20060719094340.pdfDATE: July 19, 2006 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Tom Leren Tom@lerendesign.com FROM: fenny Readwin, Plans Exami e RE: Plan Check # 2006-0745 Project: Mustach SFR Project Address: 8208 182d PL SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Provide top and bottom wall elevations for all proposed retaining walls at the exterior stairs. 2) Show handrail for proposed exterior stairs on the site plan. A handrail is required for 4 or more risers and guardrails are required to protect falls greater than 30". 3) Specify height of guardrail at top of stairs open to below. Also, guardrails are required to resist 200 psf and the in -fill components must resist 50 psf per Table R301.5. Note on plans. 4) Specify on the elevation views the grade slope away from the building. If minimum 6" within 10' is not possible or habitable or useable space is below grade, foundation drainage is required. Provide footing drain detail on foundation sections complying with R405.1 and show required drain locations on the foundation plan. 5) In order for the basement to be considered "unfinished" it can only have a concrete floor and exterior walls or interior load bearing walls. It can not have any interior non-bearing partitions, rough -in electrical, plumbing, mechanical, etc. Please revise basement to truly be "unfinished" or revise to say finished and designate uses of space (not future). 6) Garage door is shown for lower floor "wood shop" but no driveway access is proposed on the site plan. Contact Engineering Department to see if a second access would be permissible. If so show proposed driveway on the site plan and if not, then door needs to be reduced in size so that a vehicle would not be about to pass through (i.e. double man door). 7) See attached structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel. net 253 857 4159 Fax 253 857 5759 To: JoAnne Zulauf City of Edmonds Edmonds, WA 98020 Re: Mustach Residence 8208 182nd Place SW Edmonds, WA 98020 Plan Review # 2006-0745 trail., U _tifia Basement 1116 First floor 2207 Second floor 1999 Total 5322 Garage 1633 Total 6955 Deck 211 Grand total 7166 7/11/2006 EECE # EDM 06-3 5 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Struetural requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 3 EECEM EDM 06-35 2006-0745 STRUCTURAL COMMENTS Sheet 10 Details 1. Detail J10 EOR please specify the required spacing of the vertical post for the deck. Sheet 5 shows this deck off the computer hallway. This detail is required to resist a force of 200 pounds applied in any direction and the infill must resist a force of 50 psf. Also per check analysis it appears this connection will not support this force as details. Please submit analysis to justify. Table R301.5 Sheet S 1 2. Please submit design analysis for the site retaining wall. There was not any in the submitted analysis only the restrained wall design. Per check analysis for the 10 foot high wall it appears the reinforcement will not resist the design force as specified on the drawings. Please submit design analysis for all walls over 4 feet high as detailed on this sheet. IBC 1808 3. The restrained wall design for the 9 foot high wall shows the soil pressure will exceed the maximum pressure. Please resubmit analysis to show the soil will not be exceeded. IBC 1806 4. Please specify the required connection of the beams to 6x6 and 4x4 post. I was unable to find where this was specified on the drawings. For example the 6X8 post supporting the 6-314X24 GLB. Please add this information to the drawings. IBC 23049.7. 5. Please specify the required post to support the 3-112X11-7/8 PSL at the stair wall. IBC 2304.9.6 6. EOR please specify the required connection for the cantilever member to the supporting framing. I was unable to find where this was called out on the drawings. IBC 2304.9.6 Sheet S2 7. EOR please specify the required post size to support the 7X11-718 PSL at the stair. Also please specify the required post to beam connections at this location. IBC 2304.9.7 8. Shear wall schedule: Please modify note 8 to state 3X member or provide analysis for using double 2x. Code specifically states when shear loads exceed 350 PLF a single 3x member shall be used. IBC 2306.4.1 Page 3 of 3 EECE#: EDM 06-35 2006-0745 9. Shear wall schedule: EOR please clarify where footnote 4 applies to the schedule. I was unable to find where this was specified. This is important to see if 3X member is required or not. I believe this should be used for shear wall mark C, D and E. If this is the case please modify to state 3X required and not 2X or submit analysis to justify. IBC 2305.3.10. 10. EOR it appears in the analysis wall mark E33, at the diagonal wall, used the whole length to determine the resisting force. The resulting length should be used in the direction of lateral force. Please clarify and modify accordingly. Sheet S3 11. EOR please label the required shear wall below the 2x 12 rafter on the left side of the house. The wall should be labeled B6 to be consistent with the other sheets. 12. Detail ISR: EOR please specify the axial force the truss manufacturer required to design the truss. The truss is the collector element to transfer the roof diaphragm force into the shear wall. Typically the truss is only designed for gravity loads only. Since the truss is acting as the collector element to the SW6 wall the required force should be added to the drawing as the truss manufacturer designed it for this. Please add this information to the drawings. IBC 106.3.4.1 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (253) 857-4151 between 8:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President