Loading...
20060821091725.pdfIncl-.cj0 CITY OF EDMONDS 121 5TH AVENUE NORTH • EDMONDS, WA 98020 • (425) 775-0220 • FAX (425) 771-0221 Website: wwwxi.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Mr. Monte Clouston 20180 Winston Loop Bend, Oregon 97701 RE: EHB 1848 VIA FACSIMILE Dear Mr. Clouston, GARY HAAKENSON MAYOR August 21, 2006 In response to your inquiry regarding EHB 1848, the City is only required to retain building enclosure design documents when building permits for construction or rehabilitative construction (of multi -unit buildings as defined in the house bill) are required. When permits are required the application trust include building enclosure design documents and details (prepared and stamped by a Washington State licensed Architect or Engineer) that identifies the building enclosure construction (i.e., waterproofing, weather proofing and/or other protection from water or moisture intrusion). Note in the case of multi- unit buildings under one ownership this requirement may be waived if a recorded irrevocable Sale Prohibition Covenant is submitted with the application and recorded with the Snohomish County Auditors office. The City is prohibited from issuing a permit for construction or rehabilitation/repair construction unless proper building enclosure documents and details are provided (unless a covenant is provided as stated above). Rehabilitative construction means construction work on the building enclosure (i.e., roofs, exterior wails, decks, windows, exterior doors, vents, etc.) that costs more than 5% of the assessed value of the building (assessed building value is determined by the Snohomish County Assessors' records). When the 5% rule applies, required Building Enclosure Design documents and special inspection are required. Specifically regarding the multi -unit building at 1115 4th Avenue South in Edmonds, you have indicated you are the sole owner of the building, you have also provided sufficient evidence that the building enclosure work performed under building permit #2006-0687 does not exceed the 5% rehabilitative rifle --therefore EHB 1848 does not apply to this specific project. If you have opted to voluntarily produce building enclosure documents you can request to the City in writing that said documents be filed with the referenced building permit but the documents will not be reviewed nor approved by the City. Sincerely, 6* Jeannine TL.raf Building Official • Incorporated August 11, 1840 • �icior f i�� _ 1-Ial.inan .Tarin