Loading...
20060824124818.pdf01� ED4 City of Edmonds O v � � PLAN REVIEW COMMENTS BUILDING DIVISION 025) 771-0220 DATE: August 10, 2006 TO: Thrnh Tram 8410 Main Street, Suite B Edmonds, WA 98020 FROM: Ann Bullis, Assistant Building Official RE: Plan Check # 2006-0915 Project: Plumbing permit application for 3 pedicure chairs Project Address: 8410 Main Street In reviewing the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please submit 2 sets of revised plans/documents to Marie Harrison, Permit Coordinator. Please have our plumber help you provide information and plans for the following comment - QProvide manufacturer's installation instructions for the pedicure chairs. x Show the water supply piping (type, size and layout) on the floor plan for both hot and cold water, where it enters the tenant space and is run to all plumbing fixtures. Reduced Pressure Backflow Assembly (RPBA) required to protect the public water system within the tenant space. d If the chairs are not plumbed at the end of the water supply line, then one RPBA is required for each chair. Show location(s) of the RPBAs on the plumbing plan. 511 kE OOT't COt-A F%AV 7a 64^6* 40 How will the water be drained from the pedicure chairs? If they are connected to the sanitary waste IM-C44- �� ��� system, show drain, waste, and vent piping (layout, sizing, slope, pipe material). Ar The Public Works Department is requiring premise isolation (RPBA) to protect the public water system where the water supply line enters the tenant space. Please show this on the plan; and contact Linda McMurphy, Cross Connection Control Specialist at 425-771-0235 if you have any questions regarding this item. Attachment: Plumbing Permit Submittal Requirements handout with highlighted items. VTPM5 1t3�1+,�5-- MVF, y 7l.6-A-sV-; c071TIA� ► e— 45NoaPXA ODI I�� I r yet) 4 TOF-s?C�Q 5.