Loading...
20060628145259.pdfOV -0 .10 DATE: June 28, 2006 Citv of Edmonds PLAN "VIEW COMMENTS BUILDIIN�G DIVISION (425) 771-0220 TO: Steve Thompson svlthompson@veiizon.net FROM: Jenny Readwin, Plans Examin ArQ/ RE: Plan Check 4 2006-0732 Project: Thompson Deck Project Address: 920 8"' Ave S. During review of the above noted application, it was found that the following infonnation, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the above items to a Permit Coordinator. 1) Specify how deck will slope minimum 2% and where it slopes to (i.e. cricket). Provide section detail though this area. 2) Provide framing plan for lower deck to verify how all loads are being carried to bearing. 3) Engineer of Record to provide calculations to justify that the existing footings are adequate to carry additional loads (see attached field report from Geotech Consultants, Inc from original house construction 1997-2000 psf soil bearing). 4) Note on plan says hangers by Engineer and nothing is specified in the calculations. Engineer of Record to specify hangers as well as minimum structural member supporting hanger within the extenor wall. Aws DAILY FIELD REPORT OIEOTECHTRAVEL/PREP TIME JOB NUMBER CONSULTANTS, INC. � �� �: P'-- 01 G 9 1 -6 TIME ON SITE DATE 13256 NE 20di Street, Suite 16 P.O. Box 2054 TIME OFF SITE DAY OF WEEK Bellevue, WA 98005 Tacoma, WA 98401 1 -7 0(_) -�j E-- F" 206-747-5618 FAX 747-8561 206-627-5990 FAX 627-2114 1HOURSCHARGED WEATHER JOB LOCATION CLIENTIOWNER ch 7 0 GENERAL CONTRACTOR GENERAL CONTRACTOR'S SUPT. MILES PERMIT NUMBER GRADING CONTRACTOR GRADING FOREPERSON SITORS PAGE OF I- — -- I I I I -s Jc IA5 L-1 0 AL I-- cir %-) f-) 1) �j C) 0 IN E u- L/ f P,- A C r-- A, A P5 + J'�6 C 0'--� 1) 5 1 - I a'-) kC- por�:k' A 'ir,-- 0 1 -Z - z AC- 0 r::C-) C- A <10,1-35 ro�L r Oak 1A NEXT SITE VISIT: C- LAI COPY TO: SiGNAT��