20060616141346.pdfOV ED _�1;7 77' 0 DATE: June 16, 2006 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Louise Wright 111706 81h Ave NW Seattle, WA 98177 FROM: Jenny Readwin, Plans Exami* RE: Plan Check # 06-246 (Permit Trax 2006-0672) Project: Kauftnan Add/Remodel Project Address: 751 Brookmere Dr. During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the above items to a Permit Coordinator. 1) According to our records no permits were obtained to convert garage into family room. Provide copies of valid pen -nits or this scope of work will need to be added to this application. Provide section detail through this area to show how minimum insulation values were obtained (R-30 floor, R-10 slab, R-21 wall and R-38 ceiling). Also, provide detail through garage door area. According to the plans, it appears that it was left 'in place. We will need a detail of how this area was enclosed. 2) Proposed 2x8 bathroom floor joists will not accommodated R-30 insulation. Upgrade to 2x10 joists or provide rigid insulation. 3) For roof ledger calculations specify nailing at 12" o.c. and plans specify at each stud (16" o.c.). Provide revised calculations or revise plans to match calculations. 4) Engineer of record to specify minimum length of Wedge -all anchors. Diameter and Edge distance was specified but no length. 5) Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. Wedp-e-all Anchors CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT The project at --16q PAcypcxa_Q,� issued under building permit number C_(,d1_Z___ — requires special inspection and/or testing per IBC Chapter 17. The complete list of special inspections is attached to this document. I I BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and spechd inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS. Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification when performing special inspections on site. Special inspection and testing shall meet the minimum requirements of IIBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis —meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special - inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: Description of daily inspections and tests made with applicable locations List of all non -conforming items Report on status of non -conforming items (resolved or unresolved) Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. 5. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L:\TENIP\BUILDING\SpeciallnspectionAgreementIBC.doc 7/04 his/her knowledge the project is in conformance with the approved plans and speciflications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in, this report. B. Contractor Responsibilities 1. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items fisted on the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at -the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building D�Rartment Responsibilities 1. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. HislHer approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports. including the final report have been submitted and accepted. D. Owner Resp usibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Enaineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner Special Inspector General Contractor Date Date Date City Building Official Date L:\TEMP\BUILDING\SpeciallDspectionAgreementl]3C.doc 7/04 SPECIAL INSPECTION AND TESTING SCHEDULE r_VA_ 2,C& -6 �a7Z_ PROJECTNAME BURDWr, PERMIT' NO, PROXCr ADDRESS TESTTW_0sSrECnCN AtENCY" SPECIAL IWNPECTM REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: STRUCTURAL STEELIWELDING: Concrete Gunite Grout Mortar — Sample and Test fIist Specific memben below) Aggregate Tests — Shop Matetial Idewificatioli Reinforcing Tests — Welding Inspection 0 Shop 0 Fxid Mix Designs — Ultr2sonic Inspection 0 Shop 0 FieW Reinforcing Placement — Iligh-surrigth Bolting Batch Plant Inspection Inspection 0 Shop OField Inspect Placing DA325 EIN DX D F Cam Samples D A490 Pick-up Samples Metal Deck WtIding Inslimtion Compression Tests Reinforcing Steel Welding inspection PRECAST/PRESTRESSED CONCRETE: Metal Stud Welding Inspection Concrete Insert Welding Inspection Reinforcing Teas Tendon Tests Mix Desiims Reinforcing Placement Concrete Placement lwwwi"'n Inscpcuon Cast Sa=)cs Tests MASONRY: - Special Inspection Stresses Used — Preliminary Acceptance Tests tMason, v Units. Wall prisms) — Subsequent Tests (Mortar, Grout, Field wall prisms) — Placement Inspection of Units ADDITIONAL INSTRUCTIONS OR OTHER TESTS AND INSPECTIONS; FW-PROOFING.- - Placerricrit Inspection — Dewily Tests — Thickness Tests — Inspca B3tching INSULATING CONCRETE: - Sample and Test — Placement Inspection — Unit Weights FILL MATERIAL: - Acceptance Tests — placelnew Inspection — Field Dewily STRUCTURAL WOOD: Shear Wall Nailing Inspecrkm Inspection of G)li-iazn 172b. Inspection of Truss Joist Fab. Sample and Test Comporients Form completed by: Title: Telcphoric No.: Darr: