20060575 - 18210 Homeview Dr - geo insp 049207.pdfD emnis M. Bruce,, P.E. M.S.C.E., M.B.A. Geatechnical/ 1vil E-tig ineer RECEIVED April 29, 2007 - MAY 8 - 2007 ENGINEERING DIVISION City of Edmonds 121 5 th Ave. N Edmonds, WA 98020 Subject: Field Reports - Geotechnical Inspections 7312 172nd St. SW, Edmonds, Washington Sylvester Addition Project Permit No. 2006 - 0610 This engineering report presents the results of ongoing geotechnical inspections for the Sylvester house addition and yard grading project at 7312 172nd St. SW, Edmonds, Washington. These inspections were required as a condition of permit by City of Edmonds. REFERENCES: • City of Edmonds approved Project Plans • Geotechnical Report by D. Bruce, P.E. • Site photographs GEOTECHNICAL INSPECTIONS: This engineer continues to perform on -site geotechnical inspections as required by City of Edmonds authorization. Inspections occur daily during active geotechnical phases, and at a minimum of 2 inspection visits per week. City of Edmonds Inspection Items: Soil Cuts: This engineer coordinates with project contractor (Kearsley Homes) to verify specific excavation alignment and depth of cuts (see photographs). No temporary shoring is required due to the shallowness of excavation. All soil cuts are stable through this date (April 29, 2007). SO'LS * FWNDATMS * S"E DEMOPMENT * INSPECnON * DIWMqG,= 0 DESIGN &PERMIT - LEGAL P.O. Box 55502 - Shoreline, WA 981s5 * (206) W-9217 - FAX (206) 546-8442 Seattle D.P.D. Re: Mr. and Mrs. Sylvester April 29, 2007 Page 2 Sub -Grade Verification: This engineer performed on -site inspections and has verified extremely dense, glacially consolidated sub -grade soils that easily provide 3,000 p.s.f. bearing capacity. "OK" to proceed with foundation formwork, reinforcing steel and concrete placement for the house addition foundation. This engineer continues to work with project contractor to assess the requirement for the secondary (outside) retaining wall. Actual site conditions dictate that the previously permitted "outside" retaining wall be eliminated in order to lessen the load weight on the slope face. Rather than have a heavy (non -needed) concrete retaining wall at the top -of - slope, this engineer recommends that the future walkway zone be supported on localized posts and small concrete piers. This design modification will greatly lessen the overall impact to the adjacent slope. Specific geotechnical criteria to follow. * Retaining Wall Placement: Not yet. Placement of Fill: On -site discussions with contractor and excavator indicate that the southern deck / patio zone will require some amounts of fill. This engineer laid out a setback limit dimension (from top -of -slope) in order to control the extent and height of fill material. No fill material has yet to be placed, however, this engineer will perform on -site inspections to verify material type, compactive effort and overall dimensions of the fill zone. 0 Subsurface Drainage: Not yet. Erosion Control: Kearsley Homes properly established a rocked construction entrance and top -of -slope siltation fencing. Additionally, exposed earth has been covered with proper plastic tarp (see photographs). All temporary erosion control measures are approved through this date (April 29, 2007). SUMMARY: Ongoing geotechnical inspections have verified proper completion of geotechnical aspects to date (April 29, 2007). Seattle D.P.D. Re: Mr. and Mrs. Sylvester Apri129,2007 Page 3 0 Geotechnical inspections are ongoing. If there are any questions, do not hesitate to call. EXPIR�S jrn37'9r)Fj:] DM -abj cc. r. �and Mrs. Sylvester Dennis M. Bruce, P.E. Geotechnical / Civil Engineer ilk" A 1