20060620075907.pdfCitv of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: June 19, 2006 TO: Bruce O'Neill Dw.mick@verizon.net FROM: Jenny Readwin, Plans Examin* RE: Plan Check # 2006-0659 Project: 7418 169h PL SW Project Address: 7418 169h PL SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the above items to a Permit Coordinator. 1) Show location of exterior deck spiral stairs on the site plan. 2) Update sheet 5 spiral stair notes to reflect minimum IRC requirements. 3) Specify height of guardrail at top of stairs open to below. Also, guardrails are required to resist 200 psf and the in -fill components must resist 50 psf per Table R301.5. Note on plans. 4) Show how island sink will be vented through the roof or with a loop vent as permitted by UPC 909.0.Air admittance valves are not permitted unless first approved by the Building Official under and alternate method per UPC 301.2. 5) Specify minimum cfm rating of all exhaust fans on the floor plans. 6) Specify on the elevation views the grade slope away from the building. If minimum 6" within 10' is not possible or habitable or useable space is below grade, foundation drainage is required. Provide footing drain detail on foundation sections complying with R405.1 and show required drain locations on the foundation plan. 7) Geotech of Record to update page 9 Summary section of report to reflect Edmonds requirements and not City of Lynnwood or City of Seattle DPD. 8) Provide letter from Geotechnical Engineer of Record stating that they have reviewed the plans and that they are consistent with the report recommendations. 9) Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. soil cuts Temporary Shoring (if required) Foundation subgrade verification Retaining wall or Rockery placement Placement of fill Subsurface drainage installation 0 Temporary and final erosion control 10) See attached structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, P.S. PO Box 523 01alla, WA 98359 hoytieter@centurytel.net 2538574151 Fax 253 857 5759 To: JoAnne Zulauf City of Edmonds Edmonds, WA 98020 Re:Gerdes Residence 7418 169th Place SW Edmonds, WA 98020 Plan Review 4 06-227 Structure Area S.F. Lower Floor 2586 Main Floor 2611 Total 5197 Garage 815 Total 6012 Lower Floor Patio 441 Main Floor Deck 352 Wain Floor Porch 237 IGrand total 7112 Date: 6/2/06 EECE # EDM 06-24 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide, revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review Isfor Me structural only requirements of this project All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 5 FECE#:EDM 06-24 Gerdes Residence 06-227 STRUCTURAL COMMENTS General 1. EOR please justify a dead load of 15PSF used in the analysis for the roof dead load. The roof is using Concrete tiles and the dead load ranges from 9 to 14 PSF per Standard Hand book 4th addition states in TH catalog for residential common dead load. (V2plywood dead load = 1.5, Ceiling = 2 psf, 3ply trusses =1.5 psf, roofing 1.5 psf adds up to 15.5 psf and this is assume the lightest tile.) Note this does not include beam dead loads, insulations, etc that need to be accounted for in the lateral and gravity design. Submit break down of the dead loads to justify amount used in the lateral and gravity design and resubmit accordingly. IBC 1617.5.1 and IBC 1602.1 definition of dead load and 1605.3.1 2. EOR please justify the coefficient of friction used to resist sliding for the design of the retaining walls. The analysis uses different amounts for different height walls. Why does it change for the different height walls? Without a geotechnical report table 1804.2 shall be used. The coefficient per this table for 2000 psf shall be .25. Please resubmit retaining wall design or submit geotechnical report to justify the amount used in the analysis. IBC table 1804.2 IBC 1806.1 3. EOR please add a key plan to show which shear wall is to use where. The analysis state wall line 1, line 2, line A, etc but the grids are not shown on the drawing or in the analysis and without a key plan, I was unable to determine from the drawings which wall is reference in the analysis. Please submit this on the response in order to complete the review. IBC 106.3 Sheet A2 Structural Notes 4. Please modify notes to meet adopted code. The UBC is not the