Loading...
20060815155411.pdfOr EDS Ci!y of Edmonds . N,i0' PLAN REVIEW COMMENTS BUILDING DIVISION Esc. 1890 (425) 771-0220 DATE: August 15, 2006 TO: Keith Beddow kfbeddow@hotmaii.com FROM: Jenny Readwin, Plans Examiner ' RE: Plan Check # 2006-0838 Project: Herb Deck Project Address: 940 Grandview St. During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redlinc plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) EOR please specify length of %"bolt. Revise lcdger lag bolts to 3/8" x 4 %2" @ 6" o.c. or provide calculations stamped and signed by a Washington State Licensed Professional Engineer for size and spacing shown on the plans. 2) EOR please expand steel beam detail 2 to show how deck joists will be connected to beam. Provide calculations stamped and signed by a Washington State Licensed Professional Engineer for proposed steel beam as well as connection details for attachment to wood posts and floor joists. This is not conventional construction.