Loading...
20060705155813.pdfCity of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: July 5, 2006 TO: Paul Stromme Fax (206-526-2773 FROM: Jenny Readwin, Plans Examinllk RE: Plan Check # 2006-0773 Project: Young Fence Project Address: 206 Sunset Ave During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Specify height of wrought iron fence along the South and West property lines on top of the existing retaining wall. 2) On section X-X show location of property line in relation to existing "I beams". Also specify what "I beams" are used for (i.e. existing shoring wall/soldier piles?). If the "I beams" are not located on the subject property, Wrlitten authorization from the adjacent property owner is required prior to pen -nit issuance. 3) Proposed 6' wood fence does not meet conventional construction. Provide wind load calculations stamped and signed by a Washington State Licensed Professional Engineer including connection to existing steel I beams. 4) Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. 0 Field Welding CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT Theprojectat- -2_o(4,_ 4&k6 o,,e� o_A�-e� issued under building permit number RQ0U- 07-7 3 requires special inspection and/or testing per IBC Chapter 17. The complete list of special inspections is attached to this document. BEFORE A PER.NHT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shaH submit Statement of Qualifications to the Budding Official for review. Special inspectors shall display identification When performing special inspections on site.. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis —meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall he immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the, City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: • Description of daily inspections and tests made with applicable locations • List of all non -conforming items Report on status of non -conforming items (resolved or unresolved) Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. 5. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L:\TEMP\BUILDING\SpeciallnspectionAgreementIBC.doc 7/04 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in this report. B. Contractor Responsibilities 1. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at -the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to he provided to the City building inspector upon request. C. City of Edmonds Buildinv_ Department Responsibilities 1. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. Ms/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been subniitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Enizineer or Architect of Record ResRonsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner Special Inspector General Contractor City Building Official Date Date Date Date L:\TEMP\BIALDYNG\SpeciallnspectionAgreementIRC-doc 7/04 SPECIAL INSPECTION AND TESTING SCHEDULE vmncl 2-to (e - 6 7 73 I PROJECT NAME BUU-DUIJG PERMIT NQ GuAset- PROJECT ADDRESS MON AGENCY "SPECIAL WSPEC7MMU REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: STRUCTURAL STEELIWELDING: CoDcrvft GwAte Grout Mortar Sample and Test (list Specific members below) Aggregate Tests Shop Material Identification Reinforcing Tests X"i ng Inspection OSh-p /<F.W Ma Designs — Ultrasonic Inspection 0 Shop 0 Field Reinforcin't Placernent — ffigh-stJength Bolting Batch Plant lrts�tion Inspection 0sh Id Inspect Placing El A325 C-Lu Sarnples El A49D [IN OX 0 F Pick-up Samples — Metal Deck Welding Inspection Compression Tems — Reinforcing Steel Welding Inspection PRECAST/PRESTRESSED CONCRETE: - Metal Stud Welding Inspection — Concrete Insert Welding Inspection PUM Pbst-Tens Pre-Ttias Cladding AggrrFatc-fcsts Placement Inspection Tendon Tests — Density Tests Mix Dcsiens — Thickness Tests Reinforcing Placement — Inspect Batching Insert Placement Concrete Ratching INSULATING CONCRETE - Concrete Placement — Sample and Test Installalion InscKlion — Placement Inspection C�w Samples — Unit Weights Pick --up Samples FILL MATERIAL: MASONRY: - Acceptance Tests — Placement Inspection — Special Inspection Stresses Used — FmJd Density — Preliminary Acceptance Tests (Masonry Units. Wail Prisms) — Subscquent Tests (Mortar Grout. Field Wall Prisms) STRUCTURAL WOOD: — P`120�-Dt Inspection of Units — Shear Wall Nailing Inspection — Inspection of Glu-Jarn F�b. Inspection of Truss Joist Fab. ADDITIONAL INSTRUCTIONS OR OTHER TESTS Sample and Test Componcrits AND INSPECTIONS: F-r- completed br- Telephone No.: — Title: Date: