Loading...
20060710154413 lehn (bld200605430)rev3.pdfW4, City of Edmonds 1215 TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edrnonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering Plan Review Comments Plan Check #: 20060543 Date: 10 Jul 06 Project Name/Address: Phil Lehn; 16234 72 rid Ave W Contact Person/Address/Fax: : Phil Lehn fax/email: lehndesign@comcast.net Reviewer: Lyle Chrisman, Engineering Program Manager Division: Engineering The subject application has been reviewed but cannot be completed until the following items have been addressed/corrected. Please resubmit 3 sets of revised drawings to a Development Services Permit Coordinator. Sheet A.27 1. Rockeries that support fill can not exceed 3' in height. Please adjust the rockery elevations accordingly. Rockery Detail 2. Indicate 3' max height for rockery in fill situation. 3. Change 4" drain pipe to 6" per City std detail. Sheet C2 4. The minimum driveway width should be 12'. Please adjust the widths accordingly. Reverify the grade of the driveway. Does the slope change from what you are requesting? 5. Show where the water meters for lots 2 and 2A will be located. If meters are located in driving area, the meter box must have a traffic rated lid. 6. In reviewing the driveway grades to respond to your request for a driveway waiver. Sheet C3 7. Since Cb D-2 is private, it cannot be placed within the City right-of-way. Suggest installing a trough drain across the width of the driveway (at both ends) along the property line. The trough drain at the north end can be perpendicular to the driveway and will also eliminate a dip in the driveway. 8. The water service location on this sheet does not match the location on the architectural plans. DATE E-mailed 10 Jul 06 (Attach fax transmittal) PAGE I OF 3— S:\ENGR\PRfVATE DEVELOMENT PR0JECTS\REVLEW\SFR\2006 SFR\20060543 Lehn review 3 (lot 3).doc If you wish to redline the corrections, please make an appointment with the permit coordinator so she can have the drawing available for you. If you have any questions, please contact me. DATE E-mailed-10 Jul 06 (Attach fax transmittal) PAGE 1 OF I S:\ENGR\PRIVATE DEVELOMENT PROJECTS\REVIEW\SFR\2006 SFR\20060543 I--,ehn review 3 (lot 3).doc