PLAN REVIEW.COMMENTS
BUILDING DIVISION
1-1 WIS911 (425) 711-0220
DATE: June 26, 2006
TO: Vince Norberg
-norbergfamily@yahoo.com
FROM: Jenny Readwin, Plans Exami
RE: Plan Check # 2006-0669
Project: Norkri SFR
Project Address: 239011046 Ave W.
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised
plans/documents (affected sheets only) with a written response to each of the above items to a
Permit Coordinator.
1) Show location of fireplace bump out on the site plan.
2) See attached structural comments from city consultant. Respond to each item in writing.
Eagle Eye Consulting Engineers, P.S.
PO Box 523
01alla, WA 98359
hoytjeter@centurytel.net
2538574151
Fax 253 857 5759
To: Theresa Umbaugh
City of Edmonds
Edmonds, WA 98020
Re: Norkri Corporation
23901 104' Ave West
Edmonds, WA 98020
Plan Review ff 06-243
Date: June 6 2006
EECE # EDM 06-27
Structure
Area S.F.
Main Floor
1315
Upper Floor
1379
Total
2694
Garage
460
Total
3154
Upper Floor Deck
76
Porch
253
Garage Door Landing
9
Prand total
3492
The above referenced project is in the process of plan review for compliance with
Edmonds ordinances and applicable codes. The following comments,
deficiencies/corrections must be addressed prior to completion of plans review and
subsequent issuance of permits.
Provide revised plans and calculations along with a written response to each of the items
listed below to facilitate a shorter back -check time.
SCOPE OF REVIEW
The scope of this review is for the architectural, structural, VMQC, and enerXv
requirements of this project.
All features were checked only to the extent allowed by the submittals provided. All
portions of this project are assumed to meet or will meet other departmental requirements,
conditions and concerns before permit approval.
Page 2 of 4
FECE#: EDM 06-27
Norkri Corporation
STRUCTURAL COMMENTS
Sheet I MAIN FLOOR PLAN:
1. Please specify the required column to support the glu-lam beam, including the
required connections. IBC 2304-9.7
2. The code requires a single 3X member for SW-3. Please modify accordingly. 113C
2305.3. 10 and IBC table 23 06.4.1 footnote i.
3. Engineer of Record (EOR), please specify the required connection of the 6X8
beam at the comer of the porch.
4. Please clarify section A/2. There is not a section cut A on this sheet. Please modify
accordingly.
4. Provide calculations to justify the 3-1/2X 11-7/8 Parallarn will support the loads.
This beam is supporting the shear wall above and with very little dead load from
the roof and floor and uplift forces will be applied on this member. The
compression flange of the beam is not supported so the un-braced length shall not
be continuously supported. Provide an analysis for this beam to justify it will
support the design loads. NDS 5.3.5 and ESR 4.3
Sheet 2 UPPER FLOOR PLAN:
6. Detail 1: Please specify the required boundary nailing on the drawings. I was
.unable to find where this was specified on the drawing
.,s. Please either point out
location or add to the drawings.
5. Please specify the required connections of the (2) 2x6 to the girder truss. The truss
manufacturer typically does not specify the required connections to columns. They
leave that up to the EOR. IBC 2304.9.7
8. . Sheet 3 FOUNDATION PLAN:
6. Provide an analysis that a footing is not required at the 6X8 beam at the comer
porch. It seems a footing is required at this location.
7. Provide calculations to justify the connection with 2 V2 diameter X 6" lag at the
post.
8. Provide framing requirements for an 18" X 24" crawl space access when joists are
spaced at 16" O/C. A detail for the framing is required to be specified.
Page 3 of 4
EECE4- EDM 06-27
Norkri Corporation
9. Provide an analysis for the Y2 masonry anchor attachment for the ledger to support
the deck framing. Without knowing the embedment; the end placement etc, there is
no way to check if the ledger will support the required loads. Also, please provide
the n1anufacturer of the anchors in order to check connections, �Am Al—
W'D FiC 04Y oP— &U2&&ACAt1-V-
10. Please specify the requiredjoist hangers to use to support the loads. All that is
called out is joist hangers. This is required to be added to the drawings in order to
check the capacity. The contractor should not be making this decision.
