Loading...
20060706161456.pdf0 ED DATE: July 6, 2006 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Ronald T DenAdel Fax (425)670-3359 FROM: Jenny Readwin, Plans Exa* RE: Plan Check # 2006-0694 Project: S and K J_V SFR Project Address: 17037 76' Ave W. During review of the above noted application, it was found that the following information corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Label all decks and covered patios/porches on the site plan. 2) A handrail is required for 4 or more risers, Note handrail requirement on the site plan for exterior stairs. 3) Basement recreation room has a closet and is therefore considered a sleeping room and must have a complying egress window and smoke detector. Note on plans. 4) Specify height of guardrail (1/2 wall) open to below. Also, guardrails are required to resist 200 psf and the in -fill components must resist 50 psf per Table R301.5. Note on plans. 5) Specify all insulation values on the section views on page 6. R-25 is specified for the floor above the garage and R-3 0 is the minimum. Also show R-3 8 ceiling, R-21 wall and R- 10 slab. For wall along the foundation if located on the interior R-21 minimum is required and if place on the exterior of the wall R- 10 minimum is required. 6) Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. • Soil bearing verification • Placement of fill and compaction • General site monitoring during wet weather construction • Temporary and final erosion control • Foundation drainage • Retaining wall/rockery placement 7) See attached structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, P.S. PO Box 523 01alla, WA 98359 hoAeter@centurytel.net 2538574151 Fax 253 857 5759 To: JoAnne Zulauf City of Edmonds Edmonds, WA 98020 Re: S & K Joint Ventures 17037 76th Ave West Edmonds, WA 98020 Plan Review # 06-271 Structure Area S.F. Lower Floor 1278 Main Floor 1813 I�pper Floor 1346 Total 4437 Garage 849 Total 5285 Deck first floor ABVG 30 Inches 272 Upper Floor Deck 72 Grand total 5629 June 23, 2006 EECE # EDM 06-32 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the structural requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 3 EECE#: EDM 06-32 06-271 STRUCTURAL COMWNTS General 1. Please submit a design analysis for the walls that include the seismic surcharge as recommended in the geotechnical report. The report states a 4H active and 8H at rest load on the wall. The design analysis submitted has not addressed this as stated in the report. IBC 1802.2.7 2. Please submit a design analysis for restrained wall with a pressure of 55 pcf as recommended in the geotechnical report. IBC 1802 Sheet 4 UPPER FLOOR PLAN: 3. Please specify the required columns and connections to support the girder truss. 4. The double studs appear not to be able to support the U2-3-1/8X 10- 1/2 beam at the bathroom. It is required to support a force of 3.8 kips. Provide calculations to justify or modify accordingly. 5. Please specify the required connection of the 4X4 post to the 4XI2 beams. 6— Engineer of Record (EOR), please specify a 4x6 post at the other side of the door opening at the master room. The 4x6 is only called out on one side. The beam mark is U4. Sheet 5 FOUNDATION PLAN: 7. Please cross off the retaining wall requirements for 35 pef pressure. 'Me report state the pressure shall be 40 pcf, 8. EOR, please specify the required reinforcement of the 28X28Xl4footing. 9. EOR, please specify the required reinforcement for 24X24XI2 at the Bonus Room and the stairs. 10. Please cross off the requirements for the Oregon state code to assure the contractor does not use the wrong detail on this site. 11. Please specify the required column and attachment to support the 5 -1/8X 19-1/2 at the garage wall. A F4 footing is called out but not the column or the required connections. Please add this information to the drawings. 12. Please specify the reinforcement for the 20X20X 10 footing at the patio. -Page 3 of 3 EECE#: EDM 06-32 06-271 Sheet G GENERAL NOTES: 11 Please cross off items that are for the Oregon state code. This structure is being built in Washington and to avoid confusion and mistakes in the field please cross off items that do not apply to this structure. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (253) 857-4151 between 8-.00 a.m. and 5:00 p.m.. By: Hoyt Jeter, P.E. President CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT The project at 1-7o3-/ i& 'A av . �-e to issued under building permit number 2vo (0 — 6 to 94 . requires special inspection and/or testing per IBC Chapter 17. The complete list of special inspections is attached to this document. BEFORE A PERIVHT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required ack.nowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification When performing special inspections on site. Special inspection and testing shall meet the minimum requirements of 11BC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector .1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis —meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily fixeld report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: Description of daily inspections and tests made with applicable locations List of all non -conforming items Report on status of non -conforming items (resolved or unresolved) Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. 5. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulifilled and reported. And, to the best of L:\TEMP\BUIL,DING\SpeciallnspecfionAgreementIBC.doe 7/04 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in this report. B. Contractor Responsibilities 1. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the. attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at -the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Bufldinp_ Department Responsibilities 1. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. His/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Eneineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner Date Special Inspector Date Ge neral Contractor Date City Building Official Date L:�TEMP\13UILDING\SpeciallnspectionAgreementIBC.doc 7/04 SPE L INSPECTION AND TESTING SCHEDULE CIA 16<j v ­7 170 vr� av 3 7 momc""m __ MOYECTADDRESS REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: Concreft GuAfte Grwt mortm Tests v Tests I Mix Desirns Reinforcing Phicement Batch Plant hisoction cast Tests PRECAST/PRESTRESSED CONCRETE: Filles Pom-Tens P"-Tms Cladding Reinforcirip Tests Tendon i;�; Mix Desijzns Reinforcing Plac ment Insen Placemerit Co=ctc Batchiny Concrcie Placement Installation Inscjxtion_ Cast Samp)es Pick-up Samples Compression Tests MASONRY. — Special Inspection Suesses Used — Preliminary Acccptancc Tests (Masc>nry Units. Wail Prisms) — Subsequent Tests (Monar. Grout. FrJd Wall Prisms) — Placement Inspection of Units ADDITIONAL INSTRUCTIONS OR OTHER TESTS AND INSPECTIONS: "So AGU4CY M SPMAL INSPEOM STRUCTURALSTEELWELDING, - Sarnple and Test (fist specific memben below) — Shop Mate7ial Identifimtion — Welding Inspection 0 shop 0 FXW — Ukwonic Invoction 11 Shop E) FmW — Higb-strength Bolting Inspm ' non 0 Shop 0 FeJd E) A325 C1 N 0 X 0 F 0 A490 — Metal Deck WtIding Inspection — Reinforcing Steel Wielding Inspection — Metal Stud Welding Inspection — Concrete Insen Welding Inspection FIREPROOFING: - Placement Inspection — Density Tests — Thickness Tesis — Inspect Batching INSULATING CONCRETE: —Sample and Test — Place=nl Inspection — Unit Weights FILL MATERIAL: — Acceptance Tests — Placerrient Inspection — Field Density STRUCTURAL WOOD: — Shear Wall Nailing Inspection — Inspection of GJu-Jam F;ib� — Inspection of Truss)oist Fab, — Sample and Test Components Form completed by: Title: Telephone No,: Date: