20060706084413.pdfED
DATE: July 6, 2006
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
TO: Tom Murray
Fax (425)774-4993
FROM: Jenny Readwin, Plans Examio,
RE: Plan Check # 2006-0737
Project: Moseley Addition
Project Address: 10221240"' PI SW
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised
plans/documents (affected sheets only) with a written response to each of the items below to a
Permit Coordinator.
1) Specify if new foundation will be poured monolithically. If not vertical rebar is required at 4'
o.c. and is required to have a standard hook per R403.1.3,
2) For seismic design category D2 anchor bolt plate washers are required to be minimum Yx 3" x
1/4". Revise plans or provide calculations stamped and signed by a Washington State Licensed
Engineer.
3) Provide calculations for ledger attachment (anchor bolt size and spacing and minimum
embedment) to existing foundation wall. How will they be installed (i.e. epoxy)? Special
inspections are required for epoxy installation.
4) Special inspections are required for the following. Complete the enclosed special inspection
agreement signed by the owner, the general contractor and the special inspector and submit to
the City for approval prior to issuance. A separate form is required for each separate special
inspector.
0 Clearing/grading/site preparation
* Soil bearing
e Placement of fill and compaction
* General site monitoring during wet weather construction
a Subsurface drainage installation including footing drains
a Temporary and final erosion control
* Epoxy bolts
CITY OF EDMONDS
SPECIAL INSPECTION AND TESTING AGREEMENT
The project at issued under building permit
number requires special inspection and/or testing per IEBC Chapter 17. The
complete list of special inspections is attached to this document.
BEFORE A PERNUT CAN BE ISSUED: The owner and contractor and special inspector shall complete
this agreement and the attached structural test(s) and inspections schedule including the required
ack,nowledgements.
APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building
Official prior to performing any duties or inspections. Each special inspector shall submit Statement of
Qualifications to the Building Official for review. Special inspectors shall display identification When
performing special inspections on site. Special inspection and testing shall meet the minimum requirements
of YRC Chapter 17 and the following:
A. Duties and Responsibilities of the Special Inspector
I . Observe Work
The special inspector shall observe the site work for conformance with the approved (stamped) plans
and specifications and applicable workmanship provisions of the IBC. Architect or Engineer
reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be
performed on a continuous basis —meaning that the special inspector is on site at all times observing
the work requiring special inspection. Periodic inspections, if any, must have prior approval by the
City based on a separate written plan reviewed and approved by the Building Official and the
engineer or architect of record.
2. Report Non -conforming Items
The special inspector shall bring non -conforming items to the immediate attention of the contractor
and note all such items in the daily field report. Any item not resolved in a timely manner shall be
immediate cause of the special inspector to notify the Building Official of the plan deviation, error,
change or omission. It shall also be the duty of the special inspector to promptly notify the engineer
or architect.
3. Complete Daily Reports
Each special inspector shall complete and sign both the special inspection record. and the daily report
form for each day's inspection. These records shall remain at the jobsite with the contractor for
review by the City Building Inspector.
4. Furnish Weekly Reports
The special inspector or inspection agency shall furnish the City with weekly reports of tests and
inspections. The project engineer or architect, and others as designated shall also be copied on
reports. Weekly reports must include the following:
0 Description of daily inspections and tests made with applicable locations
0 List of all non -conforming items
0 Report on status of non -conforming items (resolved or unresolved)
0 Itemized changes authorized by the Architect, Engineer and City if not included in non-
conformance items.
5. Furnish Final Construction Report
The special inspector or inspection agency shall submit a final signed report to the City stating that
all items requiring special inspection and testing were fulfilled and reported. And, to the best of
L-\TEMP\BUILDING\SpeciallnspectionAgreemexitIBC.doe 7/04
his/her knowledge the project is in conformance with the approved plans and specifications,
approved change orders and the applicable workmanship provisions of the IBC. Items not in
conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed
inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically
itemized in this report.