adopted code. The floor and roof diaphragm nailing state use LJBC. 5. Diaphragm Blocking Notes: Please adjust text in order to read note 3 and note 2. IBC 106.3 6. Please cross off general note that do not apply for this project. For example there are three different roofs to use. There is no way to complete the gravity check with out know which is going to be used. Please cross off all part of this job that does not apply when resubmitting. IBC 106.3 Page 3 of 5 EECE#.EDM 06-24 Gerdes Residence 06-227 Sheet A4 Main Floor Plan 7. Shearwall Schedule: Note 7 Code requires a single 3X member at abutting panel edges. Please modify accordingly. IBC table 2306.4.1 foot note h and i. 8. Shearwall Schedule: Note 3: Code requires a single 3X member at abutting panel edges. Please modify accordingly IBC 2305.3.10 Sheet A5 Lower Floor Plan 9. Shearwall Schedule: Note 7 Code requires a single 3X member at abutting panel edges. Please modify accordingly. IBC table 2306.4.1 foot note h and i. 10. Shearwall Schedule: Note 3: Code requires a single 3X member at abutting panel edges. Please modify accordingly IBC 2305.3. 10 Sheet A6 Foundation Plan 11. Please justify by analysis the typical wall footing at the deck will support the vertical loads. Check analysis show a lager footing is required at this location. EOR provide analysis to justify. ( Note this is supporting the 5-1/4XI 4 PSL) IBC 1804.1 Sheet A7 Main Floor Framing 12. EOR please provide analysis for the footing under the 5-1/4 X 14" PSL at the shop wall. Check analysis how the standard footing at the wall will exceed the allowable bearing pressure of 2000 psf Submit analysis to justify footing. IBC 1804.1 13. EOR please specify the size of the beam required at the 4x6 hip posts. I was unable to determine this from the drawings. IBC 106.1 14. EOR please specify the beam required to support the stair stringers. IBC 106.1 15. EOR please specify the required post that is required under beam mark MFB4. Based off the analysis it is supporting a reaction of 5 kips. Please add the required size under this beam. IBC 106.1 16. EOR please specify the number of studs required under beam mark MFB5. This is framed into shear walls and it is not clear what will be used here. There are no calculations for the post requirements in the submittal. Please add this when resubmitting. IBC 106.1 Page 4 of 5 EECE#:EDM 06-24 Gerdes Residence 06-227 17. Please specify on the drawing that the joist shall be nailed to the top of the PSL and into the top plate of the 2x member at the wide flange beam in order to provide bracing of the compression flange. The analysis assumed the compression part of the beam is continuous braced. NDS table 3.3.3 Sheet A8 Roof Framing 18. Please specify the required post under the TR32 truss. One side just states hanger but the other side will be supported by a post, studs. A single stud'Mll not support the load and a required connection is required to be specified. Please add this infon-nation to the drawings. Sheet A 10 Elevations 19. Please provide details for the construction and attachment of the deck stairs as shown. Currently there is nothing shown how this is going to be built to meet the building code. IBC 1604.8.3 Sheet Al I Sections 20. Please provide details for the attachment of the deck guard rail. Per sheet AIO the deck will be over 30 inches and details are required on the drawing to show how the required forces are being transferred. Please add this information including analysis to justify. IBC 1604.8.3 Sheet A 12 Details 21. Detail 9A: Please modify detail to match the IBC and not the LJBC. Notes states UBC but this is not the adopted code. 22. Please add shear wall schedule to clearly note what is required in the details shown on this sheet. This shall include the EN, SN, BE, FA, BN, FN requirements. IBC 106.1 Sheet A 13 Details 23. Detail 5: Please not a 90 degree hook for the stem steel into the footing. #5 will not be able to develop the strength unless a hook is added. Please add this to the drawings. R403.1 and ACI 12.2 24. Detail 6: Please not a 90 degree hook for the stem steel into the footing. 