20060712075633.pdfCity of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425).771-02N DATE: July 12, 2006 TO Ross Woods FAX: 206-374-0415 FROM: Ann Bullis, Assistant Building Official RE: Plan Check # 2006-0695 Project: Point Edwards — Rough Grading for Buildings 6, 7, and Amenities Project Address: 21 & 31 & 41 Pine Street During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please provide written responses to the comments below and resubmit 3 sets of revised plans/documents to Marie Harrison, Permit Coordinator. 1. Submit 3 sets of engineered shoring plans and calculations for review. 2. Provide 3 copies of all geotechnical soils reports, supplemental reports and letters relating to the area to be graded and shored. 3. Provide a letter from the geotechnical engineer of record that he has reviewed the proposed shoring plans and that they meet the recommendations in their report. 4. See Engineering Division comments for this permit application regarding rockenies supporting fill, and retaining wall footings encroaching into the water main easement. 5. Complete the enclosed Special Inspection Agreement for geotechnical special inspections required for this project, have the owner, general contractor and geotechnical special inspector sign the form and return prior to permit issuance. a. Excavation and grading b. Placement of fill and compaction c. Shoring installation and monitoring d. Rockery/Retaining wall construction, including drainage e. General site momitoning including cut slopes CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREENMNT The project at issued under building permit number requires special inspection and/or testing per IBC Chapter 17. The complete list of special inspections is attached to this document. BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification When performing special inspections on site. Special inspection and testing shall meet the minimum requirements of 1BC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis —meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the specialmspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: Description of daily inspections and tests made with applicable locations List of all non -conforming items Report on status of non -conforming items (resolved or unresolved) Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. S. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L:\TEMP\BUILDING\SpeciallnspectionAgreement]BC.doc 7/04 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in this report. B. Contractor Responsibilities 1. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached schedule and as noted on the approved plains and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at.the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Buildin Devartment Responsibilities 1. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance Of Special inspectors shall be monitored by the City Building Inspector. His/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after an weekly special inspection reports including the final report have been submitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner',s agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner Special Inspector General Contractor City Building Official Date Date Date Date L:\TEMP\BUILDING\SpeciallnspectionAgreementIBC.doc 7/04 SPECIAL INSPECTION AND TESTING SCHEDULE MWECYNAME BUn_Dft';G PERMU NO- MOJE" ADDRESS TESTINOWSPECTION AGO"Cy Cc SPECIAL INSPECMR REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR- STRUCTURAL STEEL/WELDING: Concr"t Gunite Grout Mortar — Sairipte and Test flist Specific mmbcn bc�) Aggrrgwe Tests — Shop Matmial Identification ReiafcTcinjz Tests — welding Inspection 0 shop D Fxm Mix Designs — Ultrasonic inspection 13 Shop D Field Reinforcing Placernent — High-strengib Bolting Bach Plant Inspection Inspection OShOp 0 Field Inspect Piacbe 0 A325 D D .Cast Samples DA490 Pick-up Samples Metal Deck Welding Inspection Compression Tcsis Reinforcing Steel Welding Inspection PRECAST/PRESTRESSED CONCRETE: - Metal Stud Welding Inspection — Concrete Insert Welding Inspection Piles P061-Tens Pre-Tem Cladding AggTrgwcTcstS FIREPROOFING: Reinforcing Tests — Ptwcnxw Inspection Tendon Tests — Density Tests Mix Designs — Thickness Tests Rcinfomiiig Placement — Inspect Batching Insert Placerricni Concrete 1321ching INSULATING CONCRETE- conc=lc Placement — Sample and Tem Ins;tallation Iftsepcoon — Placement Inspection Casr SaMPIC5 — Unit Weights pick-up Samples --------------- Compression Tests FILLMATERIAL: MASONRY: - Acceptance Tests — Placenient inspection Special Inspection Stresses Used Field Density Preliminary Acceptance Tests (Masonry L)nits. Wail F�risms) Sub"urnt Tests (Mortar. Grout, Field Wall PrisIns) STRUCTURAL WOOD: Placement Inspection of Units — Shear Wadl Nailing Inspection — Inspection of Glii-lam l7iiii. — Inspection of Truss 3oist hb. ADDITIONAL INSTRUCTIONS OR OTHER TESTS - Sample and Test Components AND INSPECTIONS: Form completed by- Title: Trlq*one No-: Date-