20060619143938.pdf0 PIN, DATE: June 19, 2006 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Phil Kallsen phil@kallsenarchitecture.com /"Vl FROM: Jenny Readwin, Plans Examifteikk ,--I RE: Plan Check # 2006-0677 Project: Vantassell Addition Project Address: 234 4tb Ave N. During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the above items to a Permit Coordinator. 1) The key to the site plan is not on the reduced copy. Please provide a reduced size copy of this information. It can be on a separate sheet of paper no larger than 8 Y2" x 14. 2) On the site plan label main floor as existing and second floor as proposed to clarify scope of work. 3) Provide attic ventilation calculations. 4) Specify all uses of space for the basement floor plan, 5) Specify thickness of existing foundation wall. 6) Verify that the minimum natural light and ventilation requirements of R303 will be maintained with proposed covered porch blocking some existing basement windows (i.e. artificial light and mechanical ventilation). 7) Clarify how 220 efin Whole House Fan in Attic, at specified in the Energy Handout, will provide required ventilation (will this be part of a duct system?). 8) Handrails are required to be continuous the full length of the stairway, Revise exterior porch stair configuration to allow for continuous handrail (can't turn comer at end). 9) Structural calculations need to be stamped and signed by a licensed Architect or Engineer. 10) Sheet S I shows structural general notes, shearwall and holdown schedule by Reed and Associates however we did not receive any structural calculations prepared and stamped by Wendell Reed, PE. Please provide. 11) For detail 12/6 revise ledger bolt size and spacing to 3 1/8" x 4 Y2" @ 4" o.c. or provide calculations stamped and signed to justify size and spacing shown on plans. 12) Calculations for N-S Upper floor West V2calls out SW4 and plans show SW1. Revise calculations to match or provide revised calculations. 13) Show how all loads from 5 1/8" x 6 GLB on the Roof framing plan at the East bedroom between gridlines C and D are carTied to bearing. 14) Provide detailed description on the plans for how underpinning the foundation will be done. 15) Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. 0 Epoxy bolts/holdowns CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT The project at z3q av-c �-J issued under building permit number 2,pote- oce7:7 requires special inspection andlor testing per IBC Chapter 17. The complete list of special inspections is attached to this document. BEFORE A PERIVHT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification When performing special inspections on site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis —meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the specialmspection record and the dafly report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the f6flowing: Description of daily inspections and tests made with applicable locations List of all non -conforming items Report on status of non -conforming items (resolved or unresolved) Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. 5. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L:MMP\BUILDING\SpeciallnspectionAgreementIBC.doe 7/04 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspectionwhen continuous inspections were required, etc.) shall be specifically itemized in this report. B- Contractor Responsibilities 1. Notify the Special Inspector It is the duty of the contractor to not4y the special inspector when work is ready for special inspection. Note, the items listed on the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at.1he jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Department Responsibilities 1. Approve special inspectors or inspection agencies The building department shall approve A special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. ffis/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner Special Inspector . General Contractor Date Date Date City Building Official Date L:\TEMPTUILDING\SpeciallnspectionAgreementIBC.doc 7/04 SPECIAL INSPECTION AND TES 17ING SCHEDULE Van 'r 5c-e-fj PROJEUNAME REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: