PLAN REVIEW COMMENTS
BUILDING DIVISION
103 (425) 771-0220
DATE: August 16, 2006
TO: Chris Amonson
TGB Architects
FAX: 425-774-7803
FROM: Ann Bullis, Assistant Building Official
RE: Revision to permit #2005-0962
Project: Medical Gas Room Ventilation Shaft
Project Address: 21911 76th Ave West
During review of the above noted revision, it was found that the following information, clarifications or
changes are still needed. Please submit 2 sets of revised plans/documents (affected sheets only) to Marie
Harrison, Permit Coordinator.
1. Revised sheets note a 2 -hour shaft for the shaft, however the shaft wall types referenced are 1 -hour walls
per Sheet B9.20 of the shell/core plans. Please revise to 2 -hour shaft assembly.
2. Sheet A2.01 shows two exhaust ducts coming from the med gas room running horizontally to the
vertical shaft. Both must be within 2 hour rated shafts and run to the exterior of the building. This is
not shown on the plans.
3. No section/construction detail was provided. (previous item 1)
4. The mechanical plans for PSASC (permit application 2006-0758 shows a different mechanical design of
the med gas room ventilation and shaft locations/sizes. This needs to be coordinated.