Loading...
20060823091239.pdfOF FbA-10 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION Fsr. 3 s9° (425) 771-0220 DATE: August 23, 2006 TO: Dan Dean 8511218' St SW Seattle, WA 98026 FROM: Jenny Readwin, Plans Examer RE: Plan Check # 2006-0927 Project: Dean Pool Project Address: 8511218' St SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised pians/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) A search of our archive records shows that in 1967 the rear "existing garage building" was converted to a Guest House. No permits were shown to convert it back to a garage. Please clarify use of space for rear detached building. 2) Show pool equipment location on the site plan. Note: mechanical equipment supported from the ground shall rest on level concrete or equivalent base not less than three (3) inches above ground level. All outdoor heating and electrical equipment shall be approved for outdoor installation. 3) Provide detail of fence and gate to show that they comply with the pool requirements in our Swimming Pool Handout B75 attached. Also clarify on the site plan full extent of 6' fence required to enclose pool area. 4) Provide the piping layout, indicate all pipe sizes, indicate how pool will be filled, indicate if a chemical injection system will be used, etc. Specify type and model of each cross connection control device. 5) Per the 2004 Washington State Energy Code all heated swimming pools shall be equipped with a pool cover. Please specify on the plans type of proposed pool cover. 6) Engineer of Record to verify that new pool retaining wall will not have a surcharge imposed on it from the existing garage foundation 3' away. if a surcharge will be imposed provide calculations to justify wall was designed to carry this additional load.