20060718132400.pdfED City of Edmonds 0 "Y PLAN REVIEW COMMENTS BUILDING DIVISION I to,) (425) 771-0220 DATE: July 18, 2006 TO: Paul Monson Baja-Buildin@msn.com FROM.: Jenny Readwin, Plans Examin RE: Plan Check # 2006-0781 Project: Rybienik Addition Project Address: 24226 77 th PL W During review of the above noted application, it was found that the following inforination, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Show outline of second story addition on the site plan. 2) Provide an existing main floor plan. 3) On the plans clearly distinguish between existing and proposed (foundation, floor plans, framing, etc.) and provide a detailed description of proposed work. For example, shearwalls are shown though the main floor, will the siding and/or sheathing be replaced in order to verify the nailing? 4) Provide crawlspace ventilation calculations and show size and location of crawlspace vents on foundation plan. 5) Show size and location of crawlspace access. 6) Smoke detectors are required throughout the existing residence in each sleeping room and in the hallway outside each separate sleeping area. 7) Specify all hangers for hung beams as well as show posts/multiple studs to verify beam spans and how all loads are carried to bearing. 8) Specify all post base and post cap connectors required in order to resist lateral displacement. 9) Specify size of entry door header and provide calculation including point load from roof beam (3 1/2 X 11 '/4 PSI) - 10) Provide a section detail through roof beams at the entry/dinning room to help clarify framing since the calculations do not take into account any point loads. 11) Specify floor framing at the proposed entry (i.e. floor joists, slab on grade, etc.) and add applicable information to the details. 12) R403.1.3 requires all vertical rebar to have a standard hook. Revise foundation detail to reflect. 13) Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. 0 Epoxy anchor bolts/holdowns CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT The project at 2 Lj,;�;L(o 771"'1 J?L bc) issued under building permit number :61K h __tUOT requires special inspection and/or testing per IBC C apter 17. The complete list of special inspections is attached to this document. BEFORE A PERIMT CAN BE ISSUED. The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification When performing special inspections on site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis —meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: 0 Description of daily inspections and tests made with applicable locations * List of all non -conforming items 0 Report on status of non -conforming items (resolved or unresolved) 0 Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. 5. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L:\TEMP\BUILDING\SpeciallnspectionAgireementIBC.doe 7/04 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in, this report. B. Contractor Responsibilities 1. . Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at-4he jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Department Responsibilities 1. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall he monitored by the City Building Inspector. His/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted. D. Owner Resp nsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Enp A ,,ineer or rchitect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS, I have read and agree to comply with the terms and conditions of this agreement. Owner Special Inspector General Contractor City Building Official Date Date Date Date L.-�TEMP�BU,ILDINGNSpeciallnspectionAgreementIBC.doc 7/04 SPECIAL INSPECTION AND TESTING SCHEDULE eyl c94Dc-4o MOJWT ADDRESS M-04SPECTION AGU4CY . S PECL-0- NNSPECTM REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: STRUCTUR-ALSTEEL/WELDING: Conerne Gunite Grout Monw Samnle and Tevi fist I.— WIUW) AWmgate Tesm — Shop Matenal Identification -�R Tests — Welding hivection 0 Shop 0 Field Mix Designs — UI=Oftic InsPOct)(311 0 Shop OField Reinforcing Placement — lligh-strength Bolting Batch Plant Inspection Inspection E) Shop 0 Field Inspect fticinz- D A325 0 N 0 D Cast Samples DA490 Pick-up Samples — Metal Deck Welding Inspectitm (7�—;� Tests — Reinforcing Steel Welding Inspiection PRECASTIPRESTRESSED CONCRETE: — Metal Skid Welding Inspection — Concrete Insert Welding Inspection Piles Post-Tew Pre-Tms Cbddmg FIREPROOFING: Reinforcing Tests — placement Inspection Tendon Fests — Density Tirsts Mix Desi2ns — Thickness Tests Reinforcing Placement — Inspect 112tching )nscrt Placement Concyclellatching INSULATING CONCRETE: Concrete Place men t — Sampf and Test Installation lnscpclion — Placement Inspeclion IE-�S--Ples — Unit weigbis 1pick-up Samples FILL MATERIAL: MASONRY: — Acceptance Tests — Placement Inspection Special Inspeciton Stresses Used — Field Density Preliminary Acceptame Tests (Masoury Units, Wall Prisms) Subsequent Tests (Mortar. Grout. Field Wall Prisms) STRUCTURAL WOOD: Placement Inspection of Units — Shear Wall Nailing Inspection — Inspection of Glu-larn F;ib. — Inspection of Truss Joist Fab - ADDITIONAL INSTRUCTIONS OR OTHER TESTS — Sample and Test Components AND INSPEC'TIONS.- . -AfAs 1- /7 �' 1 1 a I INVA - 10"S I M-M i i wy, w wm Form completed by: Tptic-� Tclephone No.: Date: