Loading...
20060814144546.pdfoz E� City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION Fat. ago (425) 771-0220 DATE: August 14, 2006 TO: Maria Fedorean Fax 425-774-8732 FROM: Jenny Readwin, Plans Exam' e RE: Permit Number: 2005-0866 Project: Fedorean Revision Project Address: 9609 Cherry St. During review of the above noted revision, it was found that the following information, corrections, or clarifications are needed. 1) Expand detail 1 provided to show what is supporting 4x10 beam and both sides of the floor joists. Beam must be continuously supported the entire length or sitting directly on the visqueen over the slab so it does not create point loads on the slab. One side of the floor joists specifies hangers clarify what they are hanging from and specify what is supporting the other side of the joists.