20060472A.pdfFINAL PROJECT APPROVAL FORM TO: DATE: MEMOTO: P O� 0, DIVISION �IUILDING FROM: FIRE DEPARTNIENT DATE �-/O Co ENGINEERING DIVISION DATE PLANNING DIVISION DATE z PROJECT 4-eK�� 0 SITEADDRESS -79 71f, AY a PERMIT #___06 -477 ADBN DATE INSPECTED 6 rn C 0 0 0 0 C: DESCRIPTION OF WDRK TO BE INSPECTED ­4 K = m mz ,0 --1 A field inspection was conducted to determine compliance with approved plans. Final approval C 5; denotes that there are no objections from The above signed Department to lbe release of 0) PERFORMANCE BONDS and the granting of: 0 n n� 3:9 ��dGRANT FINAL PROJECT APPROVAL m 0 7'- 0 0 M C Cn C co M 0 GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector > z z 0 FAILED FINAL INSPECTION - OUTSTANDING ISSUES -i 0 Copy of CORRECTION NOTICE given to owner/contractor by inpcctor I 0 m 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature I:1emp:bldg:fbrms:ocaprvI 3!25,'04 Permit Inspectio n Details Permit: BLD20060472A PERMITTr,1AX 05/26/2006 MSffall 30 approved y Total TI..: 30 Total Inspections: Total Time: 30 z M C a ITI 0 —40 OC M M MT On n M ITI 0 0 CO, C V) A 0 X z z ITI 6/23/2009 11:58:11 AM Page I of 1 p RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SET13ACKS ..................... FOUNDATION: Footing ................. wait ................... z 0 Pier/Porch ................. I 0 Retaining Wall ........... Slab Insulation .......... PLUMBING: M Underground ............. M 0 Rough 0 -in ................... r_ Commercial Final M M z ID a > Gas,Test: ............. Gas Piping .......... 0 -n n Equipment ................. M ITI Commercia(Final 00—) 0 17, EXTERIOR SHEATHING 0 M NAILING .......................... C: C/) FRAMING ........................ i Q 0 - FIRST FLOOR FRAMING... INSULATION ................ z Floor Insulation Wall Insulation ........... z Ceiling Insulation SHEETROCK NAILING 0 M SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY ..................