20060727110756.pdfr� fZlf„i�i8,5� v fiF£1. tp �St. 1 890 DATE: July 27, 2006 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Steve Waite 111 Durbin Lane Edmonds, WA 98020 FROM: Ann Bullis, Assistant Building Official RE: Plan Check # 06-197 (2006-0644) Project: Kero's Auto Sales -- Retaining wall Project Address: 22324 Highway 99 Additional review comments from the City's consultant regarding the retaining wall design were forwarded to you with additional review comments from the Engineering Division. As noted in my 5/17/06 comments Special Inspections will be required for this project as follows. 1. Soil bearing verification 2. Placement of fill and compaction (if required by geotech during soil bearing inspection) 3. Concrete construction (only if the redesign of the wall in response to consultant comments requires an fc is greater than 2500 psi) 4. Retaining wall drainage installation Please complete the enclosed Special Inspection and Testing Agreement. Have the owner, special inspector (one form required for each special inspection firm) and general contractor sign the form and return for Building Official approval. Please submit to Marie Harrison, Permit Coordinator. C, CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT The project at issued under building permit number requires special inspection and/or testing per IBC Chapter 17. The complete list of special inspections is attached to this document. BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification when performing special inspections on site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis—meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect.of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: • Description of daily inspections and tests made with applicable locations • List of all hon -conforming items • Report on status of non -conforming items (resolved or unresolved) • Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. 5. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L:ITEMPIBUILDING1SpeciallnspectionAgreement]BC.doc 7/04 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in this report. B. Contractor Responsibilities 1. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at -the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C.. City of Edmonds BuildinL- Department Responsibilities 1. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. His/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner Date Special Inspector General Contractor City Building Official L:ITEMPIBUILDING1SpeciallnspectionAgreementlBC.doe 7104 Date Date Date SPECIAL INSPECTION AND TESTING SCHEDULE Concrete Granite Groin Me"ar —Sample and Test [list specific members below) Aggtegatc Tests — Shop Material Identification Reinforcing Tests - Weldinghnpection OShoP C3Fte1d Mitt Designs — ultrasonic Inspection Q Shop O Field Reinforcing Placcrrtent Mgh-strength Bolting Batch Plant Irnspett 11 Inspection Q Shop 0 Field hspcct Placing Q A325 Cast Samples Q A49D [IN Q X [IF Pick-up Samples — Metal Deck Welding: Inspection Compression Tests ` Reinforcing Steel We1dwg Inspr don _ Metal Stud Welding Inspection PRECAST/PRESTRESSED CONCRETE; _ concrete Itrsert welding ]nspectentt r� ,�-reps rn-tems ate Tests cing Tests Tests Reinforcing Placement Insert Placement Concrete Batching Concrete Placement Cast Tats MASONRY; _.._ Special Inspection Stresses Used Preliminary Acceptance Tests (Masonry Units, Wall Prisms, Subsequent Tests (Mortar. Grout. Field Wall Prisms) — Placement Inspection of Units ADDITIONAL INSTRUCTIONS OR OTHER TESTS AND INSPECTIONS; FIREPROOFING; — Placement Inspection — Density Tats - Thickness Tcsts — Inspect Batching INSULATING CONCRETE: Sample and Test — Placctr=t Inspection Unit weights FILL MATERIAL; — Acceptance Tests — Placement Inspection — Field Density STRUCTURAL WOOD- - Shear Wall Bailing Inspection. Inspection of Glu -lane Fab. Inspection of Truss Joist Fab_ Sample and Test Components