Loading...
20060717155705.pdfOV ED City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION st. I SP .(425) 771-0220 DATE: March 15, 2006 TO: Pat Archer FAX: 206-368-0316 FROM: Jenny Readwin, Plans Examiner RE: Plan Check #: 06-043 Project: 2 Triplexes (6 units) Project Address: 23707 and 23709 84'1'Ave W During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please provide written responses to the comments below and resubmit 3 sets of revised plans/documents to Manie Hamison, Permit Coordinator. This application was reviewed under the 2003 International Residential Code (IRC). Structual design that does not meet the conventional p rovisions of the IRC was reviewed under the 2003 International Building Code. 1) Complete the enclosed plumbing fixture count worksheet (one for each building). 2) Specify on the site plan if the wood fence is existing or proposed. 3) Notes on top of sheet 9 need to be located on each applicable sheet. There are no references to the particular page to find the notes so they need to be on each sheet where they apply. 4) Show how sinks in units 102 and 202 will be vented through the roof or with a loop vent as permitted by UPC 909.0.Air admittance valves are not permitted. 5) Provide an exterior wall detail at the stone venere. Clearly show how flasliing,w ather barrier and caulking will be provided to prevent moisture capillary action to wood. 6) Change note I on page 9 to state 103 cfrn whole house fan. Also, specify how kitchen fan will act as a hood exhaust fan as well as a whole house fan and where 24 hour timer will be located. 7) Provide detail for arbor/trellis construction. 8) Provide detail for in -floor hydronic heat installation. If there will be lightweight gyperete on the floorjoists provide calculations to justify that the joists are adequately sized to carry additional loads. Also, show location of water heaters or boilers in each unit. 9) Revise footing drains on the foundation details to match the detailprovided in the Geotech report. 10) Provide a section detail through the middle unit stairs to clearly show that minimum stair headroom will be provided. By my calculations minimum headroom will not be provided at the floor of the closet from upper floor to mian floor. 11) On detail 9/17 take off references to VvP3370. A STC rating is not required in the IRC and this wall assembly does not meet the 2 hour rated assembly requirement. 1�) On detail 9/17 fire blocking is required at the 2�d floor level and concealed spaces horizontally at 10' intervals. Note on detail.' 13) On detail 9/17 clarify penetration notes to show that penetrations will not go through the wall in to the adjacent unit. 14) On the site and floor plans show where the water and gas lines will enter each dwelling unit so that penetrations will not be made through common walls ftom dwelling unit to dwelling unit. 15) Detail 9/17 note says "Rim joist or beam per engineer."' Take off Beam reference at floor lines. These two walls must be structurally independent (R317.2.4) and constructed as 2 exterior walls. 16) Detail 1/11 "steel beam at party wall" — R317.2.4 requires these walls to be structurally independent. There can not be a common beam. Also change 8x8 posts shown to make the walls structurally independent. If you do not want the walls to be structurally independent then it needs to be a common 2 hour firewall as allowed per R317.2 (exception) but then the wall can not contain mechanical quipment, duct work, plumbing, etc. If you chose this option show how all mechanical and plumbing will be ran within each unit so that it does not penetrate the 2 hour wall and the wall must be continuous to the underside of the roof sheathing. 17) Provide letter from Geotechnical Engineer of Record stating that they have reviewed the plan's and that they are consistent with the report recommendations. 18) Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. A separate agreement form is required for each separate special inspector. Field Welding Placement of fill and compaction Soil bearing verification Proof rolling Footing drain installation See affached structural comments from the City's consultant. Respond to each item in writiM. Page 2 of 2