 01 m C 0 m 0 80 C M re 10 z 0 -n m M a Y) 0 r— I 0 M C Cj) 90) M 0 Z z z 9 0 1111 Materials Testing &Xonsulting, Inc. eel V, Geotechnical Engineering - Special Inspection - Materials Testing AY6 2 5 2008 804DINO "y ONDS Report #F 16937 FIELD REPORT Materials Testing & Consulting, Inc. FILE NO.: 06B152-WEE 777 Chrysler Drive DATE: August 18, 2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Zoodwax Etem tary School ADDRESS: Fax: (360) 765-1980 7121240 St SZ CITY: Edmonds, WA CLIENT: Edmonds School District # IS ENGINEER: Coughlin Porter z 0 ATTN: Nick Chou ARCHITECT: GGA I o ADDRESS: 204020 6W" Ave. West CONTRACTOR: Artus 0 ynnwood, WA 98036-7400 PERMIT NO.: 2006-0461 (Edmonds) Fn --j 3: C: m 0 Time: Ternp: M 0 0 C Structural Steel Welding 3: M M z MTC was on site to visually inspect the welding of structural steel to existing columns.on building F. Z qL (Fa to Fd, F1 MTC inspected this work per detail 15 on sheet 531. To the best of my knowledge, P this work is in compliance with the approved plans an d specifications. 0 -n n 3: m In 0 0 M M 0 Z 7-1 z --i z m REPORTED BY: Ross Bichel REVIEWED BY: DISTRIBUTION: original: choun@edmonds.wednet;edu cc: matt*ggarchitects.com cc: calvin@ggarchitects.wm cc: onia vcmails.corn cc: bryanz(a)cplinc.com cc: umbaugh@cLedmondspwatus 171OMidwayCourt Centralia,WA985311 - Phone (360) 330-7926 - Fax(360)330-7946 1208 Bay Street, Ste. 100 Bellingham, WA 98225 - Phone (360) 647-6061 Fax(360)647-8111 Websitc Address: www.mtc-inc.net MTC Materials Testing & Consulting, Inc. Geoteclinical Engineering - Special Inspection Materials Testing 449,ge 0 P Report#FIfU �4 FIELD REPORT Materials Testing & Consulting, Inc. FILE NO.: 06BI52-EDE 777 Chrysler Drive DATE: September 9, 2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Edmonds Elementary School Fax: (360) 755-1980 ADDRESS: 1215 Olyml?�ic. Ave CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter z ATTN: Nick Chou ARCHITECT: GGA 0 ADDRESS: 204620 68 Ave. West CONTRACTOR: Artus 0 Lvnnwo 36-7400... PERMIT NO.: 2006-0460 �Edmonds) 0 C Time: Temp: in EP 0 C "&5 M MTC on site for epoxy inspection. Areas inspected.are building C roof level near C7 (Cc), (Cd)� m 10 G5 (Ce), C4 (Ce), C4 (Cd), and C2 (Ca). Building B of level near Bf (B2) and B7 (6d).. C —Z > Product used is Simpson Set 22 lot # 307518,11 ICC PR # 1772, approved by engineer. Hardware C4 used for above is (52) 518"x5 1/2" all thread rods. Hole depth is 4 1/2". 0 -n North and south end of north south walk way level 1. (72) 3/8"x 4 114 all thread rods. Hole depthJIS m M 3 1/2". 0 V; f All holes were cleaned 2rior to epoxy application. To the best of MY knowledge materials and 0 - 0 workmanship.are as per plans and specs. C: C ca in 0 Z ;o z z 0 In REPORTED BY: C. Has!y, WABO Inspector rc REVIEWED BY: Steve Barrie, Technical Director DISTRIBUTION: original: choun@edmonds.wednet.edu cc: matt@ggarchitects.com cc: calvinOggarchitects,com cc: gonla(a)vc,mails.com cc: bryanzOeplinc.com cc: A� ­­t V­j., Al ­" .......... .... Corporate Office -777 Chrysler Drive Burlington, WA 98233 - Plione(360)755-1990 - rux(360)755-1980 171OMidwayCourt * Centralia, WA98531 * Phone (360) 330-7926 * Fax(360)330-7946 2126 East Bakerview Road, Suite #101 . Bellingham, WA 98226 - Phone (360) 647-6061 Fax(360)647-8111 Website Address: iv—nitc-inc.net R.Alft M.T.C. Materials Testing & Consulting, Inc. Report #E 0907 EPDXY INSPECTION REPORT Materials Testing & Consulting, Inc. FILE NO.: 06BI62-EDE 777 Chrysler Drive DATE: September 7, 2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Edmonds Elementary School Fax: (360) 755-`1980 ADDRESS: 1215 Olympic Ave CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter Lundeen ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 204020 68th Ave. West CONTRACTOR: Artus Lvnnwo 36-7400 PERMIT NO.: 2006-0460 (Edmonds) 0 Reason for Epoxy Inspection: Shown on plans or specifications M intentionally omitted during original placement M C M 0 E] Other: 0 Reinspection Needs Engineer's review and acceptance C -49 X re rn z C — -4 Product Name: Simpson Set 22 Z Approved by Engineer 3: Batch* 081276 11 Manufacture Date: Expiration Date or Shelf Life: 1/08 0 n n �u Batch #: 085032 KK Manufacture Date: Expiration Date or Shelf Life: 7/08 3: rn m a Location: Bldg A - Perimeter @ roof level Hole Depth: 41/2 Hole Diameter: 3/4 0 0 C: M co Bldg B - (BB to BD, B5 & B4) (BD to BD.3, B2 & 67) K 0) Location: (BE.8 to BF, B4 & B5) Hole Depth: 41/2 Hole Diameter: 314 Q 0 Z r- Threaded Rod El Rebar M Holes properly cleaned prior to epoxy installation Z Anchors installed in accordance with manufacturers instructions and corresponding evaluation report (ER-§2-7-91 z Comments: Bldg C - Ca to Ca.3, C4 & C5 - hold depth 4 1/2, diameter 3/4. The work was inspected per detail 10 & 15 on z 9 sheet S3.2. 0 1 M REPORTED BY: R. Bichel, WABO.Inspector s REVIEWED BY: Steve Barrie, Technical Inspector DISTRIBUTION: oriclinal: choun2edmonds.wednet cc: matt@ggarchitects.com cc: calvin@ggarchitects.conn cc: gonla2vcmalls.corn cc: bryanz(ftplinc.corn cc: 17)OMidwayCourt - Centralia, WA 98531 Plione(360)330-7926 rax(360)330-7946 Website Address: www.nitc-inc.net R- 11103 1 Materials Testing & Consulting, Inc. MTC -t� se Geotechnical Engineering - Special Inspection - Materials Testing EM 01 Dep4qru6m� Report #F 17 301 FIELD REPORT Materials Testing & Consulting, Inc. FILE NO.: 06BI 52-EDE 777 Chrysler Drive DATE: September 10, 2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Edmonds Elementary School Fax: (360) 755-1980 ADDRESS: 1215 Olympic Ave CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter z ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 204020 68 Ave. West CONTRACTOR: —Eynnwood, Arius RI WA 98036-7400 PERMIT NC.: 2006-0460 (Edmonds) Vj m Time: Temp: M 0 Epoxy - Show Up m m On site as reguested. Contractor not ready for inspection at this time. Will contact laboratory to schedule inspection. 0 -n n re M 0 C, m C m 0 Z z z 0 m REPORTED BY: T. Nelson, Field Ins2ector se REVIEWED BY: Steve Barrie, Technical Director DISTRIBUTION: original: choungedmonds.wednet.edu cc: mattog2architects.com cc: calvin@ggarchitects.mm cc: gonia@vcmalls-com cc: bryanzoSelinc.com cc: k 11— Corporate Office —777 Chrysler Drive - Burlington, WA 98233 - Plione(360)755-1990 - Fax(360)755-1980 171OMidwayCourt - Centralia, WA 98531 - Phone (360)330-7926 - Fax(360)330-7946 2126 East Bakerview Road, Suite #101 - Bellingham, WA98226 - Plione(360)647-6061 - Fax(360)647-8111 Website Address: w— mte-inc.net R— 006 MI.T.C. Materials Testing & Consulting, Inc. RECEIVED SEP 112006 �111%M, ZTMEN1 NW EPDXY INSPECTION REPORT Materials Testing & consulting, Inc. FILE NO.: 06B1 52-EDE 777 Chrysler Drive DATE: August 29, 2006 Burlington, WA 98233 Phone: (360) 755-1990 PROJECT: Edmonds Elementary School Fax: (360) 755-1980 ADDRESS: 1215 Olympic Ave CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter Lundeen ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 204020 68th Ave. West CONTRACTOR: Artus Lynnwo 36-7400 PERMIT NO.: 2006-0460 (Edmo del Reason for Epoxy Inspection: Shown on plans or specifications 0 intentionally omitted during original placement Other: Reinspection M Needs Engineer's review and acceptance Product Name: Simpson ET 22 Z Approved by Engineer Batch* 19347211 Manufacture Date:_ Expiration Date or Shelf Life: 02/08 Batch Manufacture Date: _ Expiration Date or Shelf Life:_ Detail 9 on Location: Wood beam ledger on bldg B & C .