20060717160104.pdf017 ED City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: July 17, 2006 TO: Pat Archer FAX: 206-368-0316 FROM: Jenny Readwin, Plans Exatjne"� RE: Plan Check #: 06-043 Project: 2 Triplexes (6 uirilit's) Project Address: 23707 and 23709 84b Ave W During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please provide written responses to the comments below and resubmit 3 sets of revised plans/documents to Manie Harrison, Permit Coordinator. This application was reviewed under the 2003 International Residential Code (IRC). Structual. design that does not meet the conventional provisions of the IRC was reviewed under the 2003 International Building Code. 1) ok 2) ok 3) ok 4) ok 5) ok 6) ok 7) ok 8) ok 9) ok 10)ok II)pk 12) ok 13) ok 14) ok 15) It was noted that a common 2-hr wall option was chosen which per R31 7.2.1 continuity the entire wall must be continuousfrom thefoundation through the roof. This continuity is not being maintained at the catnilevered secondfloorlsteel beam area. I would be happy to meet with you at the counter to go over the different options. Ifyou would like to do this please call to set up a time that is convienitfor both of us. Detail 1/11 "steel beam at party wall" — R317.2.4 requires these walls to be structurally independent. There can not be a common beam. Also change 8x8 posts shown to make the walls structurally independent. If you do not want the walls to be structurally independent then it needs to be a common 2 hour firewall. as allowed per R317.2 (exception) but then the wall can not contain mechanical quipment, duct work, plumbing, etc. lf you chose this option show how all mechanical and plumbing will be ran within each unit so that it does not penetrate the 2 hour wall and the wall must be continuous to the underside of the roof sheathing. 16) New: Clarify if new 2 d wall for plumbing and mechanical is only at the garage level or if it continues through the other two levels. 17) New: Specify how the B-vent for the gas water heater under the stairs will be vented to the exterior. 18) Still need. Provide letter from Geotechnical Engineer of Record stating that they have reviewed the plans and that they are consistent with the report recommendations. 19) Receivedform for Geotechnical Special Inspector. Still need on for field welding. Sp ecial inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. A separate agreement form is required for each separate special inspector. • Field Welding • Placement of fill and compaction Soil beating verification Proof rolling Footmig drain installation See attached additional structural comments from the City's consultant. Respond to each item in writin. Page 2 of 2 Eagle Eye Consulting Engineers, P.S. PO Box 523 01alla, WA 98359 hoAeter@centurytel.net 2538574151 Fax 253 857 5759 To: Marie Harrison City of Edmonds Edmonds, WA 98020 Re: Archer Triplex Buildings I and 2 23707 84th Ave W Edmonds, WA 98020 Plan Review # 06-643 EECE # EDM 06-09 (2) Second Comment Letter Building I Structure Area S.F. Lower Floor 566 Main floor 1941 Upper floor 1940 Total 4447 Garage 1208 Grand total 5655 Building 2 Structure Area S.F. Lower Floor 566 Main floor 1941 Upper floor 1940 Total 4447 Garage 1208 Grand total 5655 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review isfor the structural only requirements of this project. Page 2 of 5 All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. STRUCTURAL COMMENTS General 5. It appears the dead load of thefloors has not been included in the analysis of the steel beams. The analysis is not clear. Please clarify how the gravity loads were determined In addition, for beams that are not simply supported but cantilever have multiple spans, thefloor loading shall be placed in order to produce the greatest effect on the member. Please resubmit an analysis to account for the code required distributive floor load to produce the greatest effect on the member. IBC 1607. 10 The new analysis for the steel beam states the moment is 39200 pound feet. It appears this was calculated byjust multiplying 9800 pounds by 4 feet. But the unliforin loads must also be considered. Please resubmit design of the members including all forces as required per code. 2. 6. Please submit an analysisfor thepost to support the design loads. This was not included in the analysis submitted. How were the sizes determined? An analysis is requiredfor the posts that are supporting the beams. This appears not to be addressed in the response Sheet 10 FOUNDATION PLAN (BLDG 1) 3. 12 Detail cut AIS-2 does not appear to be correct. This isfor walls and there is a 6X12 beam. Please clarify section cut as shown on this sheet. Drawings have not been modified as stated in the response. Response states "detail says wall or beam per plan". But the submitted drawing set does not specify this. Detail should be drawn clearly to show how it should build. The design professional should clearly show how this is to be constructed. 4. 14. Please specify the required connection of thejoist to the steel beam. A positive connection is required at this location. Based off the drawings I was unable to determine what the required connection is going to be at this location. Response state thejoist our on top of the beam. This is fine but the code required the joist to be positively connected to the nailer on top of the beam. This is very important. One reason for this to be specified is the joists are bracing the compression flange of the beam. If there is not a connection specified the contractor may not attach the members. Also this member is a collector element for the shear walls. Please show the required connection of the joist to the steel beam. Sheet 11 MAIN FLOOR FRAMING (BLDG 1): Page 3 of 5 5. 