B. Contractor Responsibilities
1. Notify the Special Inspector
It is the duty of the contractor to notify the special inspector when work is ready for special
inspection. Note, the items listed on the attached schedule and as noted on the approved plans and
specifications are required to have special inspections. Adequate notice shall be provided by the
contractor so that the special inspector has time to become familiar with the project.
2. Provide Access to Approved Plans
The contractor is responsible for providing the special inspector access to approved plans at,tbe
jobsite.
3. Retain Special Inspection Records
The contractor is responsible to retain at the j obsite all special inspection records submitted by the
special inspector. These records are to be provided to the City building inspector upon request.
C. City of Edmonds Building Department Responsibilities
1. Approve special inspectors or inspection agencies
The building department shall approve all special inspectors and special inspection requirements.
2. Monitor special inspection and approve weekly reports
Work requiring special inspection and the performance of special inspectors Shan be monitored by
the City Building Inspector. Ifis/Her approval must be obtained prior to placement of concrete or
other similar activities in addition to that of the special inspector.
3. Issue Certificate of Occupancy
The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports
including the final report have been submitted and accepted.
D. Owner Responsibilities
The project owner or the engineer or architect of record acting as the owner's agent shall fund
special inspection services.
E. Eneineer or Architect of Record Responsibilities
The engineer or architect of record shall include special inspection requirements on the plains and
specifications.
ACKNOWLEDGEMENTS,
I have read and agree to comply with the terms and conditions of this agreement.
Owner
Special Inspector
General Contractor
City Building Official
Date
Date
Date
Date
L:\TEMP\BUILI)ING\SpeciallnspectionAgreernentIBC.doc 7/04
SPECIAL INSPECTION AND TESTING SCHEDULE
PROJECT ADDRESS TESTR4G;R4S?EC-n0N AGENCY SPECIAL INSPEC70R
REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: STRUCTURAL STEEIJWELDING:
CoDcmite Gunite Grout Mm-tar — Sample and Test (list specific n=bcrs below)
Aggregailt Tests — Shop Material Identification
Reiffocig Tests — Welding Inspection 0 Sbop, 0 Field
Mix Drsiyns — Ultrasonic Inspection osbop oFew
Reinforciny Placement — Fligh-sumgth Bolting
Batch Plant hispecuon, Inspection 0 Shop Ofield
Inspect Placing D A325 CIN OX D F
Cam Samples El A490
7 Pick-up Samples — Metal Deck Welding Inspection
Compression Tests
.P;P;17 .1 — Reinforcing Steel Welding InsTection
PRECASTIPRESTRESSED CONCRETE: Metal Stud Welding Inspection
— Concrele Insert Welding Inspection
Files POSt-TrYIS Pre-7ens CladAing
Aggrrgatc-Ttsis FIRE?ROOFING:
Reinforcing Tests Placement Inspection
Tendon Tests DensityrcsLs
Mix DC5i2Y)5 Tbickness Tests
Reinforcing Placement Inspect Batching
Itism Placement
Concrete —Datchinle INSULATING CONCRETE--
f i Concrcle Placemen I — Sample and Test
Installation lnsqxtjon — Placement I
cast Samples
— Unit Weights
Pick-up Saxnplrs�
Compression Ttsis
FILLMATERIAL:
MASONRY-
— Acceptance Tests
— Placenwnt Inspection
— Special Inspection Stresses Used
— Field Density
— Preliminary Acceptance Tens (Masonry Units- Wall Prisms)
— Subsequent Tests (Mortar, Grout. Field Wall Prisms)
STRUCTURAL WOOD:
— Placement Inspection of Units
— Sbear Wall Nailing Inspection
— Inspection of Glu-1arn hb-
- Inspection of Tt uss loin Fab.
ADDITIONAL INSTRUCTIONS OR OTHER TESTS
— Samplee and Test Components
AND INSPECTIONS -
Form completed by- T41c:
Telephone No.: Dwt: