20060814144546.pdfoz E� City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
Fat. ago (425) 771-0220
DATE: August 14, 2006
TO: Maria Fedorean
Fax 425-774-8732
FROM: Jenny Readwin, Plans Exam' e
RE: Permit Number: 2005-0866
Project: Fedorean Revision
Project Address: 9609 Cherry St.
During review of the above noted revision, it was found that the following information, corrections,
or clarifications are needed.
1) Expand detail 1 provided to show what is supporting 4x10 beam and both sides of the floor
joists. Beam must be continuously supported the entire length or sitting directly on the visqueen
over the slab so it does not create point loads on the slab. One side of the floor joists specifies
hangers clarify what they are hanging from and specify what is supporting the other side of the
joists.