20060802154616.pdfti� EDS City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION lago (425) 771-0220 DATE: August 2, 2006 TO: Cathy Patterson cathy@hooverpremicrhomes.com FROM: Jenny Readwin, Plans Exa*er RE: Plan Check # 2006-0792 Project: RH Hoover SFR Project Address: 17122 69" PL W. During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) On the site plan show stairs off both west decks. 2) Show how island sink will be vented through the roof or with a loop vent as permitted by UPC 909.0.Air admittance valves are not permitted unless first approved by the Building Official under and alternate method per UPC 301.2. 3) Specify on the elevation views the grade slope away from the building. If minimum 6" within 10' is not possible or habitable or useable space is below grade, foundation drainage is required. Provide footing drain detail on foundation sections complying with R405.1 and show required drain locations on the foundation plan. 4) R403.1.3 requires all vertical rebar to have a standard hook. Revise all foundation details to reflect. 5) See attached structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: JoAnne Zulauf City of Edmonds Edmonds, WA 98020 Re: The Meadowdale III 17122 69th Place W Edmonds, WA 98020 Plan Review # 2006-0792 Rk. ciao ke— O Structure Area S.F. Lower Floor 1666 Second floor 2268 Total 3934 Garage 698 Total 4632 Deck over 30' G 322 rand total 4954 July 21, 2006 EECE # EDM 06-36 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural Only requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 3 EECE#: EDM 06-36 The Meadowdale III STRUCTURAL COMMENTS Sheet A3 FOUNDATION PLAN: 1. Please modify the drawings for the P1-3 to state 3X member required and not (2) 2X. IBC table 2306.4.1 footnote i. Sheet A4 LOWER FLOOR PLAN: 2. Please provide details on the drawing for the construction of the deck off the recreation room. The deck elevation will be over 30 inches above grade and details should be added. Please add detail for the connection of the deck to the house, joist to the supporting members, etc. All that I was able to find specified on the drawings was the post to beam connections on sheet A3. 3. Please provide details for the guard rails at the deck. I was unable to find any information on the structural requirement for the guards. This is required to resist a force of 200 pounds applied in any direction. 4. Please provide details on the drawing for the construction of the deck off the nook. The deck elevation will be over 30 inches above grade and details should be added. Please add detail for the connection of the deck to the house, joist to the supporting members, etc. 5. Please add the required connection for the floor joist and 1-314X11-718 Micro -lam to the supporting beam specified as B-4 to the drawing. The details on the drawing do not show how this is to be attached. Please clarify the required connections on the drawing. Sheet A5 MAIN FLOOR PLAN: 6. Architect of Record (AOR), please clearly note that double studs are required under RB 8 beam. Based off the required force a minimum bearing shall not be less than a double stud. The drawings state this will be specified on the plan. Please clearly note this to the plan. 7. AOR, please clearly note that double studs are required under RB 4 beam. Based off the required force a minimum bearing shall not be less than a double stud. The drawings state this will be specified on the plan. Please clearly note this to the plan 8. Please modify drawing for the P1-3 to state 3X member required and not (2) 2X. IBC table 2306.4.1 footnote i. 9. AOR please specify the requirement for the construction of the stairs at the deck at the great room. Page 3 of 3 EECE#: EDM 06-36 The Meadowdale III Sheet G-1 TYPICAL WALL SECTIONS: 10. Vertical bars from the stem wall into the footing shall have a 90 degree hook. Please modify drawings accordingly. Note, this is noted but the bars should be shown with the hook into the footing to assure this is built correctly. R403.1.3 11. Provide an analysis for a #4 pin to prevent lateral translation at the base of the column. There is no way for the inspector to verify the size of hole drilled or that it has been installed. The international codes specify the base of the post shall be restrained to resist lateral translations. In a seismic event the base of the column may move causing a possible failure. Please modify detail accordingly. R407.3 and IBC 2304.9.7 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (253) 857.4151 between 5:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President