20060472A.pdfFINAL PROJECT APPROVAL FORM
TO:
DATE:
MEMOTO: P O� 0, DIVISION
�IUILDING
FROM: FIRE DEPARTNIENT DATE �-/O Co
ENGINEERING DIVISION DATE
PLANNING DIVISION DATE
z
PROJECT 4-eK��
0
SITEADDRESS -79 71f, AY
a
PERMIT #___06 -477 ADBN DATE INSPECTED 6
rn
C 0
0
0
0 C:
DESCRIPTION OF WDRK TO BE INSPECTED
4 K
= m
mz
,0 --1
A field inspection was conducted to determine compliance with approved plans. Final approval
C 5;
denotes that there are no objections from The above signed Department to lbe release of
0)
PERFORMANCE BONDS and the granting of:
0 n
n�
3:9
��dGRANT FINAL PROJECT APPROVAL
m
0
7'-
0
0 M
C Cn
C co
M 0
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
0 Copy of CONDITIONS given to owner/contractor by inspector
>
z
z
0
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
-i
0 Copy of CORRECTION NOTICE given to owner/contractor by inpcctor
I
0
m
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
I:1emp:bldg:fbrms:ocaprvI 3!25,'04
Permit Inspectio n Details
Permit: BLD20060472A
PERMITTr,1AX
05/26/2006 MSffall 30 approved
y
Total TI..: 30
Total Inspections:
Total Time: 30
z
M
C a
ITI 0
—40
OC
M
M MT
On
n
M ITI
0
0
CO,
C V)
A 0
X
z
z
ITI
6/23/2009 11:58:11 AM
Page I of 1
p
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
SET13ACKS .....................
FOUNDATION:
Footing .................
wait ...................
z
0
Pier/Porch .................
I
0
Retaining Wall ...........
Slab Insulation ..........
PLUMBING:
M
Underground .............
M
0
Rough
0
-in ...................
r_
Commercial Final
M
M z
ID
a
>
Gas,Test: .............
Gas Piping ..........
0 -n
n
Equipment .................
M ITI
Commercia(Final
00—)
0 17,
EXTERIOR SHEATHING
0 M
NAILING ..........................
C: C/)
FRAMING ........................
i
Q 0
-
FIRST FLOOR FRAMING...
INSULATION
................
z
Floor Insulation
Wall Insulation ...........
z
Ceiling Insulation
SHEETROCK NAILING
0
M
SPECIAL INSPECTION
MISCELLANEOUS ..........
FINAL APPROVAL FOR
OCCUPANCY ..................