20060817134921.pdfCity of Edmonds E,: ;::,tp PLAN REVIEW COMMENTS BUILDING DIVISION �sr 1$90 (425) 771-0220 DATE: August 17, 2006 TO: Paul Monson Baja-Buildin@msn.com FROM: Jenny Readwin, Plans Examin� RE: Plan Check # 2006-0781 ``�� �� Project: Rybienik Addition Project Address: 24226 77' PL W During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) ok 2) ok 3) ok 4) ok 5) Crawlspace access shown for existing crawlspace area but how will access be obtained in new crawlspace area? Show size and location of crawlspace access. 6) ok 7) Engineer of Record to specify nailing of multiple studs specified under B4 (7) 2x studs as well as well as post to beam connector. Specify all hangers for hung beams as well as show posts/multiple studs to verify beam spans and how all loads are carried to bearing. 8) ok 9) ok 10) ok 11) Specify spacing of 2x8 joists and specify if rigid insulation will be used. 2x8 joists will nto accommodate the required R-30 floor insulation (must be at least 2x.10). Specify floor framing at the proposed entry (i.e. floor joists, slab on grade, etc.) and add applicable information to the details. 12) ok 13) Still need. No response given. Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. Epoxy anchor bolts/holdowns CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT The project at issued under building permit number 4requires special inspection and/or testing per TBC Chapter 17. The complete list of special inspections is attached to this document. BEFORE A PERNIIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification when performing special inspections on site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis—meaning that the special inspector is onsite at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plait deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each'special inspector shall complete and sign both the special inspection record and tate daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. .Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: • Description of daily inspections and tests made with applicable locations • List of all tion -conforming items • Report on status of non -conforming items (resolved or unresolved) • itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. S. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to.the best of i.:1TEMP113Uil.l)TNG1SpeciallnspectionAgxeementiBC.doe 7/04 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were required, etc) shall be specifically itemized in this report. R. Contractor Responsibilities I.. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved plans The contractor is responsible for providing the special inspector access to approved plans at,the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C_ City of Edmonds Building Department Responsibilities 1. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. His/Her approval must be obtained prior to placement of concrete or other similar activities in addition'to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted. D. Owner Responsibilities The project owneir or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. Owner ACKNOWLEDGEMENTS X have read and agree to comply with the terms and conditions of this agreement. Date Special Inspector Date General Contractor City Building Official i._1TEMPWUII.DING1SpeaiallnspectionAgreemientlBC.doc 7104 Date Date SPECIAL INSPECTION AND TESTING SCHEDULE Ku rR wnii s.. TEsTmawscriON AUEWra.SPECMLRrs cTtrtc ' REINI:'ORCED CONCRETE, GUNITE, GROUT AND MORTAR: STRUCTURAL STEF,IJWELDING: Caaaxee Ganite cant Mortar- — Sample and Test fag specific membexs below) Aggr-puc Tests — Shop Mat¢nal Identification RgnEotcing-Tcsrs Wcidin€inspectors OSbop ©Fuld Mix Dcsigm � iilttasotric Inspection 0 ShV 0 Fic[d Reioforting Platcarctu — High-54vasth Bolting Batch Plant Inspection bspection OShop -0Field IASpcct Placing 3 A325 Cast Samples © D A490 N [J 7C . ❑ F pick-up Samples — Metal Dodi Wclding Inspectim Compression Tests .. _ Reinforcing Sled Welding;nspection I meu1 Stad welding Inspection PRECAST%P$E'.STRESSED CONCRETE: ._ Cor um Insert Welding Inspection Film Poet Tema Pre -Tem Cladding Aggreltate Fcsrs FIREfR©OI`IN' G: Reinforcing Tests — Placrmem Inspection Tendon Tests Density Tests Mix Desiens ThickncxsTcsrs Reinforcing Placement — Inspect Batching Insm Placcmmt Concrete $arching INSULATING CONCRETE: Corscrert Placement Sample and Test Installation Insepcdon Placement Inspection Cosi SOMPILS —Unit Weights Pick-up samples Campressian Tests FILL MATERIAL: MASONRY:_ — Aeceptame Tests Placement Inspection — Sp—W Inspec tion Snesscs Used - — Frcld Density — Preliminary Acceptance Tests (Masoaty units. Wail Prisms) — Subsequent Tests (Mortar. Grout. Fido Wan Prisma} STRUCTURAL WOOD:. — Placement Inspection of units _ Sbem Wall Nailing Inspection Inspection of0u-lam Fib. — InspeclionofTruss Joist Fab - ADDITIONAL INSTRUCTIONS OR OTHER TESTS --- Sampk mW Test Components Fom coinpkted by: Fide: Telephone No.: [Yate: