Loading...
2006-0659_GerdesSFR-1.pdfOV ED -Afo CITY OF EDMONDS 121 5h Avenue North - Edmonds, WA 98020 Phone: 425.771.0220 - Fax: 425.771.0221 - Web: www.ci.edmonds.wa.us I so� DEVELOPMENT SERVICEs DEPARTMENT: PLANNING - ENGINEERING - BUILDING Plan Check #: I BLD-2006-0659 (First Review) Project Name: Art& Peggy Gerdes SFR ProjectAddress: 7418 169h Place SW — (RS-20/PRD- 19 8 6- 1) June 22, 2006 Bruce O'Neill Design Works Construction 17515-A 52 nd Avenue West Lynnwood WA 98037 Phone: 206.972.1664 / Fax: 425.742.6154 Dear Mr. O'Neill, I have reviewed the above building permit application for the Planning Division and it was found that the following information, corrections, or clarifications will need to be addressed before review can continue: I . SEPA ' : Thank you for providing the required SEPA documents with your submittal. You will receive a copy of the determination in the mail shortly. SEPA comments and appeals are scheduled to be received no later than July 7, 2006 for this proposal. 2. Hei2h : On the building plans, please show the Average Grade line. Please show that the ridgeline is less than or equal to 25-feet ftom this line (to scale). 3. Rockery: The rockery on the north side of the property appears to exceed the 3-foot height limit, as measured from the top of the wall to original grade. Please clarify (it's difficult to tell because the original grade is shown in 5-foot contours). 4. Critical Areas Determination: This site was reviewed in 2004 and a "waiver" was issued, indicating that no critical areas were found to be on or adjacent to the subject site (File CA- 2004-0144). However, during review and inspection of the subject site for State Environmental Policy Act (SEPA) review, it was found that the site slopes down from east to west at enough of a slope to qualify for both erosion hazard potential and landslide hazard potential. These are two types of critical areas, pursuant to Chapter 23.40 of the Edmonds Community Development Code (ECDC). The LIDAR map (enclosed) indicates that the general slope across the property is roughly 27%, while there are also slopes of 34% and 45% on the property, there is also a slope of 60% adjacent to the property. Study materials (geotechnical report) will be required with building permit review to ensure the safety of the proposed development. Please read item 95 (Geotechnical Report) below. Page I of 2 5. Geotechnical Report: The Geotechnical Engineer needs to state that they have reviewed the house and rockery plans that you have submitted for our review. Also, because this project proposes to 'alter' a critical area, please have the Geotechnical Engineer read ECDC 23.80.070.A.2 (Alterations of Critical Areas) and provide a 'hazards analysis' response to each of these items listed below. ECDC 23.80.070.A.2 states: Alterations of an erosion or landslide hazard area and/or buffer may only occur for activities for which a hazards analysis is submitted and certifies that: a. The development will not increase surface water discharge or sedimentation to adjacent properties beyond predevelopment conditions; b. The development will not decrease slope stability on adjacent properties; and c. Such alterations will not adversely impact other critical areas; Thank you for your cooperation. Please redline plans or submit three sets of revised plans/documents (affected sheets only) with a written response to each of the above items. Please make all submittals to the Development Services Permit Coordinator (JoAnne Zulauf) Monday through Friday, 9am to noon or Ipm to 4pm. If you have any questions, please do not hesitate to contact me at (425) 771-0220, extension 1778. 1 look forward to working with you on this project. Sincerely, CITY OF EDMONDS Gina Coccia, Planner Page 2 of 2 0 00 .4 VAIP I inch equals 40feet LIDARIAeriallParcel Map Approximate 2-foot Contours Planning Division (GC) 121 5th Ave N, Edmonds WA 98020 425 77 1 0220 Art & Peggy Gerdes 7418 169th PI SW C A - 2 0 0 4 - 0 14 4 VicinitylLIDAR Map 0612 112006 Ib IRK 3- ]PAIS =*AWN 14