16 Detail 1: Please specify the thickness of the stiffenerplate at the wideflange column. I was unable tofind where this was called out. All that is states is 'Web stiffener'. The thickness should be speci/1'ed including an analysisfor how this was determined. The stiffener plate is specified but not the required weld. I assumed this might be field installed so please add to the drawing the required weld size. 6. 17. The drawing states to weld the bracket (ECCOQ5-6 SDA 2.5 col. Cap bracket for 5-118X21 G.L. weld to steel beam) to the steel beam. More information is required to show what the required weld is, including an analysis. nat is the thickness requiredfor the weld? Please submit an analysisfor this connection. Analysis was not submitted to justify the connections. Please submit analysis for this connection using welds. 7. 18. It is not clear what supports the 24 " cantilevered section after grid G2 and grid Ga. Please provide a detail and method to carry the vertical loads at this location. Drawings are still not clear how this is to be built. Submit detail at this location to show the complete load path. Provide detail cut at this location to show complete load path. 8. 19. Submit an analysisfor the 5-118X21 Glu-lam beams. The analysis submitted just states to use this beam with out any documentation showing this member will support the required design loading. NDS 5.3. The response state it is third beam down fon-n page 2 but I still was unable to find this from the documents submitted. Please submit analysis for this beam. 9. 20. Detail cut AIS2 as cut will not workfor the glu-1am beam. Please modf� the detail to show how this will beframed. (Detail AIS2 is onlyfor 2xjoist attaching to shear wall below) Please provide detail on the drawingfor the shearflow of the shear wall mark A hearing on the steel beam. The drawings are still not clear. Details should be added to the drawing to show complete load path. Please add detail to show how this is to be built in the field. Sheet 12 UPPER FLOOR FRAMING (BLDG 1): 10. 22. This sheet is showing Gypsum shear walls used to transfer the shearfrom the diaphragm. The code requires the R value of 2 to be used. Please modify design to use the R of 2 and not 6.5. IBC table 1617.6.2 1 was unable to determine how this was addressed. Please submit analysis with an R of 2 as required per code. Sheet 17 SECTION DETAILS: 11. 25. Detail I and Detail 2: Please note that the vertical steel shall be have a 90 degree hook into thefooting orprovide an analysisfor the steel to develop in a 8 Page 4 of 5 footing. A CI 12.5 Code requires the vertical steel to have a 90 degree hook. Drawing still does not specify a 90 degree hook. Please modify accordingly Sheet S-1 SPECIFICATIONS AND DETAILS: 12. 2 7. Provide an analysis tojustify diaphragm nailing specified on this Sheet. I was unable tofind where this was done in the analysis submitted. IBC 1620.2.5 This still has not been submitted in the package. It is import that the horizontal diaphragm is able to transfer the shear force to the vertical resisting elements. Submit design for the horizontal elements. Also the proper R value shall be used based off the revisiting elements. Please resubmit analysis to verify the diaphragm requirements. 13. 29. Shear wall capacity exceeds the values per table 23064.1. For example, shear wall C: 318 " plywood with studs @ 16 " 01C with 8d@ 3 " 01C HF. the allowable is 456 and not 512 PLF. Also shear wall D allowable is 595 and not 679 PLF. Submit an analysis tojustify capacity. This still has not been addressed or modified accordingly. Response state structural I is called out but analysis was not submitted to justify capacity shown. Submitted analysis to justify. 14. 32. Shear transfer detail: Provide an analysisfor how the spacing of the A35 @ 24 inches 01C. How was this determinedfor the shear wall connection? The capacity is only goodfor 450 PLFper clip. Therefore spaced at 2foot 01C, the capacity is 225 PLF. Based off the shearforces it appears this will be exceeded. See Simpson catalog C-2006 page 169. It still is not clear how this was addressed. Sheet S-2 MISC. SECTIONS AND DETAELS: 15. 33. Detail 1: The width shownfor the concrete shear wall does not match thefloor framing. For example, I V 0 " is 21 inches, 25 is 29 ". See sheet 10 of 18: Please modify detail to match the plans. The drawings still show conflicts. Please modify accordingly 16. 34. Pleaseprovide an analysisfor the wallpiers requirementsper IBC 1908. The analysis submitted has not dealt with this requirement. Please note wall segments with a horizontal length to thickness ratio less than 2.5 shall be designed and detailed as a column, but between 2.5 and 6 awall pier may be used. Above 6 then the wall must be detailed per ACI 21. 7. Currently the details do not meet this requirement. Please submit an analysis tojustify the concrete detail as shown. IBC 1908, New analysis submitted meets the thickness to width ratio for the columns. The code requires for columns every other vertical bars must be enclosed. Please add an addition tie as required per code for the vertical bars. ACI 7.10.5.3 Page 5 of 5 17. 35. Detail A and Detail B: Provide an analysisfor these details to tran fer the shearforces between thefloors. Analysis submitted has not modified capacity based off edge distance. Submit analysis including this reduction in capacity. NDS 11.5 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (253) 857-4151 between 8:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President