11. Please modify the raised shear wall. The code requires the height to be measured to
the top of the wall and not the opening height unless the design has been submitted
to transfer the forces around the opening and detail accordingly. Please modify.
IBC 2305.3.4
Shed 4 GENERAL SPECIFICATIONS:
15. Please reference the detail to the plan to show where each detail is required to be
used.
12. Deck Detail: The code requires the guard rail to resist a force of 200 pounds
applied in any directions and the components to resist 50 psf. Please modify detail
to meet this requirement. I13C 1607.7.1.1 IBC 1607.7.1.2
17. Deck Detail: Please specify the required connection of the IX4 lateral bracing
applied to the underside of the deck. Nothing is specified at this time on this detail.
13. Deck Detail: The frost line depth for the City of Edmonds as published in table
R301.2 is 18" and not 12" Modify detail to state 18" and not 12". Table R301.2
14. Brick Veneer: Please clarify where this detail applies for this house. The engineer
of record did not use the dead load for brick veneer when doing the lateral designs.
I assume this detail does not apply for this structure. If that is the case please cross
off or point out where this occurs.
15. Restrained Foundation Wall: Provide calculations for the restrained foundation
wall. A check of analysis shows # 4 grade 40 steel will not support the required
forces. Provide an analysis to justify. IBC 1806.1
21 - Intermediate Brg. Support: Provide analysis that the concrete nails and the toe
nailing will resist lateral forces as required per IBC 2304.9.7 R407.3
16. The code requires the vertical bars to have a standard 90 degree. The drawings
show straight bar embedments. Please modify all details to show the 90 degree
hook. R403.1.3
� . t I
Page 4 of 4
EECE#: EDM 06-27
Norkri Corporation
Additional corrections may be required following receipt of corrections and
additional information as requested.
Your plans are being reviewed concurrently with the Building Department, Fire
Department, Zoning Department and Public Works Engineering. Changes,
clarifications or additional corrections may be required subsequent to the Building
Department plan review when comments are received from the other concerned
departments.
Should you have any inquiries regarding this letter, please contact Hoyt Jeter at
(253) 857-4151 between 8:00 a.m. and 5:00 p.m.
By:
Hoyt Jeter, P.E.
President
CITY OF EDMONDS
SPECIAL INSPECTION A" TESTING AGREEMENT
The project at issued under building permit
number requires special inspection and/or testing per IBC Chapter 17. The
complete. list of special inspections is attached to this document.
BEFORE A PERIVHT CAN BE ISSUED: The owner and contractor and special inspector shall complete
this agreement and the attached structural test(s) and inspections schedule including the required
acknowledgements.
APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building
Official prior to performing any duties or inspections. Each special inspector shaH submit Statement of
Qualifications to the Building Official for review. Special inspectors shall display identification When
performing special inspections on site. Special inspection and testing shall meet the minimum requirements
of IBC Chapter 17 and the following:
A. Duties and Responsibilities of the Sped
Jal Inspector
1. Observe Work
The special inspector shall observe the site work for conformance with the approved (stamped) plans
and specifications and applicable workmanship provisions of the IBC. Architect or Engineer
reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be
performed on a continuous basis —meaning that the special inspector is on site at all times observing
the work requiring special inspection. Periodic inspections, if any, must have prior approval by the
City based on a separate written plan reviewed and approved by the Building Official and the
engineer or architect of record.
2. Report Non -conforming Items
The special inspector shall: bring non -conforming items to the immediate attention of the contractor
and note afl such items in the daily field report. Any item not resolved in a timely manner shal] be
immediate cause of the special inspector to notify the Building Official of the plan deviation, error,
change or omission. It shall also be the duty of the special inspector to promptly notify the engineer
or architect.
3. Complete Daily Reports
Each special inspector shall complete and sign both the special inspection record and the daily report
form for each day's inspection. These records shall remain at the jobsite with the contractor for
review by the City Building Inspector.
4. Furnish Weekly Reports
The special inspector or inspection agency shall furnish the City with weekly reports of tests and
inspections. The project engineer or architect, and others as designated shall also be copied on
reports. Weekly reports must include the following:
Description of daily inspections and tests made with applicable locations
List of all non -conforming items
Report on status of non -conforming items (resolved or unresolved)
Itemized changes authorized by the Architect, Engineer and City if not included in non-
conformance items.
