Loading...
20060710162418.pdf0' ED DATE: July 10, 2006 Citv of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Lance Farr fffish@hotmaii.com FROM: Jenny Readwin, Plans Exam RE: Plan Check # 2006-0790 Project: Deck ProjectAddress: 8941 179thpISW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Show topography on the site plan. 2) Site plan specifies new deck but according to the plans the entire deck is not being replaced. Clarify existing and proposed deck on the site plan. 3) Show bottom of footing in relation to the slope per IRC R403.1.7.2 4) Clarify that there will be a new ledger at the house side of the deck. Plans specify rim joists. 5) Clarify on the plans if there is a post and footing on each side of the beam splice. If not, this is non -conventional and calculations are required stamped and signed by a Washington State Licensed Professional Engineer. 6) At angle of proposed deck a double 2xlO is required to support those joists. Specify on plans. 7) Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. * Soil Bearing CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT The project at 19N I LZq" a__ �It� I issued under building permit number 2QN2 — 0270 requires special inspection and/or testing per IBC Chapter 17. The complete list of special inspections is attached to this document. BEFORE A PERAHT CAN BE ISSUED. The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification when performing special inspections on site. Special inspection and testing shall meet the minimum requirements of 11BC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis —meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: * Description of daffy inspections and tests made with applicable locations * List of all non-conforniting items I Report on status of non -conforming items (resolved or unresolved) Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. 5. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L:\TEMP\BUILDING\SpeciallnspecfionAgreementIBC.doc 7/04 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in this report. B. Contractor Responsibilities 1. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar Ynth the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at -.the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Doartment Responsibilities Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. Ilis/fler approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Enp_ineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner Special Inspector General Contractor City Building Official Date Date Date Date L:\TEMP\BUILDING\SpeciallnspectionAgTeementJBC.doc 7/04 SPg9IAL INSPECTION AND TESTING SCHEDULE 9 +( MMCT RAW q 1-76? MOYELTADDRESS REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: Coacrvte Guufte Grout Mffl-tar Aggregare Tests RcinforciDy Tests Mix Designs Reixiforcing P Fit Ba Ich Plant Inspection In-Tc" placks! Cost Sarnples ))Cs Tests PRECAST/PRESTRESSED CONCRETE: Aggmgwe-resis Reinforcing Tests Termlon Tests MiX DCSiM Reinforcing Placement Insert Placemcnt Concrete Ralching CorwreLe fthcrmew InstzIlation Instperion Pick-up Samp es Compression Tests MASONRY — Special Insprulion Stresses Used — Preliminary Acceptance Tests iMa&Dary Units. Wall Prisms) — Subsequent Tests (Mortar. Grout. Field Wall Prisms) — Pt3ceawnt Inspection of Units ADDITIONAL INSTRUCTIONS OR OTHER TESTS M)62 0 ZZeD BUXD04G PERMff f4o� TEYT1WGMJ5PEC-n0N AG� - SPU3AL INSPECRW STRUCTURAL STEWWELDING: — Sampk aridrest f list specific mmbm below) — Shop Material Mcntificatim — Wfidmt hISPemOn 0 Shop 0 Field — Ultrasonic Inspection 0 Sbop 0 Field — ffigix-surngt1i Bolting 11"spec'non OSI)cp 0 Field El A325 EIN a x 0 F El A490 — Metal Dock WtIding Inspection — Reinforcing Steel Welding Inspection — Metal Stud Welding Inspection — Concrete Insert Welding Inspwion FIREtROMNIG: — Placement Inspection — Density Tests — Thickmcssiresis — Inspect Batching INSULATING CONCRETE: — Sample and Test — Haccuienr Inspection — Unit Weigbis FILL MATERIAL: — Acceptance Tests — Pjacemem Inspection — Field Density STRUCTURAL WOOD: Shem WA Nailing Inspection Inspection Of Glkl4aln F:ab- Inspe0ion of Truss Joist Fab. Sample and Tea Components Form completed br Title-. Telq*wne No.- Date: