Loading...
20060810110231.pdfor Eng City of Edmonds E o� jR .'_ `p PLAN REVIEW COMMENTS BUILDING DIVISION (425)771-0220 DATE: August 10, 2006 TO: Thrnh Tram 8410 Main Street, Suite B Edmonds, WA 98020 FROM: Ann Bullis, Assistant Building Official RE: Plan Check # 2006-0915 CCS Project: Plumbing permit application for 3 pedicure chairs Project Address: 8410 Main Street In reviewing the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please submit 2 sets of revised plans/documents to Marie Harrison, Permit Coordinator. Please have your plumber help you provide information and plans for the following comments: 1. Provide manufacturer's installation instructions for the pedicure chairs. 2. Show the water supply piping (type, size and layout) on the floor plan for both hot and cold water, where it enters the tenant space and is run to all plumbing fixtures. 3. Reduced Pressure Backflow Assembly (RPBA) required to protect the public water system within the tenant space. If the chairs are plumbed at the end of the water supply line, one RPBA is required immediately before the connection of the first chair to the water supply line. If the chairs are not plumbed at the end of the water supply line, then one RPBA is required for each chair. Show location(s) of the RPBAs on the plumbing plan. 4. How will the water be drained from the pedicure chairs? If they are connected to the sanitary waste system, show drain, waste, and vent piping (layout, sizing, slope, pipe material). 5. The Public Works Department is requiring premise isolation (RPBA) to protect the public water system where the water supply line enters the tenant space. Please show this on the plan, and contact Linda McMurphy, Cross Connection Control Specialist at 425-771-0235 if you have any questions regarding this item. Attachment: Plumbing Permit Submittal Requirements handout with highlighted items. B55 Plumbing Permit Submittal Requirements PERMIT REQUIRED: A separate plumbing permit is required for new commercial construction (excluding multifamily projects). CODES: Uniform Plumbing Code (Current Edition) International Fuel Gas Code (Current Edition) LPG per 2001 NFPA-58 and 2002 ANSI 2223.1/NFPA-54 FEE: Based on the number of plumbing fixtures SUBMITTAL REQUIREMENTS: Submit a permit application, Plumbing Fixture Schedule Form (attached), copy of the approved floor plans with details as required below, and calculations showing the following: J. Drain, Waste and Vent piping layout; sizing, slope. and pipe material 2. Potable water line layout,sizing and pipe material 3. Fixture unit and flow calculations to support line sizing 4. Cross connection devices are required.on all direct connections.to the potable water system. Specify ` all fixtures that require cross connection devices (i.e., ice machines, soap ejection ,systems, beverage dispensers, boilers, etc.) and note the make/model of each device. 5. Indicate the location and cross connection device for premise isolation 6. Manufacturer's specifications for equipment ;such as sump pumps, ejector pumps, water heater boosters, etc. 7. Gas piping layout, sizing and pipe material, pipe sizing calculations, and maximum design operating pressure, location of pressure regulators 8. Listed and tested Fire Stopping Assemblies 9. Gas meter location NOTE: No underground plumbing can be installed until the plumbing permit is obtained. L:Temp:Building: icodehandoutplumbingho 12104