Loading...
20060558 Lovell Review 2.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Plan Check : Date: # 05-571 February 22, 2006 Project Name/Address: Lovell / 8312 Talbot Rd Contact Person/Address/Fax: Steve Lovell / e-mail: snlovell@comcast.net Reviewer: Jeanie McConnellDivision:Engineering During review of the subject submittal it was found that the following information, corrections, or clarifications will need to be addressed: 1.Provide section view of storm detention system and water service and side sewer crossings. Response comments received 2/3/06 note there are no crossings, so no section provided. o The drainage plan dated 11/23/05 showed both the water and sewer crossing the storm detention o pipe. The drainage plan dated 2/3/06 does not show the storm detention pipe at all. The storm o detention system must be shown on the drainage plan and a section view is required if there are in fact utility crossings. 2.Please submit 3 copies of the Detention System Worksheet. This worksheet can be found in the Storm Water Management Handout #E72 (attached). Only two copies of the detention system worksheet were submitted, however this worksheet can o no longer be used, see note below in item #3. 3.The drainage plan indicates the surface water runoff from the roof over the existing residence will drain to the new detention system. The detention system has only been sized for the new impervious area. Either separate the impervious areas or resize the detention system accordingly. If the impervious area exceeds 5000 sf the detention system must be designed and stamped by a licensed engineer. Detention is now being sized for over 5000 square feet of impervious area and the City’s standard o detention system worksheet can no longer be used. The storm detention system must be designed and stamped by a licensed engineer. 4.Provide RIM and invert elevations at all CB’s, including the CB in the right-of-way. Response comments received 2/3/06 note RIM at street @100 assumed, invert per City Planning. o As part of the submittal requirements for this plan review, you are required to submit RIM and o invert elevations for the catch basin in the City right-of-way as well as for the catch basins installed as part of the storm detention system. 5.Clearly indicate which portion of the driveway is new (proposed) and which portion is existing. How will the driveway surface water runoff for the new driveway be collected and distributed to o the storm detention system? DATE E-MAILED 2/22/2006 PAGE ____ OF ____ 6.ok 7.ok 8.ok 9.Provide finished floor and bottom of footing elevations on the grading plan. This information will be used to verify grading calculations. Please note that grading in excess of 500cy will require SEPA. Using the bottom of footing elevations provided, grading for the addition has been calculated to o be in excess of 500cy. About 470cy of cut has been calculated for the garage alone. This calculation was derived from using the bottom of footing elevation provided of 106 and topography contours which indicate original grades from 130 to 114. Grading in excess of 500cy requires SEPA. Please contact Gina Coccia, Planner for more o information on the SEPA process. 10.ok 11.ok Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. DATE E-MAILED 2/22/2006 PAGE ____ OF ____