CoDcr"t Goafte Grout: Mortar JAgMgateTesEs Reinforcing Tests Mix Designs RrinfoTcinq Placta=1 B;ltcb Plant Inspection bspect Ph6n-C Cast Samples Pick-up Samp] Corripmssion Trsrs PRECAST/PRESTRESSED CONCRETE: mt-x� ff"Fr-lems arc -yests ciny Tests Tests Mix ttsqm i Reinforcing Placement Jnscn p1werarni p Concrc i ,=FeRrai.cr1hung re Pja cnxDt corcrCre Pjacenxw Cast MASONRY — Special Inspection Stresses Used — Preliminary Acceptance Tests (Masonry Units, Wall prisms) — Sub-qufml Tests (Mmar. Grout, Field Wall Prisms) — Placeircm Inspeajon of Units Tcsts '2-0062— Oce-77 BU11,DwG Fi3tmrr No- Aklrr'P-T -9 -%FLUAL U4S?ECj10Q STRUCnMALSTEELMELDING: — Sample and Tm (list specific membas below) — Shop MaL-" identification — Welding lraVecu— 0 Shop D Field — Ultrasonic I-P-- DSbop Ofirld — lEgli-strength Bolting luspoction DShop DF)cld 0 A325 ON OX D F D A490 — Metal Deck Welding Inspection — Reinforcing Steel Welding Inspection — MMI Stud Welding Inspection — Conc-le Insen Welding Inspection FIREPROOFING: — Placernera Inspection — Density Tests — Thickness Tests — Inspect Batching INSULA71NG CONCRETE: — Sample and Test — Placcownt inspection — Unit Weights FILL NIATERIAL: — Acceptance Tests — Placement Inspection — Field Dcnsity STRUCTURAL WOOD: — Shm wall Nailing Inspe"ion — Inspection of Glu-Jam F-2b, — Inspect ion of Ty uss Joist Fib, ADDITIONAL INSTRUCTIONS OR OTHER TESTS Sample and Test Components AND INSPECTIONS: LP� Lbg=�Qpvs) JQ.5 I-- —Pk" by- Telephom No- — R.. BUILDING PLANNING TABLE R301-5 MINIMUM UNIFORMLY DISTRIBUTED LIVE LOADS (in pounds per square foot) USE LIVE LOAD Attics with storageb 20 Attics without stoag.b 10 X_ Deckse 40 Exterior balconies 60 Fire escapes 40 Guardrails and handrailsd 200 Guardrails in -fill componentsl _26q_50 Passenger vehicle garagesa 50a Rooms other than sleeping rooms 40 Sleeping room 30 Stairs ForSI:- I pound persquare foot =0.0479 klsi/m� I square inch= 645 mm� I - pound = 4.45 N. a. Elevated garage floors shall be capable of supporting a 2,000-pound load applied over a 20-square-inch area. b. No storage with roof slope not over 3 units in 12 units. c. Individual stair treads shall be designed for the uniformly distributed live load or a 300-pound concentrated load acting over an area of 4 square inch- es, whichever produces the greater stresses. d. A single concentrated load applied in any direction at any point along the top. e. See Section R502.2. 1 for decks attached to exterior walls. f. Guard in -fill components (all those except the handrail), balusters and panel fillers shall be designed to withstand a horizontally applied normal load of 50 poundsonan areaequalto I squarefoot. This load need notbe assumed to act concurrently with any other live load requirement. TABLE R301.6 MINIMUM ROOF LIVE LOADS IN POUNDS -FORCE PER SQUARE FOOT OF HORIZONTAL PROJECTION TRIBUTARY LOADED AREA IN SQUARE FEET FOR ANY STRUCTURAL MEMBER 201 to ROOFSLOPE 0 to 200 600 Over 600 Flat or rise less. than 4 inches per foot (1:3) 20 16 12 Rise 4 inches per foot (1:3) to less than 12 inches per foot (1: 1) 16 14 12 Rise 12 inches per foot (1: 1) and greater 12 12 ForSI: 1 square foot =0.0929 rn� I pound per square foot= 0.0479 kN/M2, I inch per foot = 0.0833 mm/m. TABLE R301-7 ALLOWABLE DEFLECTION OF STRUCTURAL MEMBERSa.b.c STRUCTURAL MEMBER ALLOWABLE DEFLECTION Rafters having slopes greater than 3/12 with no finished ceiling attached to rafters L/180 Interior walls and partifions H/180 Floors and plastered ceilings LJ360 All other structural members U240 Exterior. walls with plaster or stucco finish 1-1/360 Exterior walls —wind loads" with brittle finishes L/240 Exterior walls —wind loadsa with flexible finishes L/1-20 Note: L = span length, H = span height. Footnotes to Table R301.7 a. The wind load shall be permitted to betaken as 0.7 times the Component and Cladding loads for the purpose of the determining deflection limits herein. b. For cantilever members, L shall be taken as twice the length of the cantile- ver. c. ror aluminum structural members or panels used in roofs or walls of sun - room additions or patio covers, not supporting edge of glass or sandwich panels, the total load deflection shall not exceed