20060803094350.pdfo Eng City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION Esr. X89° (425) 771-0220 DATE: August 3, 2006 TO: Bruce O'Neill Dw.mick@verizon.net FROM: Jenny Readwin, Plans Exami e RE: Plan Check # 2006-0659 Project: 7418 169th PL SW Project Address: 7418 169th PL SW During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the above items to a Permit Coordinator. 1) ok 2) ok 3) ok 4) ok 5) ok 6) ok 7) ok 8) Still need letter stating that he has reviewed the house construction plans. The letter we received only mentions the rockeries -hard to tell if that was all he reviewed. Provide letter from. Geotechnical Engineer of Record stating that they have reviewed the plans and that they are consistent with the report recommendations. 9) Ok 10) See attached addition structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 253 857 4151 Fax 253 857 5759 To: JoAnne Zulauf City of Edmonds Edmonds, WA 98020 Re:Gerdes Residence Date: 6/2/06 7418 169th Place SW Edmonds, WA 98020 Plan Review # 06-227 EECE # EDM 06-24 (2) Second comment letter The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the structural only requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Orisinal comment will be written in italic if not addressed appropriately or unable to verify how the drawin s were mothied to meet the code. Lower Floor 2586 Main Floor 2611 Total 5197 Garage 815 Total 6012 Lower Floor Patio 441 Main Floor Deck 352 Main Floor Parch 237 Grand total 7112 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the structural only requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Orisinal comment will be written in italic if not addressed appropriately or unable to verify how the drawin s were mothied to meet the code. Page 2 of 2 EECE#:EDM 06-24 Gerdes Residence 06-227 STRUCTURAL COMMENTS Sheet A7 Main Floor Framing 1. EOR please specify on the drawing the required post to beam connection and post base for the columns. Not all location are called out on the drawings. This should be added to the drawings to complete the load path. 2. 14. EOR please specifies the beam required to support the stair stringers. IBC 106.1 The beam is specified but not the required post on each end or the required beam to post connection. Please add this when resubmitting. Sheet Al2 Details 3. Detail 11: The design assumes the compression flange of the wide flange will be continuous braced but the details do not show how the joist will be attached. Please add the required connections to the drawings. This still has not been addressed on the drawings. Please add this information or modify design for un - braced length the full length. 4. 22. Please add shear wall schedule to clearly note what is required in the details shown on this sheet. This shall include the EN, SN, BE, FA, BN, FNrequirements. IBC 106.1 This still has not been addressed on the drawings. Shear wall schedule does not match details as required. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (253) 857-4151 between 5:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President