Loading...
20060503.pdf7910 Zt-6-1­" �SA- 6W "'j; ��41111!� Iml AY 1 MAY p, OWNER/0,0NTR,*,nTUR IS RESPONSIKE FOR, CON'T90), 'pN EROSION AND DRAINAGE z BY E 'i'H "k, tol. om 24 HR. NOTICE REG. FOR INSPECTION vo i;i LOF, c MO 0 80 C) eq 1 IOZ V % c m m z 14(J05e 83- /q77 Z 105 toZ, (4 G c >1 6 ZY/ I q7F b q S Wq pk-'P015� 'N us at I-).JI - q'- o"n -n 1-0 be- 4Md4 mm Drl'v-e-- 79 161 + 100 a 0 0 F. -2-10 IS- C (a -To ft- m 0) M iw M T z zone _FlaW Comer.So )rag I TOP t -+100 Setbacks Reclul Actu Front (W) '751 z Sides _74- Rear A'- -Other -+v ew'E,� LVfi, A PAP V E NNING �f T" o J" 10 -7d' Al <-- 71 Odd celcf Ftw 40M t c000v jr\ct q,,)r led,�\ GARY HAAKENSON CITY OF EDMONDS MAYOR -(425) N, 121 STH AVENUE NORTH EDMONDS. WA 98020 771-0220 FAX (4251771-0221 Wobsile: �Ci.edmondSma.US DEVELOPMENT SERVICES DEPARTMENT Planning Building Engineering May 31, 2oo6 Tom & Sanita Shandil 7910 2181h Street Southwest Edmonds, Washington 98026 RE: Plan Check #06-169 Dear Mr. &Mrs. Shandil, Thank you for providing information to the City last week about your subcontractor's health dy recovery. When you inquired on the status of your permit condition, we wish him a spee for the second story addition over the garage it was suggested that perhaps work had application t approval has been granted by the City as of started without a permit. I assure you that no permi today for any portion of this project. Also, I am required to officially inform you that if work has The target initiated it must immediately cease and desist until a permit is issued by the City. review date for the last round of corrections on your project is June 6rh, if you do not receive a 425-771-0220 extension response by this date please call JoAnne Zulauf, Permit Coordinator, at 1336. Currently, your application indicates that you as property owners will perform all work associated with this project; if that is not true you will need to amend the permit application on file with the City. State Law allows all property owners to perform all construction work on their own property. State Law also allows property owners to be designated as the 'general contractor' for their own project, Since you have already indicated a contractor is associated with this project it appears that you should designate yourselves as the general contractor. As general contractors you are required to hire a minimum of two subcontractors for different aspects of the project, You are also required to verify that all subcontractors that you hire are currently State Licensed and also have City business licenses. Failure to adhere to State licensing requirements can carry fines of $5,000.00. If you have any questions about these regulations call the State Licensing Department at 1-800-647-0982, Sincerely, J ?..ine Taf Building Official Incorporated August 11, 1890 z 9 0 m C to M 0 0 80 C -i C X m m o -n n -4 X mm 0 0 0 a ca 90) M 0 z -4 z 0 m GARY HAAKENSON MAYOR CITY OF EDMONDS 121 5TH AVENUE NORTH EDMONDS, WA 98020 - (425) 771 �0220 FAX (425) 771-0221 Websile: -i,edmondS.W&US DEVELOPMENT SERVICES DEPARTMENT 1) Planning Building - Engineering July 21, 2006 Tom & Sanita Shandil 79102 181h Street Southwest Edmonds, Washington 98026 RE: Building Permit 92006-0505 Dear Mr. & Mrs. Shandil, The purpose of this letter is to inform you that the City has received a citizen complaint regarding your building project. Specifically the complaint alleges that the original approved addition which according to City approved plans measures 22 feet by 22 feet with a 4 foot deck extension has been increased to 36 feet by 36 feet in size. The complaint also alleges that plumbing and electrical work has been performed by unlicensed persons� Be advised, homeowners may perform plumbing and electrical work on homes they own but any person you hire for such work must be State Licensed. The City requests inspection access for the purpose of determining whether or not the scope of work has increased beyond the approved plans. Please contact the City Building Inspector by no later than August I I th to schedule a day and time to meet on site to investigate the alleged expansion of the addition. If there are circumstances beyond your control that wi It prevent you fromf scheduling an inspection by August I I'h please immediately inform my office and propose an altemate date for inspection. It is'not the City's intent to cause you undue hardship however, compliance to the codes is mandatory for the fair and equal treatment of all citizens. If you have any questions about the f laint please contact me directly during City business hours of 9:00am to noon and 1:00pm comp to 4:00pm, Monday through Friday. Sincerely, Jeannine L. Vraf Building Official Z 2 0 in a in C: a m 0 --10 0 C :0 K in m C —Z to 0 -n n m in 0 U5 0,- 0 C in 0 Z r- ;0 Z W. Permit Inspection Details 147 Permit: BLD20060503 RERMITI��Z,N 1001 -:E.E I roslon Contfol/Mobillizatio 'n Corn�iloto?�� 06/1412007 Sibrel 30 y Total Time: 30 1077 - E-Engineer ng �Final i ci)rnplete��, y 06114/2007 Sibrel 30 Total Time: 30 1126' B P�lurnb Roughln comp'lla to 08/24/26o6 m� 25 APPROVED y Total Time: 25 11�10 �:B-Eqtilprnent.M' ch Complete 11/16/2006 Snook 20 APPROVED y Total Time: 20 11U-�B-EjtterlbirStveathing� ditriplete? Y�' 06/23/iO66 Ms 20 EXTERIOR SHEATHING APPROVED y Total Time: 20 1136' B-Shear?Nai11ng:,,; C 06/2W2006 MS 20 SHEAR�APPROVED y Total Time: 20 1142 -B-Frarning c I t ? i� pro, e 1110812006 Snook 25 CORRECTION NOTICE WRITTEN N 11113/2006 Snook 20 NO ACCESS 9:22 AM N 11/1612006 Snook 20 APPROVED y Total Time: 66 1144 1 -:BMall I . nsulati I on I IC - 4 ulk,- - c lete 11/13/2006 Snook 20 NO ACCESS 9:22 AM N 11/16/2006 Snook 20 APPROVED y Total Time: 40 11484* a Celling lrisuliticiniciu*,'� 03/26/2007 Snook 25 APPROVED y Total Time: 26 170 thpi 12�61/i()66 Radwin 35 INSPECTED AND APPRO�D y Total Time; 35 1156,121 -Building Final� 03/26/2007 Snook 25 CORRECTION NOTICE WRITTEN N 0611512007 Readwin 30 INSPECTED AND APPROVED y Total Time: 55 Total Inspections: Is Total Time: 365 Page I of I RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ................ - FOUNDATION: Footing ...................... Wall .......................... Pier/Porch ................. Retaining Wall ........... z 0 Stab Insulation -i 0 PLUMBING: Rl Underground A� 1 C8 Fn --j RoUgh-In ............... . 0 C M 0 Commercial Final M HEATING: -40 0 C Gas Test ............... --I K X M M z Gas Piping ................. 2 --I Equipment .............. C/) Commercial Final 0 -n n ;0 EXTERIOR SHEATHING x NAILING ............. ............ IT ITI 0 FRAMING ................... 0 FIRST FLOOR FRAMING... 0 M C MO INSULATION ............ Z Floor Insulation Wall Insulation ........... Ceiling Insulation 0 z SHEETROCK NAILING V) SPECIAL INSPECTION z 9 0 M MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .............. aw —05003vo, d ',7