20060480.pdfPermit Inspection Details
Permit:
BLD20060480
PERMITTP-1,',,
... . .......
Compieteu",,M!-,
-Rg
0711812006 MS
20 CORRECTION NOTICE WRITTEN
N
11130/2006 Snook
20 APPROVED
y
Total Time: 40
iF"
PAO
0711812006 MS
20 CORRECTION NOTICE WRITTEN
N
1113012006 Snook
20 APPROVED
Total Time: 40
z
Total inspectiomn 4
Total Time: 80
M
C
M
-40
0
C
M
M z
to --i
O'n
-n
M M
0
0
0
C
M 0
Z
z
—11
in
z
—04
0
M
v�i
6/22/200911:18:57AM
Page i of I
RECORD OF INSPECTIONS
INSPECTOR
DATE APPROVED
SETBACKS .....................
FOUNDATION:
Footing .......... ...........
Wall ...............
Pier/Porch
Retaining Wall ...........
z
Slab Insulation
PLUMBING:
Underground
M
C
M 0
6or6iarclal Final
0
0
HEATING;
M
Gas Test ...............
z
C
Gas Piping ............
>
Equipment
Commercial Final
O'n
-n �q
-4-
EXTERIOR SHEATHING
M M
NAILING ..........................
FRAMING ... ....................
0
0 fn
C (1)
FIRST FLOOR FRAMING
C (A
M 0
INSULATION ..........
Floor Insulation
;D
Wall Insulation
z
Ceiling Insulation
SHEETROCK NAILING
z
SPECIAL INSPECTION
0
M
MISCELLANEOUS
FINAL APPROVAL FOR
Lv
OCCUPANCY ..................