­ ... . ........ _ Hole Depth: 4,5" - Hole Diameter: S3.2 Location: Angle ledger on B,and C Hole Depth: 4.5" Hole Diameter: 3/4" Threaded Rod n Rebar Holes properly cleaned prior to epoxy installation Anchors installed in accordance with manufacturers instructions and corresponding evaluation report (ER ------ Comments: Also observed plates,on bldg B &.0 under slab. These had been placed with 5 expansion anchors on the_ plate on bidg C and on plates on bIdS B. Each plate had 2 expansion anchors out of 4 on each 2late were verbally approved by engineer. The thread rods on bidg B & C on top could be only achieve 4-5" inbedment rather then 5" as call for on detail 6 on 3-3 due to dimension of the brick being 5!'thick. All worK inspected was performed in a workman like mannor and wasperformed in acco ance with project plans, specification and IBC. REPORTED BY: N. Hackett, WABO Inspector rc REVIEWED BY: Steve Barrie, Technical.Director DISTRIBUTION: original: choun@ednionds.wednet.edU cc: matt@9garchitectsicorn cc: calvin@9garchitects.00rn cc: gonlapvcmalls.conn cc: bryanzQ2plinc.corn . ..... cc: 171OMidwayCourt * Centralia, WA 98531 - Phone (360) 330-7926 - Fax(360)330-7946 Webske Address: ww.rinte-inc.net z 0 m 3: a M M 0 80 C: -4 m m z ,0-1 C: n M In 0 0 C: Q 0 z -4 z 9 0 M Materials Testing & Consulting, Inc. Gcotechnical Engineering - Special inspection - Materials Testing OCT I/ 2DO6 Ulm op ........ �tqr "DA401vos Report #F 17985 FIELD REPORT Materials Testing & Consulting, Inc. FILE NO.: 06B152-WEE 777 Chrysler Drive DATE: 9/29106 Burlington, WA 98233 Phone* (360) 7554 990 PROJECT: 00 wav Elementary School Fax: (360) 755-1980 ADDRESS: 7521 24011, St SW CITY: Edmonds, WA CLIENT: Edmonds School District # 15 ENGINEER: Coughlin Porter z ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 204020 68'" Ave. West CONTRACTOR: Artus PERMIT NO.: 2006-0461( Lynnwood, WA 98036-7400 Edmonds) M Time: Temp: 0 m co MID MTC was on site for a final inspection of the work completed 0 C: at Woodway Elementary. MTC verified that the bolting and epoxy anchors were tightened. This was completed on building A through G. To the best of my knowledge this work is in compliance with M Z 0.-1 the approved plans, specifications, and RFI's. C > z U) 0 -n "n m m 0 0 C In 9 co M 0 Z ;U z z m REPORTED BY: R.Bichel, WABO Special Inspector REVIEWED BY: Steve Barrie, Technical Director DISTRIBUTION: original: choun2edmonds.wednet,edu cc: matt(a).C.1parchitects.com cc: calvin2ggarchitects.com cc: gonlattgvernails.corn - cc: bryanz@cplinc.com cc: umbaugh2cl.edmondsma.us 171OMidwayCourt - Centralia, WA98531 - Phone (360) 330-7926 - Fax(360)33t)-7946 1208 Bay Street, Ste. 100 - Bellingham, WA 98225 . Phone (360) 647-6061 - Fax(360)647-8111 Website Address: www.mic-inc.net Materials Testing & Consulting, Inc. Geotechnical Engineering - Special Inspection Materials Testing EM 0c,r 10 2006 Report #F 179 S FIELD REPORT Materials Testing & Consulting, Inc. FILE NO.: 06BI52-WEE 777 Chrysler Drive DATE: 9129/06 PROJECT: Burlington, WA 98233 Phone: (360) 755-1990 - I - a4 It..