Loading...
20060727101619.pdfDATE: July 27, 2006 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Adam Clark Gary Parkinson Architects FAX: (425)742-8130 FROM: Axon Bullis, Assistant Building Official RE: Plan Check # 06-010 (#2006-0563) Project: Korean United Presbyterian Church Gym/Education/Assembly Bldg. Project Address: 8505 240' Street SW During re -review of the above noted project, it was found that the following information and clarifications are still needed. Please provide written responses to each comment as to how it has been addressed, and where changes can be found on the plans. Please submit 2 sets of revised plans/documents (applicable sheets only— not complete set) to Marie Harrison, Senior Permit Coordinator. 1) Previous item #4 still not adequately addressed: Show the accessible route of travel on the site plan connecting the public way, building entrances, accessible parking stalls, adjacent church building, etc. Clearly note all slopes within the accessible route of travel and show locations and details of accessible signage directing people to the accessible entrances. (previous additional non-structural comment 8). Your response states that " The accessible route is now shown as requested. See the revised Civil drawings." I did not find this information on the civil drawings. If it was intended to be shown on the Landscape plan (by symbol A with an arrow, which needs to be identified), this still does not address slope and directional signage (since not all entrances are accessible). Also, the accessible path of travel from the main church building is unclear and based on the civil plans, the slopes exceed 1:12 at all paths. The landscape plan also shows some of the paths as "temporary" and "non -accessible". A temporary accessible path would not be acceptable. Please revise as previously requested and coordinate civils, landscape and site plan accordingly. 2) Previous item 13 still needs clarification with regards to the dishwasher venting: As previously requested, provide a kitchen equipment plan. Kitchen 110 is considered a commercial kitchen with Commercial Cooking Appliances as defined in IMC 202. Type I and Type H hoods will be required as noted in IMC 507. Show shaft locations and construction details. Please respond to plan review continents by Jon Lein, Pretreatment Technician, so that it can be determined if a grease interceptor or grease trap will be required. The grease interceptor must be coordinated with the Civil design for utilities. (previous comment Additional Nonstructural Comment #I1). As discussed in our last meeting, a Type II hood is required for the dishwasher, unless it mects one of the exceptions to IMC 507.2.2 and is either an. "undercounter" type, or contains an exhaust system as part of the dishwashing unit. If it is an undercounter type, note on the floor plans. Otherwise, note that a Type 11 hood (which can be deferred to the mechanical review) is required and if a shaft will be needed, show the shaft on the plans and provide shaft construction details. 3) 1 have added Type I Hood and Hood Suppression System to the deferred submittals list. 4) Clarify A5.2 and A2.2 to show that the showers in the restroom are accessible, including clear floor space, and shower details.. Based on the size of the showers, they must be Transfer -type showers with either a permanent or drop-down seat, grab bars, etc. See ICC/ANSI Al 17.1 Section 608 5) Sheet A2.3 still shows the area of evacuation assistance. Based on your response to previous item 18, I have crossed them off the plans so there is no confusion. Page 2 of 2