20060614140804.pdfOV. ED -4
City of Edmonds
TP Development Services Department
Build ing-Engineeri ng-Pla nni ng
121 5"'Avenue North -2"d Floor
Edmonds, WA 98020
10C. Phone: 425.771.0220 Fax: 425.771.0221
XCOVER PAGE
To: -Dou-& From: In, YLU
I
Date Transmitted: Recipient's Fax No: 77 ZA lNo. of Pages:
V V
(including cover page,)
If there are any problems during transmission or documents are received incomplete, please
call 425. 771.0220 and ask for:
L:Ternprjana/forrns/OSFAX
Eagle Eye Consulting Engineers, PS
PO Box 523
01alla, WA 98359
hoytjeter@centurytel.net
253 857-4151
Fax 253 857-5759
To: JoAnne Zulauf
City of Edmonds
Edmonds, WA 98026
Re: Miller Residence
17910 Kairez Dr
Edmonds
Plan Review # 05-474 Revisions EECE 4 EDM 06-30
Foundation Revised to Piles
structurc
Ai�va SJI,'�
Lower Floor
2673
Main Floor
2758
Total
5431
Garage
686
Total
6117
Deck first floor
5
Grand total
6649
The above referenced project is in the process of plan review for compliance with
Edmonds ordinances and applicable codes. The following conunents,
deficiencies/corrections must be addressed prior to completion of plans review and
subsequent issuance of permits.
Provide revised plans and calculations along with a written response to each of the items
listed below to facilitate a shorter back -check time.
SCOPE OF REVIEW
The scope of this review isfor the Structural Only requirements of this project.
All features were checked only to the extent allowed by the submittals provided. All
portions of this project are assumed to meet or will meet other departmental requirements,
conditions and concerns before permit approval.
ProjectName: MillerResidence
Plan Review # 05-474 Revisiolls
STRUCTURAL COMMENTS
General
Page 2 of 3
EECE # EDM06-30
1, Please submit geotechnical report that deal with a pile foundations. The report per
Dennis M. Bruce is for conventional foundation. The Engineering analysis states
all the information was supplied verbally to him. Without this information there is
no way to complete the review of the pile foundation system. Please submit this in
order to complete the review. I will make the assumption the verbal is correct but a
geotechnical report is required to be submitted to justify design and to verify the
information is shown on the drawings as required per this report. IBC 1808.2.2
2. A -574, OFRE""ioe 5�pee-'iksr-eqAutirepEdtfVore'tjh$is type of foundation system. This shall
be prepared by a register design professional. Please submit this for this type of
foundation system gas(equired per code. IBC 1705 COWUMF-
Pir e *r— WO
FE K fbA pca— !;A c( 1AWO-1 NS
I S ';!I?sWr etlifegrade, beam to support the framing. There was nothing
submitted to justify the grade beam design. How was the reinforcement
determined? Submit analysis for the reinforcement shown including the shear
reinforcement. ACT 9.2
4. The original analysis assumes the slab on grade will be resisting the lateral sliding.
Based off the soil properties and piles are required please submit justification to
use the slab to resist sliding. The geotechnical engineers should give the
requirement for the slab to resist all the sliding in this report when foundation
system has changed. This was not in the original report if piles are to be used.
Please address this on the response and modify accordingly. IBC 1806
5. Maximum spacmig of the pile per analysis state 10 feet on center. But based off the
architectural drawing this will be exceeded. For example the grid A per sketch
show one pile to be added in the middle and the total length is 23 feet. This would
cause the spacing per design. Please resubmit drawings clearly specify the location
of the piles to assure the required design is not exceeded. (There are other location
where the spacing will be exceeded)
6. It appears the deck loading was not included when calculating the required force
applied the grade beam. Please resubmit analysis to account for this loading. IBC
1605
7. Submit analysis for the deck footing to resist the required forces. Piles were not
used at this location and this must be design to show the footing will be able to
resist the loads applied.
Project Name: Miller Residence Page 3 of 3
Plan Review # 05-474 Revisions EECE # EDM06-30
8. Design analysis assumed the force will be uniform applied along the grade beam.
This is not correct at the column locations. Typically piles are added directly under
the coluirms where point loads applied to the foundations. Alternative the reactions
and moments can be checked with the point load applied at this location and the
loads are distributed over to the piles if the grade beam can transfer this load.
Submit analysis to justify. IIBC 1604.4
9. Currently the new drawing by the engineer does not show how the exterior support
at the master bathroom will be supported. The building framing extends out 3'6
and there are no piles or grade beam to support the framing. How is this to be
supported? Please either submit geotechnical report that conventional foundation
may be used at this location or add piles to support this required forces.
Additional corrections may be required following receipt of corrections and
additional information as requested.
Your plans are being reviewed concurrently with the Building Department, Fire
Department, Zoning Department and Public Works Engineering. Changes,
clarifications or additional corrections may be required subsequent to the Building
Department plan review when comments are received from the other concerned
departments.
Should you have any inquiries regarding this letter, please contact Hoyt Jeter at
(253) 857-4151 between 8:00 a.m. and 5:00 p.m.
By:
Hoyt Jeter, P.E.
President
CITY OF EDMONDS
SPECIAL INSPECTION AND TESTING AGREEMENT
The project at issued under building permit
number requires special inspection and/or testing per IBC Chapter 17. The
complete list of special inspections is attached to this document.
BEFORE A PERNUT CAN BE ISSUED: The owner and contractor and special inspector shall complete
this agreement and the attached structural test(s) and inspections schedule including the required
acknowledgements.
APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building
Official prior to performing any duties or inspections. Each special inspector shall submit Statement of
Qualifications to the Building Official for review. Special inspectors shall display identification When
performing special inspections on site. Special inspection and testing shall meet the minim -am requirements
of IBC Chapter 17 and the following:
A. Duties and Responsibilities of the Special Inspector
1. Observe Work
The special inspector shall observe the site work for conformance with the approved (stamped) plans
and specifications and applicable workmanship provisions of the IBC. Architect or Engineer
reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be
performed on a continuous basis —meaning that the special inspector is on site at all times observing
the work requiring special inspection. Periodic inspections, if any, must have prior approval by the
City based on a separate written plan reviewed and approved by the Building Official and the
engineer or architect of record.
2. Report Non -conforming Items
The special inspector shall bring non -conforming items to the immediate attention of the contractor
and note all such items in the daily field report. Any item not resolved in a timely manner shall be
immediate cause of the special inspector to notify the Building Official of the plan deviation, error,
change or omission. It shall also be the duty of the special inspector to promptly notify the engineer
or architect.
3. Complete Daily Reports
Each special inspector shall complete and sign both the special inspection record and the daily report
form for each day's inspection. These records shall remain at the jobsite with the contractor for
review by the City Building Inspector.
4. Furnish Weekly Reports
The special inspector or inspection agency shall furnish the City with weekly reports of tests and
inspections. The project engineer or architect, and others as designated shall also be copied on
reports. Weekly reports must include the following:
Description of daily inspections and tests made with applicable locations
List of all non -conforming items
Report on status of non -conforming items (resolved or unresolved)
Itemized changes authorized by the Architect, Engineer and City if not included in non-
conformance items.
5. Furnish Final Construction Report
The special inspector or inspection agency shall submit a final signed report to the City stating that
all items requiring special inspection and testing were fulfilled and reported. And, to the best of
L:�TEMP\B'LJILDING\SpeciallnspectionAgreementIBC.doc 7/04
his/her knowledge the project is in conformance with the approved plans and specifications,
approved change orders and the applicable workmanship provisions of the IBC. Items not in
conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed
inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically
itemized in this report.
B. Contractor Responsibilities
1. Notify the Special Inspector
It is the duty of the contractor to notify the special inspector when work is ready for special
inspection. Note, the items listed on the attached schedule and as noted on the approved plans and
specifications are required to have special inspections. Adequate notice shall be provided by the
contractor so that the special inspector has time to become f=iiliar with the project.
2. Provide Access to Approved Plans
The contractor is responsible for providing the special inspector access to approved plans at-1he
jobsite.
3. Retain Special Inspection Records
The contractor is responsible to retain at the jobsite all special inspection records submitted by the
special inspector. These records are to be provided to the City building inspector upon request.
C. Cily of Edmonds Building Department Responsibilities
1. Approve special inspectors or inspection agencies
The building department shall approve all special inspectors and special inspection requirements.
2. Monitor special inspection and approve weekly reports
Work requiring special inspection and the performance of special inspectors shall be monitored by
the City Building Inspector. Ms/Her approval must be obtained prior to placement of concrete or
other similar activities in addition to that of the special inspector.
3. Issue Certificate of Occupancy
The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports
including the final report have been submitted and accepted.
D. Owner Resp nsibilities
The project owner or the engineer or architect of record acting as the owner's agent shall fund
special inspection services.
E. EnlZineer or Architect of Record Responsibilities
The engineer or architect of record shall include special inspection requirements on the plans and
specifications.
ACKNOWLEDGEMENTS
I have read and agree to comply with the terms and conditions of this agreement.
Owner
Special Inspector
General Contractor
City Building Official
Date
Date
Date
Date
L:\TEMP\BMLDING\SpeciallnspectionAgreementIBC.doc 7/04
SPECIAL INSPECTION AND TESTING SCHEDULE
MOJECT 14AW
MOIEU ADDRESS
REINFORCED CONCRETE, GUNrM GROUT AND MORTAR:
concrete Gnnft Grout moitur
Aggregate Tests
Reinforcing Tests
Mix Designs
Rrinforcirtg Placentent
Bach Plant Inspecuon
Inspect piacive
Cag Satnol,,
fts
Tests
PRECASTIPRESTRESSED CONCRETE:
Reinforicirip Tests
Tendon Tests
Mix Desims
Reinforcing PlaccMent
Insert Placement
Concrete Ilatclung
Concmrtftaccrnem
Instadlation Insepction
Cast sarnDles
)lc!i
Tests
MASONRY
- SpeciA Inspection Stresses Used
— Preliminary Acceptance Tests (Masonry Units, Wall Prisms)
— Subsequent Tests (Monar, Grout. Field Wall Pjisms)
— Placentcot Inspection of Units
ADDITIONAL INSTRUCTIONS OR OTHER TESTS
AND INSPECTIONS:
Form completed by-
Tclephom No., —
TESTING-4s;� AGENCY � SPECL-1, INSPEC7M
STRUCTURALSTEELIWELDING-
- Sample and Test flis4 spm&lc members below)
— Shop Material Identification
— Welding Inspection 1D Shop 0 Field
— Ultrasonic Inspection 0 Shop 0 Field
— Fligh-surngth Bolting
Inspection DShop OField
[I A325 OX D F
D A490
— Metal Deck Welding Inspection
— Reinfoming Steel Welding Inspection
— Metal Stud Welding hnpeclion,
— Concre-te Insert Welding Inspection
FIRETROOFING:
Placenx-w Inspoction
Density Tests
Thickness Tests
Inspect 132tching
INSULATING CONCRETE:
- Sample and Test
— Placement Jnspeclion
— Unit Weights
FILL MATERIAL:
— Acceptance Tests
— Placernew Inspection
— Field Density
STRUCTURAL WOOD:
— Shear Wall Nailing Inspection
— Inspection of Glu-lam hb.
— Inspection of Truss Joist fidb.
— Sample and Test Components