-Z !a h..l Fax: (360) 755-1980 ADDRESS: 152112 CITY: Edmonds, WA CLIENT: Edmonds School District# 15 ENGINEER: Coughlin Porter z ATTN: Nick Chou ARCHITECT: GGA ADDRESS: 204020 68"'Ave. West CONTRACTOR: Artus Lynnwood, WA 98036-7400 PERMIT NO.: 2006-0461 (Edmonds) m C: Time: Temp: M a 0 MTC was on site for a final inspection of the work completed 0 C at Woodway Elementary. MTC verified that the bolting and epoa anchors were tightened. This was a: M completed on building A thro2gh G To the best of my knowledge this work is in compliance with z the approved plans, specifications, and RFI's. C > 0 -n -n �a m m 0 5) 0 0 c: m (n In 0 Z ;a z 3: z m REPORTED BY: R.Blchel, WABO Special Inspector REVIEWED BY: Steve Barrie, Technical Director DISTRIBUTION: original: choun(Wednionds.wednetedu cc: inattQggarchitects.cont cc: calvin(a)ggarchitects.com gonta@vennafli s.conn cc; hryanz(a)cplInc.eorn cc: urnbaugh(aki.edmondsma.us 171OMidwayCourt Centralia, WA98531 - Phone (360) 330�7926 - Fax(360)330-7946 1208 Bay Street, Ste. 100 Bellingharri, WA 98225 - Phone (360) 647-6061 Fax (360) 647-8111 Website Address: www,nitc-inc.net ��A 2-q 0* 3-F 5W _6q& Materials Testing & Consulting, Inc. MTC Geotechnical Engineering * Materials Testing * Special Inspection Environmental Consulting VIA EMAIL: ChouN@edmonds.wednet.edu October 5, 2006 Mr. Nick Chou Edmonds School District # 15 204020 68th Ave. West Lynnwood, WA 98036-7400 Wh RE: Final Letter - Woodway Elementary School located at ZW24 Street SW, Edmonds, Washington Permit No. 2006-0461(Edmonds) Dear Mr. Chou, Materials Testing & Consulting, Inc. ("MTC") performed materials testing and special inspections at the above -referenced project. This letter is a statement declaring the actual work MTC inspected as itemized below was performed in accordance with the project plans and specificatiorR EEI ns and/or accepts approval; and is in accordance with the standards of The International Code Counci responsibility only for the work which we inspected, and an MTC report was geric"AV-2 6 2007 o Reinforced Concrete including Epoxy Inspection DEVELOPMENT'SERVICES CTR. CITY Or IMMONDS 9 Structural Steel and Welding, including Fabrication Shop Welding Inspection * Lateral Framing If you have any questions, or require additional documentation, please feel free to contact our offices at (360) 755-1990 at your convenience. Respectfully Submitted, MATERIALS TESTING & CONSULTING, INC. Niall Hackett Technical Director cc: matt@ggarchitects.com calvin@ggarchitects.com gonia@vcmails.com bryanz@cplinc.com umbaugh@ci.edmonds.wa.us H - 777 Ch,y.,I,r DO,,. - R.ril.gtv., WA 98233 , Ph,,3n3e0(360) 755-1990 - F.. (360) 755-1980 _1!2 -7946 0 A 98531 . Ph— (360) .7926 . izax (360) 330 2126 mil"y C Ili.gh­, WA 98226 - Pho.. (360) 647-6061 . F­ (360) 6414111 Rd., S�hc #11 Z in Co M 0 0 TIT in Z C -n m in a- 0 Cl) 0 in 0 Z X Z Z 9 0 m April 23, 2007 CPL job # S05-1509-01 To: Nick Chou RE: Woodway Elementanj Voluntani Seismic Upgrade Structural Observation Completion z Dear Nick: 0 M The purpose of this letter is to acknowledge that Structural Observation in accordance with IBC Section 1709 has been completed for the Woodway Elementary Voluntary Seismic Upgrade project. Any observed deficiencies were brought to the attention of the contractor and noted in 0 site visit reports and/or project minutes of meeting. m c:: rn The noted deficiencies were either visually observed as being completed during a subsequent site 0 0 C visit, or verified by the contractor as being completed. To the best of our knowledge, the project m has been constructed in accordance with the Contract Documents. m z C > C: Sincerely, RECERVED 0 -n Todd Wood, P.E. COUGHLIN PORTER LUNDEEN, INC. APR 2 6 "'DW m m 0 DEVELOPMI:N1 sEFIV-In�S CTR 0 r- 0 m CITY OF r.oMoW�S C ri) M 0 C0 WA X z 21282 z 0 ()NA 0 M Permit Inspection Details Permit: BLD20060461 PERMITT,-,,A,�x Y,4 i�/;2612007 Snook �O APPROVED y Total Time: 30 Total Inspections: I Total Time: 30 z 0 M M 0 80 Im Jo Z 0 '41 M T a CO 0 0 CO Ca M 0 z M 71912009 9:51:33 AM Page I of 1 5