L/60. Forsandwich panels used in roofs or walls of stuiroom additions or patio covers, the total load deflection shall not exceed LA20. R301.8 Nominal sizes. For the purposes of this code, where di- mensions of lumber are specified, they shall be deemed to be nominal dimensions unless specifically designated as actual di - men sions. SECTION R302 LOCATION ON LOT R302.1 Exterior walls. Exterior walls with a fire s4aration distance less than 3 feet (914 mm) shall have not less than a one - hour fire -resistive rating with exposure from both sides. Pro- jections shall not extend to a point closer than 2 feet (610 mm) from the line used to determine the fire separation distance. Exception: Detached garages accessory to a dwelling lo- cated within 2 feet of a lot line �ave r . 2of egale projec PC, rw-fl fb- tions, not exceeding 4 inches. Projections extending into the fire separation distan*ce.shall have not less than one -hour fire -resistive construction on the underside. The above provisions shall not apply to walls which are perpendicular to the line used to determine the fire separa tion distance. Exception: Tool and storage sheds, playhouses and simiil�r structures exempted from permits by R105.2 are not re- quired to provide wall protection based on location on1he lot. Projections beyond the exterior wall shall not. extend over the lot line. R302.2 Openings. Openings shall not be permitted in the exte- rior wall. of a dwelling or accessory building with a fire separa- tion distance less than 1 feet (914 mm). This distance shall be measured perpendicular to the line used to determine the fire separation distance. Exceptions� 1. Openings shall be permitted in walls that are p6rpen- dicular to the line used to determine the fire separation distance. 2. Foundation vents installed in compliance with this code are permitted. R302.3 Penetrations. Penetrations located in the exterior wall of a dwelling with a fire separation distance less than 3 feet (914 mm) shall be protected in accordance.with.Section R317:.3. Exception: Penetrations shall be permitted in walls: that are, perpendicular to the line used to determine the fire sepata-� tion distance. SECTION R303 LIGHT, VENTILATION AND HEATING R303.1 Habitable rooms. All habitable rooms shall bepto- vided with aggregate glazing area of not less than 8 percent of 44 2003 INTERNATIONAL RESIDENTIAL CODEQ1 BUILDING PLANNING the floor area of such rooms. Natural ventilation shall be through windows, doors, louvers or other approved openings to the outdoor air. Such openings shall be provided with ready ac- cess or shall otherwise be readily controllable by the buildifi� occupants. The minimum openable area to the outdoors shall be 4 percent of the floor area being ventilated. Exceptions: 1. The glazed areas need not be openable where the open-ing is not required by Section R310 and an ap- proved mechanical ventilation system is provided ca- pable of producing 0.35 air change per hour in ' the room or a whole -house mechanical ventilation system is installed capable of supplying outdoor ventilation air of 15 cubic feet per minute (cfm) (7.08 L/s) per oc- cupant computed on the basis of two occupants for the first bedroorn and one occupant for each additional bedroom. 2. The glazed areas need not be provided in rooms where Exception I above is satisfied and artificial light is provided capable of producing an average illumina- tion of 6 footcandles (6.46 lux) over the area of the room at a height of 30 inches (762 mm) above the floor level. R303.2 Adjoining rooms. For the purpose of determining light and ventilation requirements, any room shall be consid- er6d as a portion of an adjoining room when at least one-half of the area of the common wall is open and unobstructed and pro- vides an opening of not less than one -tenth of the floor area of the interior room but not less than 25 square feet (2.32 m2). �Exception: Openings required for light and/or ventilation �shall be permitted to open into a thermally isolated sunroorn addition or patio cover, provided that there is an openable .area between the adjoining room and the sunroom addition or patio cover of not less than one -tenth of the floor area