Loading...
20060802142031.pdfOV EDO City of Edmonds y= }y PLAN REVIEW COMMENTS BUILDING DIVISION �St. i ago (425) 771-0220 DATE: August 2, 2006 TO: Michel Construction Inc. michelbz@nwlink.com FROM: Jenny Readwin, Plans Exami e RE: Plan Check # 2006-0794 through 20060801 Project: 8 SFR Development Project Address: 82"d and 212th During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator.. 1) Soils report from Dennis M. Bruce, PE dated June 21, 2006 specifies that 4 test pits were dug. Provide site plan from Dennis M. Bruce, PE showing test pit locations as well as soil logs for each test pit as required by IRC chapter 4. 2) Specify if 5' concrete retaining wall shown on the site plan along 212th is existing or proposed. If proposed provide top and bottom wall elevations as well as construction details. 3) Remove all arbor details on sheet 9 from the plans if they do not apply. I did not see any proposed arbors on the site plan or elevation views. 4) Show all eaves on the site plan along the driveway entrance. 5) See attached structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytieter@centurytel.net 360 874 0562 Fax 360 874 0599 To: Theresa Umbaugh City of Edmonds Edmonds, WA 98020 Re: Michel SFR 82nd PI. W. @ 212th St. S.W. Edmonds, WA 98020 Plan Review # 2006-794 & 06-795 EECE # EDM 06-37 a] Structure Stated Area S.F. First floor 679 Second floor 995 Total 1674 Garage 454 Grand total 2128 Date: July 21, 2006 Note Two plans are identical for 794 and 795: This letter applies to both structures. The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 3 EECE#: «ProjectID» «Prof ectDescriptiow> STRUCTURAL COMMENTS Sheet A3: First Floor Plan 1. Please provide details on the drawings for the guard rails shown at the opening to below. This is required to resist 200 pounds applied in any directions and 50 psf for the infill's. IBC 1607.7.1.1,113C 1607.7.1.2 and IRC table 8301.5 Sheet S3 Shear Wall Plan 2. EOR please provide a foundation plan for this house. This sheets state all the footing information is per the foundation plan. The only foundation plan is sheet A5 which also states footing per foundation plan. This plan should give the required reinforcement, 90 degree hooks specified in the footings, etc. Please add this to the drawing in order to complete the foundation review of this structure. IBC 106. 1.1 and TBC 1805 3. EOR please clarify note that state joist per A7. This sheet is for the roof framing. believe the intent is to reference A6. Please modify accordingly. IBC 106 4. Architectural drawings show the Joists and Beams in the same plan and hangers are required to be specified. I was unable to find on the drawing where the required size was specified. Please add this to the drawings or clarify where this is shown on the drawings. IBC 2304.9; IBC 2304.9.6 5. Please add to the drawings the required hanger to use for the support of Beam 6 supported by Beam 7. IBC 2304.9;1130 2304.9.6 6. Please add to the drawing the required hanger to use for the support of Beam 5 supported by Beam 7.113C 2304.9; IBC 23049.6 7. Please add to the drawing the required hanger to use for the support of Beam 4 supported by Beam 7. ( There are other locations where the size of the hangers are not specified so please modify drawings to specify the required hangers) IBC 23049; IBC 2304.9.6 8. EOR please specify the required nailing of the plywood diaphragm to the drag joist. This is required to drag the horizontal diaphragm forces into the shear walls. Based on the plywood layout (perpendicular to the joist) the nailing could be all field nailing of 12" OIC which would not transfer this forces. Please add to the drawing or point out where it is specified. IBC 1620.2.6 Sheet S-4 Shear wall Plan Page 3 of 3 EECE#: «ProjectIM «ProjectDescription» 9. EOR please specify the required axial load the truss manufactures is required to design the GT#1 and GT#2 girder trusses. These members are collector elements to transfer the horizontal shear forces into the shear walls. IBC 106.3.4.2 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. 'Should you have any inquiries regarding this letter, please contact Tfoyt Jeter at (253) 857-4151 between 5:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Theresa Umbaugh City of Edmonds Edmonds, WA 98020 Re: Michel SFR 21215 and 21211 82nd PL w Edmonds, WA 98020 Plan Review # 2006-796 & 06-797 EECE # EDM 06-38 Structure Stated Area S.F. First floor 721 Second floor 1005 Total 1726 qpLuse 1 431 Grand total 1 2157 Date: July 21, 2006 Note Two plans are identical for 796 and 797: This letter applies to both structures. The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 2 EECE#: EDM 06-38 Michel SFR Plan Review Number 2006- (796 & 797) STRUCTURAL COMMENTS Sheet S3 Shear Wall Plan 1. EOR please provide a foundation plan for this house. This sheets state all the footing information is per the foundation plan. The only foundation plan is sheet A5 which also states footing per foundation plan. This plan should give the required reinforcement, 90 degree hooks specified in the footings, etc. Please add this to the drawing in order to complete the foundation review of this structure. IBC 106. 1.1 and IBC 1805 2. EOR please clarify note that state joist per AT This sheet is for the roof framing. I believe the intent is to reference A6. Please modify accordingly. IBC 106 3. Architectural drawings show the Joists and Beams in the same plan and hangers are required to be specified. I was unable to find on the drawing where the required size was specified. Please add this to the drawings or clarify where this is shown on the drawings. IBC 2304.9; IBC 2304.9.6 4. EOR please add a collector element in line with shear wall mark 1. Also please specify the required nailing of the plywood diaphragm to this joist. This is required to drag the horizontal diaphragm forces into the shear walls. Based on the plywood layout (perpendicular to the joist) the nailing could be all field nailing of 12" OIC which would not transfer this forces. Please add to the drawing or point out where it is specified. IBC 1620.2.6 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (253) 857-4151 between 5:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President