DATE: June 28, 2006
Citv of Edmonds
PLAN "VIEW COMMENTS
BUILDIIN�G DIVISION
(425) 771-0220
TO: Steve Thompson
svlthompson@veiizon.net
FROM: Jenny Readwin, Plans Examin ArQ/
RE: Plan Check 4 2006-0732
Project: Thompson Deck
Project Address: 920 8"' Ave S.
During review of the above noted application, it was found that the following infonnation,
corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised
plans/documents (affected sheets only) with a written response to each of the above items to a
Permit Coordinator.
1) Specify how deck will slope minimum 2% and where it slopes to (i.e. cricket). Provide section
detail though this area.
2) Provide framing plan for lower deck to verify how all loads are being carried to bearing.
3) Engineer of Record to provide calculations to justify that the existing footings are adequate to
carry additional loads (see attached field report from Geotech Consultants, Inc from original
house construction 1997-2000 psf soil bearing).
4) Note on plan says hangers by Engineer and nothing is specified in the calculations. Engineer of
Record to specify hangers as well as minimum structural member supporting hanger within the
extenor wall.
Aws
DAILY FIELD REPORT
OIEOTECHTRAVEL/PREP TIME JOB NUMBER
CONSULTANTS, INC. � �� �: P'-- 01 G 9 1 -6
TIME ON SITE DATE
13256 NE 20di Street, Suite 16 P.O. Box 2054 TIME OFF SITE DAY OF WEEK
Bellevue, WA 98005 Tacoma, WA 98401 1 -7 0(_) -�j E-- F"
206-747-5618 FAX 747-8561 206-627-5990 FAX 627-2114 1HOURSCHARGED WEATHER
JOB LOCATION CLIENTIOWNER
ch 7 0
GENERAL CONTRACTOR GENERAL CONTRACTOR'S SUPT. MILES PERMIT NUMBER
GRADING CONTRACTOR GRADING FOREPERSON SITORS PAGE OF
I- — -- I I I I
-s Jc IA5 L-1 0 AL I-- cir %-) f-) 1) �j
C) 0 IN E u-
L/
f
P,- A C r-- A, A P5
+
J'�6 C 0'--� 1) 5 1 -
I a'-)
kC- por�:k' A 'ir,-- 0 1 -Z - z
AC- 0 r::C-) C- A <10,1-35
ro�L r
Oak
1A
NEXT SITE VISIT: C- LAI
COPY TO: SiGNAT��