of the interior room but not less than 20 square feet (1.86 m2). The minimum openable area to the outdoors shall be based upon the total floor area being ventilated. R303.3 Bathrooms. Bathrooms, water closet compartments and other similar rooms shall be provided with aggregate glaz- ing area in windows of not less than 3 square feet (0.279 m2), one-half of which must be openable. Exception: The glazed areas shall not be required where ar- tificial light and a mechanical ventilation system are pro- vided. The minimum ventilation rates shall be 50 cfm (23.6 Us) for intermittent ventilation or 20 cfm (9.4 L/s) for con- tinuous ventilation. Ventilation air from the spare shall be exhausted directly to the outside. R303.4 Opening location. R303.4.1 Intake openings. Mechanical and gravity outside air intake openings shall be located a minimum of 10 feet (3,048 mm) from any hazardous or noxious contaminant, such as vents, chimneys, plumbing vents, streets, alleys, parking lots and loading docks, except as otherwise speci- fied in this code. Where a source of contaminant is located within 10 feet (3048 mm) of an intake opening, such opening shall be located a minimum of 2 feet (610 mm) below the contaminant source. For the purpose of this section, the exhaust from dwelling units, toilet rooms, bathrooms and kitchens shall not be con- sidered as hazardous or noxious. R303.4.2 Exhaust openings. Outside exhaust openings shall be located so as not to create a nuisance. Exhaust air shall not be directed onto walkways. R303.5 Outside opening protection. Air exhaust and intake openings that terminate outdoors shall be protected with corro- sion -resistant screens, louvers or grilles having a minimum opening size of 1/4 inch (6.4 mm) And a maximum opening size of 1/2 inch (12.7 mm), in any dimension. Openings shall be pro- tected against local weather conditions. Outdoor air exhaust and intake openings shall meet the provisions for exterior wall opening protectives in accordance with this code. R303.6 Stairway illumination. All interior and exterior stair- ways shall be provided with a means to illuminate the stairs, in- cluding the landings and treads. Interior stairways shall be pro- vided with an artificial light source located in the immediate vicinity of each landing of the stairway. For interior stairs the artificial light sources shall be capable of illuminating treads and landings to levels not less than 1 foot -candies (11 lux) mea- sured at the center of treads and landings. Exterior stairways shall be provided with an artificial light source located in the immediate vicinity of the top landing of the stairway. Exterior -stairways providing access to a basement from the outside grade level shall be provided with an artificial light source lo- cated in the immediate vicinity of the bottom landing of the stairway. Exception: An artificial light source is not required at the top and bottom landing, provided an artificial light source is located directly over each stairway section. R303.6.1 Light activation. The control for activation of the required interior stairway lighting shall be accessible at the top and bottom of each stairway without traversing any steps. The illumination of exterior stairways shall be con- trolled from inside the dwelling unit. Exception: Lights that Are continuously illuminated or automatically controlled. R303.7 Required glazed openings. Required glazed openings shall open directly onto a street or public alley, or a yard or court located on the same lot as the building. R303.7.1 Roofed porches. Required glazed openings may face into a roofed porch.where the porchibuts a street, yard or court and the longer side of the porch is atleast 65 percent . open and unobstructed and the ceiling height is not less than 7 feet (2134 mm). R303.8 Required heating. When the winter design tempera- ture in Table R301.2(l) is below 60'F (16*C), every dwelling unit shall be provided with heating facilities capable of main- taining a minimum room temperature of 680.17(20"Qatapoint 3feet(914mm) above the floor and 2 feet (610 mm) from exte- rior walls in all habitable rooms at the design temperature.The 2003 INTERNATIONAL RESIDENTIAL CODE(D 45