Loading...
20060619131254.pdf9 1,9 t City of Edmonds Critical Areas Checklist The Critical Areas Checklist contained on this, form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. With a signed copy of this form, the applicant should also submit a vicinity map of the parcel with enough detail that City staff can find and identify the subject parcel(s)- In addition, the applicant is encouraged to include any other pertinent information or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site. I bave completed the attached Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column bf,-Iow)- Owner / Applicant: td&-X'(V,S Natne Title ,a/YrC7/-) Street Address City, State, ZIP Phone Signature Date Applicant Representative: Naine Title Street Address City, State, ZIP Signature Phone Date Critical Areas Checklist Site InformaT Project Name: Permit Number SiteLocation: 0zZy7d_,)-2 Property Tax Account Number Approximate Site Size (acres or squaire feet) - Have you filled out a Critical Areas Checklist for a project on this site, before? Z�Z General Site Conditions 1. Has the site been cleared or logged? Z2Z=4:::� Date of most recent action: Soils / Topography 2. In the.Snohomish County Soil Survey, what is the mapped soil type(s)? 3. Describe the general site topography. Check all that apply. &!!:�7 —Flat: less than 5 feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10 feet over a horizontal distance of 66 feet.) —Hilly: slopes present on site of more than 15% and less than 30% a vertical rise of 10'fiet of horizontal distance-) Steep: grades of greater than 30% present on site. Comments Hydrology/Vegetation 4. Site contains areas of year-round standing water: 5. Site contains areas of seasonal standing water. 4'�6 Approx. Depth: 6. Site is in the floodway 17e) floodplain of a water course. 7. Site contains a creek or an area where water flows across the grounds surface? %>6L=�,ows are year-round? lows are seasonal? 8. Site is primarily: forested -meadow shrubs :Ve5_; mixed I �:-_-9. Obvious wetland is present on site: /-Y L6 10- Wetland inventory or map indicates wetland present on site: Al I L Critical Areas inventory or map -indicates any Critical Area on site. MEMORANDUM MY OF EDMONDS PLANNING DIVISION June 8, 1992 TO: JEFFREY S. WILSON, AICP, CURRENT PLANNING SUPERVISOR CA-92-66 FILE FROM: JOHN BISSELL, CODE ENFORCEMENT TECHNICIAN SUBJECT: CRITICAL AREAS STUDY, CA-92-29 I have reviewed the site located at 752 Dayton Street. There is an unmapped stream on the site along the southern property boundary. Jim Walker of the Engineering Division informed me that this stream is a year round stream, but that it flows underground both naturally and by diversion. Therefore there are no fish in this stream. A stream which flows year round, but has no fish is defined as a class 2b stream and requires a 25 foot buffer and a 15 foot building setback from the required buffer. ECDC 20. ISA.050(D) and 20.15A. 150(A) state that if a critical area is determined to be present on site, a critical area study shall be conducted. In this case I recommend that the study be conducted by a hydrologist and a land surveyor, licensed in T he the State of Washington. The hydrologist is to delineate the top of the stream bank on the site. hydrologist should also create any mitigating measures appropriate to preserving the stream and surrounding habitat, . After the wetland biologist has delineated the wetland boundary, I recommend that a surveyor, licensed in the State of Washington physically mark the top of the stream bank, then delineate and physically mark the required 25 foot buffer and the required 15 foot building setback from the buffer. The surveyor is then to create a map showing the stream, the buffer and the building setback. Both the Wetlands Biologist and the Land Surveyor shall enter into a three party contract with the applicant and the City of Edmonds as required in ECDC 20.15A. 150(D) If you concur with these recommendations, please state your concurrence in the space provided below. JfffAi S. 461son, AlCP, L Date Current Planning Supervisor PC Building Permit File upon application Street File Applicant