45 will not be able to develop the strength unless a hook is added. Please add this to the drawings. R403.1 and ACI 12.2 Page 5 of 5 EECE#:EDM 06-24 Gerdes Residence 06m227 25. Detail 5: Please note on the drawing the vertical steel placement of 2" is a hold dimension and shafl be placed at this locations. This is important for the steel to be placed here in order to transfer the required forces. ACI 10.3 26. Detail 6: Please note on the drawing the vertical steel placement of 2" is a hold dimension and shall be placed at this location. This is important for the steel to be placed here in order to transfer the required forces. ACI 10.3 27. Detail 4: Detail states the detail shall be for soil bearing pressure of 2500 psf but for this site the soil bearing pressure has been assumed to be 2000 psf. Please modify detail accordingly. (I believe this is just a typo in the detail however the drawings need to be modified). Z:) 28. Detail I and detail 2: Please modify detail to meet the adopted state building codes. The UBC is not the adopted code. The international building codes are the design codes that shall be used (Except the UPC and not the IPC is the only exception). This was adopted July 12004.19.27 RCW Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Pubfic Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (253) 857-4151 between 8:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT Theprojectat issued under building permit number 'Zco L to f2l requires special inspection and/or testing per IBC Chapter 17. The complete list of special inspections is attached to this document. BEFORE A PERIVHT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspe I ctor shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification When performing special inspections on site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis —meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: Description of daily inspections and tests made with applicable locations List of all non -conforming items Report on status of non -conforming items (resolved or unresolved) Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. 5. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L:\TEMP\BUIIDING\SpeciallnspectionAgreementIBC.doc 7/04 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in this report. B. Contractor Responsibilities 1. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection- Note, the items listed on the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at,the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Department ReTonsibilities 1. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors Shan be monitored by the City Building Inspector. Ilis/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions ofthis agreement. Owner Special Inspector General Contractor Date Date Date City Building Official Date L:\TEMP\BUILDYNG\Sp.eciallnspectionAgreementIBC.doc 7/04 SPECIAL INSPECTION AND TESTING SCHEDULE -72[/ MOJECT ADMESS REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: Coocrete Gnnftr Grout Mortar Aggmg-Ate Tests Reinforcimr Tests Mix Desipis Reinforcing Placement Bitch Plant Inspection Placm?. Cut Samples Pick -lip Samples. Compression Tests PRECAST/PRF,STRESSED CONCRETE: rl� rwm-itens r-re-jens UftddM AggrtgaiCksts Reinforcing Tens Tendon Tests Mix Desilms Reinforcing Placement Insm Placement Concrete Balching C0TW=EC P1aCCnXD1 X-M Tests MASONRY: Special Inspection Suessr�, Used Preliminary Acceptance Tests fMasonry Unijs� Wall Prisms) Subscqucni Tests (Mortar- Grout. Feld Wall Prisms) Placement Jospenion of Units ADDITIONAL INSTRUCTIONS OR OTHER TESTS AND INSPECTIONS: TESTINC-NS-CC1710N AGENCY - SPECtAL MS�� STRUCTURALSMELM'ELDING: Sample and Test flist specific members below) Shop Material Mentifvation Welding Inspection OShop D Field Ultrasonic Inspection OShop OField lhgb-strrngtb E"ting Inspection 0 Shop 0 Feld 0 A325 0 N Ox 0 F D A49D Metal Deck Welding Inspection Reinforcing Steel Welding hiNTwion Metal Scud Welding Inspm6on Concrex Insert Welding Inspection FIREPROOFING: — Placement Inspection — Density Tests — Thickness Tes4s — Inspect Barching INSLILA71NG CONCRETE- - Sample and Test — Placement Inspection — Unit Weights FILL MATERIAL: — Acceptance Tests — Placement Inspection — Field Density STRUCTURAL WOOD-- - Shen Wa4l Nailing Inspection — Inspection of Glu-lam Fab. — Inspection of Truss Joist Fab. — Sample and Test Components Fom completed by: Tide: Telephone No-- Date--