S. Furnish Final Construction Report
The special inspector or inspection agency shall submit a final signed report to the City stating that
all items requiring special inspection and testing were fulfiRed and reported. And, to the best of
L:\TEMP\BUILDING\SpeciallnspectionAgreementIBC.doc 7/04
his/her knowledge the project is in conformance with the approved plans and specifications,
approved change orders and the applicable workmanship provisions of the IBC. Items not in
conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed
inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically
itemized in this reporL
B. Contractor Responsibilities
1. Notify the Special Inspector
It is the duty of the contractor to notify the special inspector when work is ready for special
inspection- Note, the items listed on the attached schedule and as noted on the approved plans and
specifications are required to have s ecial inspections. Adequate notice shall be provided by the
. p
contractor so that the special inspector has time to become familiar with the project.
2. Provide Access to Approved Plans
The contractor is responsible for providing the special inspector access to approved plans at -the
jobsite.
3. Retain Special Inspection Records
The contractor is responsible to retain at the jobsite all special inspection records submitted by the
special inspector. These records are to be provided to the City building inspector upon request.
C. City of Edmonds Building Department Responsibilities
1. Approve special inspectors or inspection agencies
The building department shall approve all special inspectors and special inspection requirements.
2. Monitor special inspection and approve weekly reports -
Work requiring special inspection and the performance of special inspectors shall be monitored by
the City Building Inspector. ffis/Her approval must be obtained prior to placement of concrete or
other similar activities in addition to that of the special inspector.
3. Issue Certificate of Occupancy
The Building Official may issue a Certificate of Occupancy after an weekly special inspection reports
including the final report have been submitted and accepted.
D. Owner Responsibilities
The project owner or the engineer or architect of record acting as the owner's agent shall fund
special inspection services.
F. Engineer or Architect of Record Responsibilities
The engineer or architect of record shall include special inspection requirements on the plans and
specifications.
ACKNOWLEDGEMENTS
I have read and agree to comply with the terms and conditions of this agreement.
Owner
Special Inspector
General Contractor
City Building Official
Date
Date
Date
Date
L:\TEMP\BUILDING\Special,lnspectionAgreementIBC.doc 7104
SPECIAL INSPECTION AND TESTING SCHEDULE
1;25qol
NAMt
/CxZ-F /7 ,
MOJECT ADDRESS
REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR:
Concmt Gnnfte Grmt mmur
Aggregate Tests
ReWorcint Tests
Mix Designs
Reinforcing placement
Batch Plant Inspection
Inspelct PlacinR
Cast Samples
11cl,
Tests
PRECAST/PRESTRESSED CONCRETE:
Aggregate Tests
Reinforcing Tests
TendonTests
Mix Desion
Reinforcing Placermpt
Insert placcmcni
Concrete Batching
Concrete PIACCIDeM
Installation Instpuion
Cam Samples
Tests
MASONRY
— Special IRSPCC60ft SUCSSCS Used
— Pmliminary Acceptancc Tests fMasonTv Units, Wall prisms)
— Subsequmt Tests (Mortar. Grout. Field Wall Prisms)
— Plaocoment Inspection of Uylits
BUB-DING PERMff NQ
TEnINGANSPECT70N AGENCY m SPECLILL MPECTM
STRUCTURAL STEELMELDING:
— Sample and Test j fiv specific members below)
— Shop MamTial Identification
— Welding hmpection 0 Shop 0 Field
Ultrasorac Inspection E) shop Elfidd
Higb-smmgth Bolting
I-Pecy— El Shop 0 Reld
DA325 El N E3X OF
DA490
— Metal Deck Welding Inspection
— Rcinfon:ing Stet) Welding Inspection
— Metal Stud Welding InspeaiDn
— Concrete Insev Welding Inspection
FIREPROOFING:
— Placement Inspection
— Density Tests
— Thickness Tests
— Inspect Bauching
INSULATING CONCRETE -
Sample and'Test
Placement Inspection
Unit Weights
FILL MATERIAL:
— Acceptance Tests
— Placcment Inspection
— Field Density
STRUCTURAL WOOD:
— Shear Wall NaiJing Inspection
— Inspection of Glu-lwn Fab,
— Inspection ofTruss Joist Fab,
ADDITIONAL INSTRUCTIONS OR OTHER TESTS Sample and Test Components